Dynamic Survey Party Chief with extensive experience at Morris P. Hebert, excelling in pipeline as-built surveys and boundary surveys. Proficient in GPS surveying and total station operations, demonstrating a detail-oriented approach and a strong work ethic with the ability to adapt to evolving project requirements. Successfully collaborated with construction teams to ensure timely project completion and high-quality results.
Performed preliminary surveys which included profiling for proposed pipeline routes. Staking all easements and temporary workspace. Performed extensive boundary surveys. Assisted in selecting routes for pipelines. My primary duties have been working on multiple pipeline as-built surveys which include everything from an accurate pipeline tally, staking centerline for the construction crew, detailed weld maps. Worked with the chief inspectors and construction foremen to see that all their needs were met and the job was done in a timely manner.
Performed hazard surveys for pipeline contractors locating foreign lines on land and water.
Located lines for pipeline companies for dig site repairs on land and water.
Performed various surveys for Entergy including level A, level B, level C, structure staking, and also sag verifications.
Performing AGM surveys to segment off pipelines for tool runs. Tracked tools for pipeline companies during pig runs.
Preliminary surveys staking all easements and temporary workspace. Performed extensive boundary surveys.
Pipeline as-built surveys that include accurate
pipeline tally, staking centerline for the construction crew, detailed weld maps.
Performed preliminary surveys which included profiling for proposed pipeline routes. Staking all easements and temporary workspace. Performed extensive boundary surveys.
Pipeline as-built surveys which include everything from an accurate pipeline tally, staking centerline for the construction crew, detailed weld maps.
Performed Alta Surveys for DOTD.
Part 107
TWIC
OSHA 10
BASIC PLUS