Summary
Overview
Work History
Education
Skills
Timeline
Panel Integration Center Lead

Abegail Bagyan

Process Solutions & Integration
Burlington,WA
2027
years of professional experience

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Work History

Detailing

American Tug

Freelance Photographer/Aerial Photographer

N/A

Panel Integration Center Lead

5 Years 9 Months
Process Solutions & Integration | 02.2021 - Current

Wire Assistant duties;

  • Built and assembled commercial control panels per customer specifications, ensuring 100% compliance with UL 508A and NEC standards
  • Executed precision wiring of PLC I/0 cards, VFD drives, and field devices from electrical schematics.
  • Managed panel identification process, printing and applying component labels per bill of materials to ensure traceability and NEC compliance.
  • Shipping and recieving
  • Assembly

Panel Integration Center Lead duties;

  • Built and adjusted production schedules based on incoming work orders and equipment availability
  • Created standard work instructions for shift handoffs, eliminating communication gaps and improving first pass yield.
  • Owned shift scheduling and tool accountability using Kronos and Excel, while maintaining FOD-compliant workstations with engraved tools and calibrated crimpers
  • Led team of technicians across shifts, managing daily assignments, training, and performance while ensuring safety and quality standards.
  • Collaborated with engineers to ensure project success and align technical solutions with business goals, facilitating effective communication and integration.
  • Motivated technicians to improve performance by addressing weaknesses through constructive feedback discussions, fostering a culture of continuous development.
  • Guided team and monitored work to maintain alignment with shared goals, ensuring consistent progress towards project objectives.
  • Worked successfully with diverse group of co workers, customers and all levels of leaderships to accomplish goals and address issues related to our products, services and safety.
  • Managed inventory by maintaining accurate stock records and ensuring all equipment, tools, and printers and computers were operational.
  • Ship req quality control, verifying parts are accurate before shipment.

Production Technician II

2 Months
Silfab solar | 05.2024 - 07.2024

Production technician II

• Operate and watch process variables on stringers and other equipment, and adjust machines when needed

to keep production stable.

  • Flash-test every panel for power output before it ships.

• Soldering individual cells together into strings using thin copper ribbon.

Quality Control IV;

• Reviewed and updated quality control procedures to enhance compliance and effectiveness

Check for microcracks, color matching, power binning.

• Upheld company policies, productivity requirements and quality control standards.

Education

High School Diploma

Burlington Edison High School | Burlington, WA | 06.2020

Certificates

• OSHA Lockout/Tagout (LOTO) Safety

Training certificate

•AS9100D Quality Management System

(QMS) for Aerospace Industry certificate

•CPR, AED and First Aid certificate

Skills

Project management
Safety culture leadership
Technical troubleshooting
Equipment maintenance
Inventory management
Active listening
Communication and influence
Team collaboration
Attention to detail
Conflict resolution

Timeline

Production Technician II

Silfab solar
05.2024 - 07.2024Read More

Panel Integration Center Lead

Process Solutions & Integration
02.2021 - CurrentRead More

Detailing

American Tug
Read More

Freelance Photographer/Aerial Photographer

N/A
Read More

Burlington Edison High School

High School Diploma
Read More
Abegail Bagyan