Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Aarin Limbrick

Fort Worth,TX

Summary

I'm submitting my resume to be considered for a vacancy at a stable organization that could utilize my diverse welding skillset.

Overview

4
4
years of professional experience

Work History

Welder

Wabtec Locomotive Services
10.2023 - Current
  • Welded in flat, horizontal, vertical, and overhead positions.
  • Maintained clean working environment by consistently organizing tools and equipment, promoting workplace safety.
  • Demonstrated versatility in various welding methods including MIG, TIG, Stick, and Flux Core Welding techniques.
  • Fabricated shop parts directly from blueprints.
  • Completed welding projects using gas tungsten arc, gas metal arc, flux-cored arc, plasma arc, and shielded metal arc equipment.
  • Collaborated with team members for seamless project execution, improving overall productivity.
  • Set up and operated shielded metal arc and gas metal arc welding equipment.
  • Chipped off excess weld, slag, and spatter using hand tools.
  • Troubleshot technical issues during the welding process, minimizing downtime on projects.
  • Mentored junior welders, sharing knowledge to enhance their skill sets and career development.

Tank Welder

Geo Systems USA
02.2023 - 06.2023
  • Assisted with troubleshooting and problem-solving on complex tank welding issues, resulting in minimal production delays.
  • Aided in reducing project costs by minimizing material waste through efficient preparation of materials for welding processes.
  • Reduced rework rates by proactively identifying potential issues during the fabrication process and addressing them promptly.
  • Optimized workflow through proficient use of lifting equipment such as cranes or forklifts, ensuring the safe and timely movement of materials throughout the worksite.

Combination Welder

Mestex
01.2021 - 02.2023
  • Consistently met deadlines for complex welding projects, coordinating with team members for efficient task completion.
  • Boosted customer satisfaction by addressing concerns, answering questions, and providing clear communication on project status and timelines.
  • Ensured high-quality results by interpreting blueprints, schematics, and technical drawings prior to beginning each project.
  • Achieved precise alignment of parts using fixtures, jigs, clamps, or other positioning devices before welding operations.

TIG Welder

ConeCraft
05.2020 - 01.2021
  • Supported team members in troubleshooting technical issues during the welding process, ensuring minimal downtime and consistent production rates.
  • Collaborated with team members for smooth workflow, resulting in increased productivity and timely project completion.
  • Enhanced product quality by performing precise TIG welding on various materials.
  • Resolved any identified defects or inconsistencies promptly during the welding process to minimize rework time spent on corrections later on in production stages.

Education

Combination Welder Diploma in Welding -

Tidewater Tech
Norfolk, VA
04.2020

High School Diploma -

Potomac
Woodbridge, VA
06.2014

Skills

  • Skilled in both mechanical and manual welding practices
  • Strong ability to read and interpret engineering drawings and blueprints
  • Familiar with all four most popular welding types: shielded metal arc welding (SMAW), gas metal arc welding (GMAW / MIG), and flux cored arc welding (FCAW), and gas tungsten arc gas welding (GTAW / TIG)
  • Welded joists, columns, and girders into place in accordance with given blueprints

Additional Information

Performed inspections, Troubleshooting Machines, Performed repairs on faulty machinery, Tanks can be built as small or as large as needed. Tanks are built to the specifications of each job. Safety requirements like handrails and manways will vary so the design will meet the local code and/or project requirements as specified by the customer., Required to fit pipe, groove pipe, and cut pipe., Pipefitter, Fabricated 8'-13' Surge Tanks for fire protection., Welded base frames for computerized building, Processes mainly used were Flux Core .45 wire and MIG .35 wire, Also fabricated wall frames to hold interior frames., Specialized in bins for single-use bags, carts for single-use filters, and tube management solutions. Material mainly used was stainless steel., ASME Certified, Familiar with metal thickness 8g-14g, AWS D1.1, Structural Welding Code-Steel SMAW E7018, 3G Position, 1/8" to 3/4", AWS D1.1, Structural Welding Code-Steel FCAW E71T-1, 3G Position, 1/8" to 3/4", AWS D1.1, Structural Welding Code-Steel FCAW E71T-1, 4G Position, 1/8" to 3/4", Occupational Safety and Health Administration (OSHA) 10-Hour Safety Maritime Certification

Timeline

Welder

Wabtec Locomotive Services
10.2023 - Current

Tank Welder

Geo Systems USA
02.2023 - 06.2023

Combination Welder

Mestex
01.2021 - 02.2023

TIG Welder

ConeCraft
05.2020 - 01.2021

Combination Welder Diploma in Welding -

Tidewater Tech

High School Diploma -

Potomac
Aarin Limbrick