Dependable Electrician skilled in performing preventive and regular maintenance work on electrical systems. Adapts to new technology and concepts. In-depth knowledge of generators, transformers and circuit breakers. Punctual and hardworking individual dedicated to cultivating excellent work ethic.
Overview
22
22
years of professional experience
Work History
Electrician
MEITEC Electrical And Instrumentation
08.2026 - Current
Assisted in maintaining MCC systems for optimal performance.
Pulled cables to facilitate electrical connectivity
Installed cable trays to organize and support electrical wiring
Worked with high and low voltage
Connected panels, transformers, lights, fans and motors
Installed, repaired, and maintained electrical systems in compliance with safety regulations.
Diagnosed electrical issues using testing equipment to ensure efficient repairs and performance.
Electrician
Hardhat Workforce Solutions,LLC
04.2026 - 08.2026
Operated machinery at MCC location
Installed and pulled cable through designated pathways
Installed cable trays for organized and secure cable management
Worked with high and low voltage
Performed termination of equipment connections
Installed and wired electrical transformers, service panels, and circuit breakers.
Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
Used testing instruments such as ohmmeters, voltmeters, ammeters, and multimeters.
Performed routine and complex maintenance and repairs on various electrical equipment.
Demonstrated expertise in use of cable reels, stripping tools, voltage detectors, and wire and cable cutters to complete fast-paced work.
Maintained compliance with local codes and regulations by staying up-to-date on industry standards and best practices.
Tested continuity of circuits in electrical wiring, equipment and fixtures using oscilloscopes.
Conducted routine inspections to ensure compliance with safety standards and regulations.
Electrician
Performance Energy Services
04.2024 - 01.2026
Collaborated on UPS system maintenance and troubleshooting.
Collaborated with MCC team on project tasks
Planned, laid out, and installed electrical wiring for equipment fixtures, ensuring compliance with safety standards.
Installed cable trays
Performed cable pulling to support wiring projects
Worked with the UPS systems.
Handled termination of equipment connections for efficient operation
Electrician
W-Industries of Texas LLC
04.2021 - 03.2024
Planned layout and installation of electrical wiring, equipment, and fixtures
Connected wires to circuit breakers, transformers, and lights for operational functionality
Completed installation of cable trays to organize wiring systems to support electrical wiring infrastructure.
Pulling cable tray
Working with high and low voltage
Installed, repaired, and maintained electrical systems in compliance with safety regulations.
Electrician
E. Tec, Industrial Services LCC
08.2021 - 12.2021
Connected wires to circuit breakers, transformers, and lights to establish reliable electrical systems
Pulled cable through designated pathways to ensure proper installation and connectivity.
Installed cable tray to organize and protect electrical wiring for safety and efficiency
Worked with high and low voltage
Electrician
TIC
05.2021 - 07.2021
Planned layout and installation of electrical wiring, equipment, and fixtures to ensure compliance with safety standards
Connected wires to circuit breakers, transformers, and lights to facilitate efficient power distribution
Pulling cable
Installed cable tray to support and organize wiring systems.
Worked with high and low voltage
ELECTRICIAN
GREAT ARROW BUILDERS LCC
03.2021 - 04.2021
Planned layout and installed electrical wiring, equipment, and fixtures to ensure safe and efficient functionality
Installed grounding systems to ensure electrical safety.
Connected wires to circuit breakers and transformers, facilitating reliable power distribution
Managed high and low voltage systems to maintain operational efficiency.
Operated in motor control centers to manage electrical distribution.
Electrician
W Industrial
09.2020 - 01.2021
Executed cable pulling to facilitate electrical connections
Connected electrical systems including panels, transformers, lights, fans, and motors to ensure operational functionality
Equipment termination
Installed cable tray
Worked with high and low voltage
Performed installation and maintenance of motor control centers (MCCs) to support efficient electrical distribution
Electrician
Ace
08.2020 - 09.2020
Installed cables for electrical systems
Installed and terminated lighting fixtures
Installed electrical systems in residential and commercial properties, ensuring compliance with safety standards.
Diagnosed electrical issues using testing equipment, providing timely solutions to minimize downtime.
Assisted in the implementation of energy-efficient lighting systems, contributing to sustainability initiatives.
Electrician
Mel Electrician
04.2020 - 07.2020
Installed cabling systems
Equipment termination to ensure reliable electrical distribution
Worked with high and low voltage
Completed equipment terminations
Handled high and low voltage systems to maintain safety and compliance
Served in MCCs to facilitate effective motor control operations
Electrician
Arden, North Dakota
04.2019 - 01.2020
Pulled electrical cables to connect systems.
Equipment termination
Installed cable tray
Terminated equipment connections to ensure functionality.
Worked with high and low voltage
Worked MCC´s
Electrician
Meitec
08.2018 - 04.2019
Pulled electrical cable through designated pathways to connect equipment.
Connected panels, transformers, lights, fans, and motors to ensure proper electrical functionality
Installed cable trays to support organized and safe cable management
Pulling cable
Worked with high and low voltage
Electrician
W Industrial, Offshore
05.2014 - 12.2018
Executed cable pulling to support system setup.
Connected panels, transformers, lights, fans, and motors to ensure proper electrical function
Installed cable tray to organize and support electrical wiring systems
Pulling cable
Ground equipment surfaces for maintenance.
Worked with high and low voltage
Worked in MCC's
Electrician
W Industrial
05.2018 - 06.2018
Pulled electrical cable through conduits for installation projects.
Connected panels, transformers, lights, fans, and motors, ensuring proper functionality and safety
Installed cable tray
Pulling cable
Ground equipment surfaces to ensure proper fit and function.
Worked with high and low voltage systems to ensure safe operation.
Worked in MCC's
Electrician
Caliber Solutions
02.2018 - 05.2018
Pulled cable through designated pathways to ensure proper installation.
Connected panels, transformers, lights, fans, and motors to ensure proper functionality and safety
Installed cable tray to organize and support electrical wiring systems
Pulling cable
Ground equipment surfaces to prepare for maintenance or repairs.
Worked with high and low voltage
Worked in MCC's
Electrician
MMR Construction
07.2017 - 09.2017
Installed and pulled cable through designated pathways
Connected panels, transformers, lights, fans, and motors for operational readiness
Installed cable tray
Worked with high and low voltage
Operated grinding equipment to prepare surfaces for finishing
Worked with high and low voltage
Worked in MCC's
Electrician
Meitec
09.2015 - 03.2016
Installed cables in designated areas
Connected panels, transformers, lights, fans, and motors to ensure operational functionality and safety
Installed cable tray to support organized and efficient cable management
Pulling cable
Operated grinding machinery for maintenance
Worked with high and low voltage
Worked MCC´s
Electrician
Caliber Solutions
01.2015 - 03.2015
Facilitated electrical connections by pulling cables
Connected panels, transformers, lights, fans, and motors to ensure reliable electrical functionality
Installed cable tray
Worked in MCC´s
Operated grinding machinery for equipment maintenance
Worked with high and low voltage
Worked MCC´s
Electrician
Ameriforce
10.2010 - 06.2012
Facilitated installation process by pulling necessary cables.
Connected panels, transformers lights, fans and motors
Installed cable tray to organize and support electrical wiring systems
Worked with high and low voltage
Performed grinding on equipment to ensure smooth operation.
Worked with high and low voltage
Finalized compartment by ensuring all components were properly installed.
Instrumentation Assistant
MMR Construction, INC
08.2009 - 02.2010
Installed network cables
Established connections at terminals
Connected pipes and panels, installed grills and bent baskets for system integration
Assisted as a tubing helper
Electrician
MMR Offshore Services, Inc
11.2008 - 02.2009
Installed cables in designated areas
Joined terminals to ensure proper connectivity
Installed cable tray to organize and support wiring infrastructure
Pulling cable
Operated grinding equipment for maintenance
Worked with high and low voltage
Worked in MMC's
Electrician
Ameriforce
02.2007 - 08.2007
Facilitated cable installation for electrical systems
Connected electrical terminals for circuit functionality
Connected panels, transformers, lights, fans, and motors to ensure proper functionality and compliance with electrical standards
Handled high and low voltage tasks for projects
Electrician
Amtex
01.2005 - 02.2007
Pulled cables to connect electrical systems
Equipment Termination to establish reliable electrical connections to establish network communication
Pulling cable to support organized and efficient cable management
Installed cable tray
Ground equipment to ensure proper functionality
Worked with high and low voltage
Proven ability to learn quickly and adapt to new situations.
Skilled at working independently and collaboratively in a team environment.
Paid attention to detail while completing assignments.
Used critical thinking to break down problems, evaluate solutions, and make decisions.
Skills
Electrical testing, installation, repairs, and troubleshooting