I am applying for a full-time position as Assembler/ Warehouse/ Manufacturing starting in October 2025
Overview
19
19
years of professional experience
Work History
Assembler 2
Armorworks
09.2023 - Current
Assembled components accurately following technical specifications and safety protocols.
Operated various machinery including conveyor belts and forklifts to streamline assembly processes.
Collaborated with team members to optimize workflow, reducing downtime during production cycles.
Inspected finished products for quality assurance, ensuring compliance with industry standards.
Trained new employees on assembly techniques and safety practices to enhance team efficiency.
Implemented process improvements that enhanced operational efficiency and reduced waste in assembly line operations.
Maintained organized workstations, promoting a safe and efficient production environment.
Conducted routine maintenance on equipment, minimizing disruptions and extending machinery lifespan.
Increased production efficiency by assembling components quickly and accurately.
Demonstrated a strong work ethic by consistently arriving on time, prepared to begin work immediately, and contributing positively to the team''s overall success.
Assembler
Keen's Recycling
07.2023 - 09.2023
Assemble frames for AC components per drawings and blueprints.
Use power tools such as table saw, miter saw, drills and nail gun safely per regulations.
Maintain a clean and organized work area.
Composite Technician
Boeing Aerostructures
06.2022 - 12.2022
Inspect and repair composite aircraft panels, side rails, and stabilizer.
Check panels for delamination with the tapper tool with vacuum system, TCS, and pass leak check along with quality assurance.
Utilizing epoxy and repair performed maintenance checks on the tooling according to SOPs.
Assembly & Test Technician III
Honeywell Aerospace
04.2017 - 05.2019
Assembly of the 131-9A and 9B Overhaul
Assembly of the 131-9A and 9B
Assembled and tested APU systems from the ground up.
Repeated demonstration of quality, efficiency, and safety.
Assisted in the implementation of process improvements on the system.
Worked with engineering to develop and implement process improvements using 8D Corrective Instructions (CIs) to improve manufacturing processes and reduce defects. Implemented new processes by creating work instructions and flow charts for others to use in the L&OP department.
Helped train and coach new employees. Monitored their progress and provided feedback.
Assembler
Ultratech Technologies (ATK)
04.2011 - 10.2011
Assembled and tested components for the Clean Room environment.
Followed detailed work instructions, blueprints, and drawings and documenting work instructions to ensure accuracy of work performed.
Worked with engineering and team members to encourage effective communication and to initiate process improvements.
Baggage Handler
Mesa Airlines (US Airways)
08.2006 - 03.2011
Checked baggage to transport various items, including glass, and HAZMAT materials.
Assisted in shipping hardware to their proper destinations and receiving hardware to their respected location.
Parts Developer
San Tan Aviation
03.2010 - 11.2010
Troubleshoot electronics, cabling, and circuit boards for avionics using OEM part specifications.
Parts developer for avionics.
Assisted in shipping hardware to their proper destination, receiving hardware, and shipping and receiving.
Education
High School Diploma - undefined
Dobson High School
Mesa, AZ
01.2006
Skills
Arc, MIG, TIG Welding, Brazing and Soldering
Microsoft Office Products
Personal: Stress, Anxiety and Repair
Legacy (BMS) Software
Semi-conductive Assembly and Clean Room Experience
Construction: framing, dry wall, plumbing, concrete, renovations, windows
No Job Complete, Comply
Carpentry
Entry Level CNC machining (AutoCAD)
Limited proficiency in American Sign Language (ASL)