QA/QC professional with 8 years of experience in the oil and gas industry. Skilled in welding, piping, pipeline, structural, mechanical, tanks, vessels and coating inspections. Overseeing quality across complex construction, fabrication, and commissioning projects. Adept at leading inspection teams, ensuring compliance with international standards, and driving continuous quality improvement. Strong communicator with a proven track record in client coordination, documentation management, and successful project handovers in high-pressure environments.
Responsibilities
Projects:
Project title: DS04- FLOW TANK DEWATERING PROJECT-MOC259. 2024-present
The objective of this project to eliminate the discharge of free water into open, uncontained areas by redirecting it to closed systems. This aims to minimize environmental impact, ensure regulatory compliance, and enhance the overall efficiency of water management within the production facilities.
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: DS03-CONNECTION OF SKIMMED OIL LINE TR1 TR2 2ND STAGE SEPARATORS INLET. 2024-2025
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: DS04 TANK 5 TRANSFORMATION TO PRODUCED WATER SERVICES. 2024-2025
The objective of this project To enhance produced water management at DS04 by converting Tank 5 into a Produced Water (PW) buffer tank. This will mitigate disposal interruptions due to PWD skid upsets and power outages, improve water quality by enabling better oil-water separation, and protect the injectivity of Dammam disposal wells
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: DS04 MOC317/MOC346/MOC332 TEMPORARY PRODUCED WATER DISPOSAL CAPACITY UPGRADE. 2023-2024
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: DG04 BLACK FLARE IMPROVEMENT PROJECT. 2023-2024
The objective of this project To design and implement a new air-assisted common flare system for DS04 flow tanks (Tanks 2, 3, 4, and 5) to improve combustion efficiency, reduce smoky emissions, and achieve Ringelmann 1 performance.
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: DG04 - LLTV (PHASE - 1 & 2) PROJECT.2023-2024
LLTV Project To minimize health and safety risks from flash gas venting by upgrading vent systems and recovering valuable condensate, especially in Rumaila’s degassing stations where poor system conditions and underground line blockages pose operational risks.
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Responsibilities
Projects
Project title: DG04 - LLTV (PHASE - 1 & 2) PROJECT.2022-2023
LLTV Project To minimize health and safety risks from flash gas venting by upgrading vent systems and recovering valuable condensate, especially in Rumaila’s degassing stations where poor system conditions and underground line blockages pose operational risks.
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: Shamiya Export Manifold Anomalies and UG/AG piping Scope, Shamiya degassing station DG-10. 2023
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: Shamiya Renaissance project Shamiya degassing station DG-10. 2023
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/KBR
Project title: Over pressure protection project,(civil steel structure and piping) Mishrif Shamiya degassing station
DG-13. 2023
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: Installation of new isolation valve downstream of the Booster Pump and downstream of the gas turbine, Qurainat degassing station DG11. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: Re-routing 3rd and 4th stage separator gas PCV lines to existing Train A/B LP flare header for Train A/B/C, Qurainat degassing station DG11. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: Strainer upstream of train a FWKO, Qurainat degassing station DG11. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: piping Instrument air line upgradation Qurainat Degassing station DG-11. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: Qurainat renaissance, Degassing station DG-11, MOC-198 process Vent. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: Produced water disposal piping phase 3 project, Qurainat degassing station DG11. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: TAR of Degassing station DG02 for over pressure protection system. 2022
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Project title: DS4 - DRAIN LINES FROM COLD VENT HEADERS TO SAFE. 2021
Location: Rumaila oil field / Basrah /Iraq
Client: ROO/Petrofac
Responsibilities
Projects
Project title: CDU No.4 LPG Unit and Boilers PU-001 Crude Oil Distillation Unit With LPG unit. 2019-2022
This project aims to increase the production capacity of the Basra Refinery from 210,000 barrels per day to 280,000 barrels per day, which will in turn contribute to an increase in the production of various petroleum derivatives.
Location: Basrah / Shuaiba Refinery
Client: SRC/ Chemoprojekt,
Project title: NGL-SPLIT FLOW TO KAZ. 2019
Location: West Qurna -Basrah – Iraq
Client: BGC
Responsibilities
Projects
Project title: Compression station 8(CS8 West Qurna 1). 2017-2018
Location: West Qurna -Basrah – Iraq
Client: Basra Gas Company BGC / Shell
Strong knowledge of international quality standards and codes (ASME, API, AWS, ISO)
QA/QC planning and execution for welding, piping, structural, mechanical, and painting works
Preparation and implementation of Inspection Test Plans (ITPs), Welding Procedure Specifications (WPS), and Procedure Qualification Records (PQR)
Proficient in conducting and supervising various NDT methods (RT, UT, MT, PT, VT, PMI)
Inspection and documentation of welding and coating activities, hydro/pneumatic testing, and final acceptance procedures
Experience with Material Traceability, Welder Qualification Tests (WQT), and compliance verification
Excellent in handling Non-Conformance Reports (NCRs), Corrective and Preventive Actions (CAPA), and punch list clearance
Strong leadership in guiding multidisciplinary QA/QC inspection teams
Skilled in preparing final quality dossiers, and project handover documentation
Client coordination and participation in quality walkdowns, and progress meetings,
Effective in promoting quality awareness, ensuring PQMS compliance, and implementing continuous improvement practices
Experienced in inspection of painting/coating systems including DFT measurement, surface prep verification, and holiday testing
CSWIP 3.1 Welding Inspector-The welding institute (TWI)
Mr.Samir Saif : QA/QC Manager Albilal Group projects
Phone no. +9647832021519
Mr. Pragash Kannan QA/QC Lead Rumila Oil Field (ROO)
Pragash.Kannan@roobasra.com
Mr. Presadu Kutty QA/QC Lead Rumila Oil Field (ROO)
Presadu.Kutty@roobasra.com
Mr. Paul Clifford QA/QC Manager KBR EPCM
+447793662147
Mr. Simon Williams QA/QC Manager KBR EPCM
Simon.Williams@kbr.com
CSWIP 3.1 Welding Inspector-The welding institute (TWI)
NDT Level II (VT, UT, RT, PT, MT) – ACC. ASNT SNT-TC-1A