Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Mechatronics Technician
CWS
Fort Worth, TX
01.2022 - Current
Removed and replaced malfunctioning and worn parts to maximize system longevity and performance.
Applied functional knowledge and troubleshooting abilities to isolate and diagnose diverse faults.
Efficiently installed electrical systems and components with careful analysis of technical schematics and specifications.
Organized and managed smooth preventive maintenance tasks such as evaluating part functionality, cleaning components and removing old seals and gaskets.
Located and addressed electrical connection issues such as frayed wires and worn insulation to prevent larger problems.
Mechanical Technician
Keystone Synergy
Rhome, TX
03.2021 - 12.2021
Inspected and tested equipment, machinery and components to diagnose issues, recognize defects and determine appropriate repairs.
Identified mechanical problems and determined best solutions for correction.
Frequently diagnosed mechanical problems and determined how to correct issues.
Performed troubleshooting, diagnosis and repair of Frack Pumps and blenders equipment.
Coordinated installation of systems, machinery and components.
Developed and coordinated effective predictive, preventive and corrective maintenance approaches.
Wrote work orders and parts fabrication requests.
Cathodic Protection Engineer
SICIM
Zacatecas , Mexico
07.2018 - 12.2020
INSTALLATION AND COMMISSIONING OF CATHODIC PROTECTION
Participation in design development, installation, operation, inspection and maintenance of cathodic protection systems within an assigned segment of the piping system
Knowledge of regulatory requirements, perform associated required tasks, and complete required documentation.
Completed in-depth building inspections to assess safety and check compliance with codes NACE .
Worked with designers, building owners and tenants to review code concerns and make adequate corrective actions.
Conducted post-installation testing to establish system operations within prescribed metrics.
Liaised with external contractors to verify correct installation of designed systems.
Electrical & Instrument Engineer
SICIM
Gomez Palacios , Mexico
01.2017 - 07.2019
Installation and commissioning of electrical Systems in El Encino – LA Laguna pipeline project 12 MLVs and 2 Metering and regulating stations
Installation and commissioning of Instrumental Systems in El Encino – LA Laguna pipeline project 12 MLVs and 2 Metering and regulating stations
Confirmed system and component capabilities by designing testing methods and testing properties.
Chose components and parts such as fuses to meet job requirements.
Developed manufacturing processes by designing and modifying equipment for building and assembling electrical components and soliciting observations from operators.
Prepared product reports by collecting, analyzing and summarizing information and trends.
Monitored installation and operations to consistently meet rigorous customer requirements.
Improved methods for measurement, documentation and work flow management.
Managed engineering changes using SAP systems.
Conducted projects and performance presentations to clients and company executives.
Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes.
Electrical Engineer
SICIM
Ciudad De Mexico , Mexico
01.2016 - 01.2017
Prepared, checked and coordinated documentation to support component design and application.
Created CAD drawings in Autocad .
Education
Bachelor of Science - Mechatronic
Instituto Tecnologico Superior De Nuevo Casas Gran