With a proven track record at CEC FACILITY GROUP, I excel in electrical installations, including advanced lighting systems and panel upgrades. My adeptness in wiring coupled with strong teamwork abilities has significantly contributed to project successes. Notably skilled in electrical troubleshooting, my work ensures efficiency and safety in high-stakes environments.
Instalacion de pipa emt 2-1/2”
Instalacion de soportes y transformadores
Instalacion de pipa rigid 2” y 3-1/2”
Intel ocotillo fab 52
Constructora: hoffman
Instalacion de pipa emt y rigid 3/4” para luces
Instalacion de soportes
Instalacion de luces
Alambrar y terminacion de paneles
Instalacion de maquinas
Wilmer tx
Ficus data centers (stream)
Constructora: STO
Instalacion de pipa emt 1” , 1-1/4” para control
Instalacion de pipa rigid 1” , 1-1/4” para control
Instalacion de paneles de control
Plano tx
Aligned data centers
Constructora: TURNER
instalacion de dispositivos para control de luces
(Power pack, sensores, foto celdas, swiches)
Correr, alambrar cable cat5 para control de luces
Lavon elementary school
Alambrar y Terminación de paneles electrico, transformadores
Instalación de can light y wallpack
Melissa high school
Instalcion de pipa emt de 1” para distribucion
Instalacion de pipa de emt 4” para distribucion
Instalacion de postes de luces
Proyecto: QTS DATA CENTER
constructora: TURNER
Instalacion de pipas emt 3/4” y cajas para sistema de alarma contra incendio
Instalacion de pipas emt 4” para cable de datos