Systematic and Hands-on Project Manager and Quality Control Manager with more than 15 years of experience in Federal construction working in cross-functional environments. Experience in budgeting, forecasting, and risk management. Observant and resourceful professional dedicated to delivering project objectives within the quality, period of performance, and budget constraints. An outstanding collaborator comfortable working with others in executing projects to achieve project goals. Developing continuous improvements throughout the planning and implementation phases of projects. Well-versed in mentoring and guiding associates to exceed client and stakeholder expectations. Communicative and reliable professional polished in maintaining comprehensive project documentation. Demonstrated history of successfully juggling multiple projects simultaneously. Demonstrate management knowledge, leadership, and interpersonal skills. Sustaining customer relationships to enhance the company's ability to procure projects.
Overview
19
19
years of professional experience
Work History
Senior Project Manager & Corporate QC Manager
Betance Enterprises, INC. Veterans Affairs, VA
Denver, CO
05.2019 - Current
Managed to complete sixteen projects, and three projects are still ongoing at the Rocky Mountain Regional VA Medical Center (RMR).
Oversee and improve the Quality Control Program.
Support projects in three states
Planning, creating benchmarks, ensuring the quality work is done on time and within the projected budget, and in incompliance with design
Review project risks and devise proactive strategies to avoid potential roadblocks.
Perform submittal review and approval.
Ensured tests performed
Manage, coordinate, and document the three phases of quality control performed by the QC Specialists, testing labs, and any other inspections.
Generate and track change orders and other contractual modifications affecting budget and schedule.
Organizing preparatory meetings prior to construction and follow-up inspections during construction to ensure that the work performed is in compliance with the contract documents and meets quality standards
Reviewed budget and subcontractor estimates in detail and analyzed for accuracy with the scope of work relevancy in mind
Managing staff and distributing resources,
Keep track of spending and forecast changes to the budget.
Inform the team about forecasts, keep tabs on the budget, and prepare for unplanned costs.
Communication with stakeholders
Keep projects on schedule during the COVID-19 pandemic in an active hospital. Additional and detailed planning with lengthy advance notices were required to maintain the progress and overcome the challenging times.
All the completed projects were on schedule, within budget, and of excellent quality.
The client is the Department of Veterans Affairs (VA)
Managing Design-Build (DB) remodel at downtown Denver's César E Chávez Memorial Building and Schriever Space Force Base
Coordinate with the designers and subcontractors
Managed submittals and processing of Requests for Information between general contractor, owner and owner's consultants.
Proposed, reviewed and approved modifications to project plans.
Submitted project deliverables to clients, consistently adhering to quality standards.
Created project plans with established timelines, assigned to appropriate teams and managed workflow throughout construction
Review, correct clashes, and coordinate with the subs involved during design development to ensure no deviation from the SOW
Developed a realistic master schedule, tracked milestones, managed resources, and coordinated the different trades' work to stay on schedule
Managing budgets and controlling risks
The client is General Services Administration (GSA) and
The client is Schriever Air Force Base.
Delivered high level of service to clients to extend relationship and encourage further projects.
Conferred with project personnel to identify and resolve problems.
Corporate QC Manager / Project Manager
Betance Enterprises, INC. IDIQ
Fort Carson, CO
11.2016 - 05.2019
IDIQ SATOC Projects spread over 190 locations in Fort Carson base, Colorado
Projects included heavy civil work, building renovations, landscaping, electrical, mechanical, FA, HVAC, security, ICIDs, telecommunications, and different roofing systems
Supported projects in five states
Responsible for the quality control program for all task orders
Forecasted, scheduled, and monitored project timelines, personnel performance, and cost efficiency
Maintained and updated QCS & RMS 3.0 (quality control system) database software and collect project information such as daily reports, quality & safety deficiencies, testing, pay activities, and Government correspondences
Created and updated construction schedules using MS Project and Primavera P6
Reviewed projects design and prepare As-Built drawings
Reviewed/Approved subcontractor's invoices
The client was the United States Army Corps of Engineers (USACE) - Omaha District.
QC Manager
OCONUS, AL Saraf Group LLC
Baghdad, Iraq
03.2012 - 01.2015
The project included ground-up seven multi-story steel structures, domestic water, electrical, sanitary, communication networks, roads, parking areas, curbs, and landscaping
Maintained and updated QCS, performed the quality control system according to the QC plan, utilized submittal register log and a three-phase inspection process for each definable feature of work (DFW)
Prepared daily reports, checklists, meetings, RFI's, and monthly invoices
Performed detailed cost estimates and peer data reviews for both design-build (DB) and Design-Bid-Build (DBB)
Managed team of technicians and inspectors to ensure adherence to the design
Supported estimators and Project Managers
Conducted meetings with the Government
Review project specifications according to ASTM, CSI format 2004, ACI, and IBC standards
The client was the United States Army Corps of Engineers (USACE) - Gulf Division.
Design Team Leader / Drafter
AL Saraf Group LLC
Baghdad, Iraq
06.2011 - 04.2012
Various Projects / Al Anbar, Iraq ($42 million projects)
Delegated daily tasks to team members to optimize group productivity
The project contained more than 28 buildings (renovation & new construction), including utility networks, guard towers, elevated water tanks, electrical generators, water well, and roads
Drafted a complete set of structural drawings
Coordinated between designers and drafters and supervising the drafters' team
Conducted reviews of different sets for drawings, during and after to prevent project delays and resolve design clashes
Ensured meeting submittals deadlines
The client was the United States Army Corps of Engineers (USACE) - Gulf Division.
Quality Control Manager
OCONUS
10.2010 - 08.2011
Quality Control Manager/HSE Officer/CAD Drafter
AL Saraf Group LLC
01.2008 - 09.2010
Al Anbar, Iraq
3A Border Road Project/ Al Anbar, Iraq ($16 million project)
19 miles (30 kilometers) of new construction border asphalt road
This project Included earthworks, soil improvements, asphalt paving (stabilizer layer & binder layer), and concrete works (pipe, box & Irish culverts)
Maintained and updated QCS, utilized submittal register log, and a three-phase inspection process for each definable feature of work (DFW)
Prepared daily reports, checklists, meetings, RFI's, RFP's and monthly invoices
Updating construction schedule
Conducted construction observation, field quality assurance testing, site grading, and construction
Meetings and maintain excellent working relationships with the end-users and Government personnel
Controlled Budget, H&S, QA/QC, Change orders, and leading Value Engineering
The client was the United States Army Corps of Engineers (USACE) - Gulf Division.
Updated and documented inspection results by accurately completing reports.
Site Engineer
OCONUS, Innovative Technical Solutions Inc
, Iraq
09.2006 - 12.2007
Renovate local police stations in Iraq ($4 million project)
The projects included renovating three police stations, including upgrading utility networks, guard towers, installing generators, shaded parking, and sidewalks
Coordinated with other engineers and construction professionals to manage various stages of construction projects
Conducted construction observation, field quality assurance testing
Managed resources
Supervised all aspects of Health & safety and quality control
Responsible for daily reports, tracking submittal register log
Implemented a comprehensive 3-phase inspection process leading to significantly less re-work
The client was Air Force Center for Engineering and the Environment (AFCEE).
Site Engineer / CAD Drafter
Kadak Construction CO
Baghdad, Iraq
05.2006 - 08.2006
Bridge Project / Baghdad, ($28 million project)
The project included earthworks, resolving groundwater issues, soil improvements, steel, and formworks
Preparing steel shop drawings
Supervise steelworks and formworks.
Team Leader / CAD Drafter
Kadak Construction Co
Baghdad, Iraq
09.2005 - 05.2006
Wastewater Treatment Plant Project / Iraq, $32 million project)
The project included a wastewater treatment plant, six substations, earthworks, power distribution and telecommunication, mechanical, road, and parking areas
Undertook major responsibilities, including drafting a full set of drawing for the primary wastewater plant drawings, earthworks, and two substations
Work with the designers to address client's comments on the design
By the end of the project, I was supervising AutoCAD drafters' team
The client was the United States Army Corps of Engineers (USACE) - Gulf Division.
Director
ECC International, LLC
Baghdad, Iraq
General for Intelligence & Security (DGIS) / Baghdad, Iraq ($45 million project)
The project included six ground-up k-span buildings multi-story, water network, sewer network, sanitary networks, asphalt paving, and landscaping
Reviewed construction activities for compliance with health and safety requirements
Compliance with activities hazard analysis (AHA's) and safety rules
Reflecting the USACE's comments on architectural and HVAC drawings
QC and field corrections to design
Tracking submittal deadlines
Analyzed issues and recommended corrective actions to improve results
Supervised site activities, including structural and architectural works
Assigned tasks to laborers
Conducted site inspection
Prepared As-built drawings
The client was the United States Army Corps of Engineers (USACE) - Gulf Division.
Education
M.D - Construction Engineering Management
University of Colorado Denver
12.2022
B.Sc. - Building & Construction Engineering
University of Technology
01.2005
USACE/NAVAC CQM Certificate -
Skills
OSHA 30 Hours / First Aid CPR
Construction Management
Cost Estimating
AutoCAD
Skills
Strong work ethics
Quality Assurance and Control
USACE's QCS & RMS
Primavera P6
RS Means
Revit
Maintain open channels of communication
Project Management
Cost Management
Time Management
Risk Management
Stakeholder Management
Cost Analysis, Reduction and Containment
Workflow Planning and Prioritization
Budget Control
Verbal and Written Communication
International Business
Advanced PC skills
Ability to define problems
Ability to think practically
Documentation and Reporting
Interests
Security Clearance& Badges
, Active Public Trust Security Clearance
Active VA Badge
Active GSA Badge
Assistant Medical Center Director (COO) at Department of Veterans Affairs, Veterans Health Administration, VA Medical CenterAssistant Medical Center Director (COO) at Department of Veterans Affairs, Veterans Health Administration, VA Medical Center
Contract Specialist at Department of Veterans Affairs (VA) Veterans Health AdministrationContract Specialist at Department of Veterans Affairs (VA) Veterans Health Administration
Certified Pharmacy Technician CPhT at US Department of Veterans Affairs - VA CMOPCertified Pharmacy Technician CPhT at US Department of Veterans Affairs - VA CMOP
Director of Operations - Contract at La Bella Fleur Healthcare and Birthing Center, Inc.Director of Operations - Contract at La Bella Fleur Healthcare and Birthing Center, Inc.