[10 years ] years of construction industry experience, efficient and safe equipment operations and on-time project completion. Communicates precisely with crew and management to promote project completion and adherence to safety protocols.
I was in charge of all under ground pipe line projects.
I did all Digging with Cat 314 excavator and backfill with 920 Cat front loader. all compaction was done in 2 ft lifts and with jumping jack.
Type of pipe that was installed was c900 8" water line with 8" butterfly valves along with sdr. 6"-36" drainage systems and 8" sewer systems and man hole settings.
My job also included:
Surveying elevations for pipeline
Material lists
and insepctions