
Adaptable Senior Software Engineer talented at providing customized and optimized solutions for all Integration related topics. Thrives within tight deadlines by applying preferable strategies to meet the requirement . Comfortable overseeing large-scale Integration and Testing teams .
Role : Senior Integration And Configuration Engineer
· Performed ECU Board Communication Testing in AUTOSAR like CAN, Flex ray, Ethernet, LIN.
· Have an Hand full of experience on DoIP, Dlt, SoAd , SD and SomeIpTp concepts.
· Work Experience on Rh850 and Unicon Boards along with Lauter Bach , PLS and Multi Debuggers
· Taken roles like Release Engineer, Build Manager and Team Lead for Continuous Integration Topics.
· Developed Scenario Based Test Libraries to perform Automatic test cases which perform tests and generate reports.
· Had good interaction with other Scrum members to gain good knowledge on topics like OS, RTE and Simulation.
· Been part of CX technology: Continuous Build, Continuous Testing and Continuous Deployed in order to produce a reliable product which s bug free and more efficient.
· Have been part of Innovative team in order to invent new automotive tools which would help to make work more easy and efficient.
· Created new Hardware Objects and reference. Debugged and modified software components in case of test case failure.
PROJECT #1: Daimler-IoT Addition of Sub-System Feature - SomeIpTP
Responsibilities:
1. Configuration of Basic Software Layers and Inter module communications.
2. Basic Testing
Description:
Large amount of data is been transferred which is been serialized in Transformers and transferred to the lower layers and gets segmented in SomeIpTp Module and sent back with header addition in to segments.
Modules Involved (Basic overview Modules in Configuration): RTE, Transformers, LdCom,PduR,SoAd,SomeIpTp
PROJECT #2: DoIp-Extension
Responsibilities:
1. Configuration of Basic Software Layers and Inter module communications.
2. Basic Testing
Description:
Multiple Interface configured and gets distinguished by mean of Activation Line Switching Internally and Externally. Gateway Configuration is also done Eth frames are captured even in Can.
Modules Involved (In Configurations): ComM, TcpIp, EthIf, EthSm, SoAd, Sd,PduR,DoIp
PROJECT #3: CPFLEX(Classic Platform Flexibility)
Responsibilities:
1. Creating Cluster Environment – Host Cluster and Application Clusters
2. Dio & Dlt Configurations.
3. Migrating Cluster Project to Swcb build environment.
Description:
PRP Host Cluster is the Platform Project strand with additional BSW Configuration with components like
Transformers and RTE Interfaces. The Rte Interfaces will be used by the cluster to Read and Write data to Host Cluster.
Role: Integrator and Tester along with Release Activities.
· Performed all testing and troubleshooting methods and Documented resolutions in the system.
· Wrote test cases so that the application could be tested in a legitimate environment.
· Worked closely with the other departmental peers to develop high availability solutions for mission-critical applications.
· Built, tested and deployed scalable, high available and modular software products.
· Identified and suggested new technologies and tools for enhancing product value and increasing team productivity.
· Debugged and modified software components.
· Collaborated with the developers and performance engineers to enhance support ability and identify performance bottlenecks.
PROJECT #1: JAC -S7 & JAC HYBRID CLUSTER
JAC Role: Team Lead, Build Manager & Release Manager.
Tools & SW used: CANoe(CAN), CM Synergy, Change Synergy, Hex View, Programming System, GHS, ICals, VMWare, Saint Engine and Saint Monitor Bus.
Responsibilities:
1. Building the Entire Package using CM Synergy after the Check In’s done by the developers.
2. Doing the Smoke Test (Random Testing), Finding Major showstopper issues.
3. Then Baseline and Release Activity.
4. Integration Testing (Functionality Testing).
PROJECT #2: GWM CLUSTERGWM Role: Testing.
Tools & SW Used: CAPL Script , CAN, ICals , Manual setup. Responsibilities:
1. EEPROM Corruption -Finding the Issue Factor.
2. Trying to Reproduce in all the Variants Several time.
3. Finding the Root Cause.
PROJECT #3: SGM 358 CLUSTERSGM Role: Build & Release Manager.
Tools and SW Used: CANoe, Plastic SCM, CM Synergy , Change Synergy, TeraTerm , Saint Engine and Saint Monitor Bus, GHS, Perl and Python.
Responsibilities:
1. Build Activities.
2. Smoke Test
3. Baseline and Releasing.
4. Integration Testing.
Requirements gathering
Technical Support
C
C
Autosar
Integration of Basic Software Components
CAN
Ethernet
LIN
Jenkins
ALM
Synergy Chain & CM
CX Topics
Diagnostics - UDS
Lauter Bach Debugger and tools
PLS Debugger and Tools
Plastic SCM
DOORS
JIRA
Agile Work Flow and Process
Integration Testing
Sub-System Level Integration and testing
AUTOSAR Tools
Building Software
Requirement Analysis
SDLC
STLC
I would like to keep myself entertained just by
Watching Movies
Listening to Music
Playing Games Indoor and Outdoor
Dance is something i love the most
Adventure trips
Learning new recipes