Summary
Overview
Work History
Education
Skills
Timeline
Hi, I’m

Jamond Loftis

Amarillo,TX

Summary

Forward-thinking individual with commercial and industrial boiler experience. Offering more than Number years of inspecting and testing piping systems. Known for accuracy and efficient work. Skilled Job

Title with experience in assembling and installing pipes, boilers and other large industrial equipment. Proven ability to troubleshoot and repair emergency issues. Works well both independently and as part of team.

Overview

11
years of professional experience

Work History

Beard Construction

Journeyman Pipefitter
05.2023 - 05.2024

Job overview

  • Fabricated, assembled, installed and maintained piping systems.
  • Completed complex projects on time through efficient time management and prioritization of tasks.
  • Ensured safe work environments by strictly adhering to industry safety standards and procedures.
  • Performed essential maintenance tasks on pipe systems to extend their life span and reduce the risk of failure.
  • Weld/Fuse poly propylene and Polyvinylidene Fluoride (PVDF) often used in ultra pure water applications

Texas Facility Solutions

Journeyman Pipefitter
01.2022 - 05.2023

Job overview

  • Threaded pipes using piping machines.
  • Demonstrated flexibility by adeptly handling various pipe materials, including steel, copper, PVC, and cast iron in different environments.
  • Coordinated movement of materials and equipment to job sites.
  • Installed piping for plumbing systems for domestic and HVAC lines.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
  • Tested and operated hydraulic and pneumatic equipment for heating and cooling systems.
  • Orbital weld— which is a welding process whereby tubes or pipes are secured as the electrode rotates (orbits) around the object to form a weld.

Miinc

Journeyman Pipefitter
12.2020 - 01.2022

Job overview

  • Performed essential maintenance tasks on pipe systems to extend their life span and reduce the risk of failure.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Prevented potential delays in construction schedules by proactively identifying potential hazards or obstacles in the workspace.
  • Established strong working relationships with colleagues across trades for better collaboration during multi-disciplinary projects.
  • Reduced material waste by accurately measuring, cutting, and assembling piping systems.
  • Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.
  • Set pumps and torqued and calibrated to right height and got the motor up to speed by troubleshooting

Blattner Energy

Wind Turbine Technician
10.2016 - 10.2020

Job overview

  • Promoted continuous improvement within the team by sharing experiences, lessons learned, and proposing process enhancements during regular meetings or training sessions.
  • Improved wind turbine efficiency by conducting regular maintenance and repairs on mechanical, electrical, and hydraulic components.
  • Performed quality audits of maintenance activities to ensure high standards are consistently met, resulting in reduced rework or equipment failures.
  • Climbed wind turbine towers to inspect, troubleshoot and repair turbine equipment.
  • Optimized turbine performance by troubleshooting issues and implementing corrective measures in a timely manner.
  • Increased team productivity by providing training and guidance to new technicians joining the workforce.

KBR

Pipefitter
01.2013 - 12.2016

Job overview

  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Replaced faulty parts and repaired structural damages to pipes and related components.
  • Reduced project completion time by interpreting blueprints, sketches, and specifications to accurately plan pipefitting installations.

Austin Industries

Boilermaker
01.2016 - 11.2016

Job overview

  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Built and repaired process tanks, storage tanks and water treatment tanks.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Identified issues and addressed each immediately with job foreman.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Supervised Number apprentices and offered specific recommendations to improve work quality.
  • Operated forklifts, bobcats and track hoes.
  • Coordinated movement of materials and equipment to job sites.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.

Education

Frank Phillips College
Borger, TX

Skills

  • Pump Installation
  • Flange Assembly
  • Pipe threading
  • Hand and power tools
  • Pipe Measuring
  • Installation and maintenance
  • Pipe Alignment
  • Pressure testing
  • Safety Procedures
  • Material prepping
  • Pipe fitting
  • Pipe Insulation
  • Equipment testing
  • Equipment Installation
  • OSHA Regulations
  • Commercial pipefitting
  • Pneumatic Systems
  • Blueprints and Specifications
  • Steam Systems
  • Pipe Hangers
  • Boiler installation
  • Pipe rigging
  • Materials Ordering
  • Systems troubleshooting
  • Blueprint Analysis
  • Project Management
  • Skilled with both hand and power tools
  • Heavy Lifting
  • Layout planning
  • OSHA Compliance

Timeline

Journeyman Pipefitter

Beard Construction
05.2023 - 05.2024

Journeyman Pipefitter

Texas Facility Solutions
01.2022 - 05.2023

Journeyman Pipefitter

Miinc
12.2020 - 01.2022

Wind Turbine Technician

Blattner Energy
10.2016 - 10.2020

Boilermaker

Austin Industries
01.2016 - 11.2016

Pipefitter

KBR
01.2013 - 12.2016

Frank Phillips College

Jamond Loftis