Summary
Overview
Work History
Education
Skills
Timeline
Generic

Arthur Connor

Kingshill,St Croix

Summary

Quality-focused foreman/ Lead tile setter with 19 years of experience managing wide range of production activities. Driven to consistently achieve goals by allocating resources, overseeing budgets, directing employees and meeting deadlines. Talented at exceeding quality expectations by reviewing quality control report information to devise targeted changes for improving processes and performance.

Overview

35
35
years of professional experience

Work History

Foreman/ Lead Tile Setter

GEC LLC
St. Croix, USVI
09.2022 - 06.2023
  • Planned and handled more than 3-5 installation jobs each month.
  • Followed all general safety measures and used tools and machinery properly to avoid mishaps.
  • Greeted all customers/homeowners cheerfully and provided expert service.
  • Devoted special emphasis to punctuality and worked to maintain anoutstanding attendance record, consistently arriving to work ready to start immediately.
  • Developed work schedules for all team members to maximize shift coverage.
  • Coordinated materials to maintain a steady flow and meet productivity objectives.
  • Delegated assignments based on site plans, project needs, and knowledge of individual team members.
  • Supported field crews to maximize quality and work efficiency.
  • Evaluated team member strengths and assigned tasks based on expertise and background.
  • Trained new workers.
  • Maintained power equipment and power tools.
  • Planned and handled more than 2 installation jobs each month.
  • Delivered excellent customer service, promptly addressing concerns and questions.

Lead Tile Setter

Stevens Construction VI LLC
St. Croix, USVI
05.2021 - 08.2021
  • Followed all general safety measures and used tools and machinery properly to avoid mishaps.
  • Leveled surfaces using plywood and mortar prior to laying marble and tile.
  • Used power wet saws and tile cutters to cut tiles to specifications for projects.
  • Used safe lifting, equipment and behavioral practices.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Managed hiring and training of crew members for projects.
  • Troubleshoot equipment problems and completed repairs and maintenance actions.

Foreman

GEC LLC
St. Croix , USVI
03.2021 - 04.2021
  • Used power wet saws and tile cutters to cut tiles to project specifications.
  • Followed all general safety measures and used tools and machinery properly to avoid mishaps.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Reviewed blueprints and specifications to determine the labor and materials required to complete the tiling project.
  • Leveled surfaces using plywood and mortar before laying marble and tile.

Foreman / Lead Tile Setter

J. Benton Construction, LLC
St. Croix, USVI
10.2018 - 02.2020
  • Assisted with installation, repair, and rebuilding of tile-related structures working in collaboration with tile setter.
  • Finalized installations with sealing agents and smooth lines of caulk.
  • Spread grout between grout joints, remove excess materials, and smooth finishes for a professional look.
  • Helped tile setter complete skilled work by coordinating needed supplies and equipment based on specific job requirements.
  • Set up and removed support structures such as folding ladders and scaffolding.
  • Readied surfaces for smooth installations by removing damaged materials and correcting minor imperfections.
  • Used power wet saws and tile cutters to cut tiles to project specifications.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Leveled surfaces using plywood and mortar prior to laying marble and tile.

Foreman / Lead Tile Setter

GEC LLC
St, Croix, USVI
10.2016 - 09.2018
  • Leveled surfaces using plywood and mortar prior to laying marble and tile.
  • Reviewed blueprints and specifications to determine labor and materials that would be required to complete tiling project.
  • Used power wet saws and tile cutters to cut tiles to specifications for projects.
  • Used safe lifting, equipment and behavioral practices.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Completed skilled repairs of existing tile installations.
  • Created watertight finish on tiles by sealing surfaces and adding grout.
  • Cut and prepared tiles for installation following precise measurements and job specifications.
  • Learned about various tile types, sizes and installation techniques and stayed current on industry changes.
  • Inspected floors before, during and after tile installation and reported identified concerns.
  • Resolved problems arising during tile installation process, maintaining quality and code compliance.
  • Used specialized tools and equipment to cut, shape and install tile.
  • Helped supervisors create cost estimates for tile installation projects.
  • Installed tile flooring in residential homes and commercial buildings.

Foreman / Lead Tile Setter

GEC LLC
Saint Croix, USVI
01.2016 - 09.2016
  • Reviewed blueprints and specifications to determine labor and materials that would be required to complete the tiling project.
  • Used power wet saws and tile cutters to cut tiles to specifications for projects.
  • Used safe lifting, equipment, and behavioral practices.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Completed skilled repairs of existing tile installations.

Supervisor

DB Marble & Tile
Saint Thomas, ND
01.2015 - 12.2015
  • Evaluated employee performance and coached and trained to improve weak areas.
  • Maintained compliance with company policies, objectives, and communication goals.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Monitored workflow to improve employee time management and increase productivity.
  • Mentored newly hired employees on operating equipment and safety and developed training manual to use for reference.
  • Created and managed project plans, timelines and budgets.
  • Evaluated staff performance and provided coaching to address inefficiencies.
  • Conducted regular reviews of operations and identified areas for improvement.
  • Created successful work schedules for each team member to maintain deadlines and fully staff shifts.

Foreman / Lead Tile Setter

GEC LLC
St, Croix, USVI
09.2011 - 12.2014
  • Reviewed blueprints and specifications to determine labor and materials that would be required to complete the tiling project.
  • Leveled surfaces using plywood and mortar before laying marble and tile.
  • Used safe lifting, equipment, and behavioral practices.
  • Used power wet saws and tile cutters to cut tiles to project specifications.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Completed skilled repairs of existing tile installations.
  • Created watertight finish on tiles by sealing surfaces and adding grout.

Foreman

DB Marble & Tile
Saint Thomas, USVI
01.2006 - 07.2011
  • Achieved results by working with staff to meet established targets.
  • Enforced rules and regulations outlined in company manual to set forth expectations comprehensibly and consistently.
  • Created successful work schedules for each team member to maintain deadlines and fully staff shifts.
  • Evaluated employee performance and coached and trained to improve weak areas.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Monitored workflow to improve employee time management and increase productivity.
  • Conducted routine inspections to check quality and compliance with established specifications.
  • Mentored newly hired employees on operating equipment and safety and developed training manual to use for reference.
  • Created and managed project plans, timelines and budgets.
  • Boosted team performance by developing customer service training materials and conducting service training.
  • Evaluated staff performance and provided coaching to address inefficiencies.

Tile Setter

Island Tile & Marble
Saint Thomas, USVI
01.2004 - 12.2005
  • Leveled surfaces using plywood and mortar prior to laying marble and tile.
  • Used power wet saws and tile cutters to cut tiles to specifications for projects.
  • Used safe lifting, equipment and behavioral practices.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Used specialized tools and equipment to cut, shape and install tile.
  • Created watertight finish on tiles by sealing surfaces and adding grout.
  • Cut and prepared tiles for installation following precise measurements and job specifications.

Tile Setter

Gem Tile Setter
The Valley, Anguilla
01.2000 - 08.2003
  • Used power wet saws and tile cutters to cut tiles to specifications for projects.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Completed skilled repairs of existing tile installations.
  • Installed tile flooring in residential homes and commercial buildings.
  • Cut and prepared tiles for installation following precise measurements and job specifications.

Tile Helper / Grouter

Morton Tilers
The Valley, Anguilla
01.1988 - 10.1999
  • Learned about various tile types, sizes, and installation techniques and stayed current on industry changes.
  • Completed skilled repairs of existing tile installations.
  • Maintained a safe, clean, and organized work environment.
  • Worked professionally with other tradespeople on successful, on-time project completion.
  • Set up and removed support structures such as folding ladders and scaffolding.
  • Applied caulk, sealants, or other agents to installed surfaces.
  • Mixed mortar, plaster, and grout, manually, or using machines according to standard formulas.

Education

High School Diploma -

College De Marigot
ST. Martin
10.1981

Skills

  • Floor and wall projects
  • Commercial and residential assignments
  • Organization
  • Properly maintaining power equipment/power tools
  • Tile installation
  • Hand tools,Power tools
  • Team building
  • Coordinating Maintenance
  • Preventive Maintenance Services

Timeline

Foreman/ Lead Tile Setter

GEC LLC
09.2022 - 06.2023

Lead Tile Setter

Stevens Construction VI LLC
05.2021 - 08.2021

Foreman

GEC LLC
03.2021 - 04.2021

Foreman / Lead Tile Setter

J. Benton Construction, LLC
10.2018 - 02.2020

Foreman / Lead Tile Setter

GEC LLC
10.2016 - 09.2018

Foreman / Lead Tile Setter

GEC LLC
01.2016 - 09.2016

Supervisor

DB Marble & Tile
01.2015 - 12.2015

Foreman / Lead Tile Setter

GEC LLC
09.2011 - 12.2014

Foreman

DB Marble & Tile
01.2006 - 07.2011

Tile Setter

Island Tile & Marble
01.2004 - 12.2005

Tile Setter

Gem Tile Setter
01.2000 - 08.2003

Tile Helper / Grouter

Morton Tilers
01.1988 - 10.1999

High School Diploma -

College De Marigot
Arthur Connor