Control Operator ( Oil & Gas Short Term Contract)
Qatex ltd, Qatar Energy and chevron JV
09.2022 - 01.2023
Operations and maintenance
Controls & execute daily operations activities, plan & initiate daily maintenance and inspection activities
Supervised of Engineering work station, operator work station, leak detection pc, and Tank radar monitoring system pc for tank level during pipeline transfer to customer and tank to tank Blending operation to convert JETA-1 to JP-8
Monitor activities & review / update logbooks& records
Carry out the activities related to loading and Discharge of marine vessels, Oversee Additive receipts (FSII Isotainer and/or drums), Additive injection, Quality Control Activities, oversee the loading of contractor’s road tankers, Pipeline transfer to the customer, Terminal housekeeping and observing fire & safety precautions
Responsible for planning and controlling the operational activities related to trucking & pipeline Transfer activities
Supervise & train Operators/helpers on all operational aspects of the jobs
Co-ordinate and carry out Quality Control related to terminal maintenance activities
In liaison with Operations Supervisor, coordinate terminal/jetty operations with port authorities (vessel screening), vessel agents, firemen overseeing vessel discharge, and DLA-E personnel (QARs) in charge of vessel discharge
Ensure required tools and materials required during vessel and jetty sampling are available during handling of vessel.
Electrical Maintenance Engineer
Mobicor Trading, Doha galvanizing
11.2021 - 09.2022
Project: commissioning of Factory equipment and maintenance
The factory maintenance of Electromechanical equipment range from LV room to SMDB, MCC&DBs
General inspection of Electric motors, pneumatics and instrumentation controls, star delta , DOL,VFDs to identify and rectified problems
Request for missing items to installed in the right position
Study and review the SLD for proper control where open circuit was detected
Repaired of ovens and burner system for dryer and zinc bath system
General Maintenance of Overhead EOT cranes repaired of electric motor gear box
Serviced of hoist imbalance rope to maintain equal level
Water pumps maintenance for the facilities, air compressor, HVAC System repaired and thermostat when system failed
Stocks managements by creating stocks card placed different types of material in their racks
Documentation of all activities in Company database for future references
LA PLAGE SOUTH LPS03, RESIDENTIAL BUILDING PEARL QATAR 2B+G+8F
Execution of Electrical installation small power, lighting ELV system
Site coordination with other MEP services, class detection and clouding of the areas
Propose services rerouting for approval
Conduits pipes installation, back boxes, FTB Boxes, cable pulling,DB dressing, and lighting features installation
Power outlet cable continuity test for ring circuits and radials
Fire alarm cabling and data cable installation to each zones and panels
Data cable point to MD, IDF, and test before final connection
Fire Alarm cabling zone and loop connection testing and program
Fire alarms panel and repeaters loop connection to various building locations
Submitted completed area of works for inspection to QAQC dept.
Electrical Engineer
ICM Design, ICM Design & Engineering
02.2019 - 10.2021
International concept Management)
Project: visitor centre project at new Hamad port mesaeed
Location: Doha Qatar
Operation and maintenance:
Plants supervision of MEP system in water filtration plant
Advice Technician on how to carry out works on pressurized water line,air line, ozone lines and Electrical circuit when its deems to do so
Troubleshooting electrical and instrumentation works
We carry out our daily activities in the plant starts from alarms monitoring from critical alarms and non critical
Check and monitor alarm visible in scada , monitor the set point for its ability to enter target on scada
Real time value visibility and historical values (Trends)
Physical field instrument monitoring
VFD’s controls Via modbus RTU communications
Attending to fault alarm receiving through GSM communication networks of PLC
Carry along the team on the plants status on affected section to control the field devices like manual control valves and pneumatic valves if necessary
construction /commissioning phase
Study of generic project documentation
Familiarized with P&ID drawing, IO point list for signal and instrumentation devices
Propose required materials for control of integrated panels from field devices to interfacing with mcc panel
Preparation of BOQ from Approved Electrical drawing for different services
Push for site clearance for material delivery and equipment installation
Materials inspection upon delivery
Daily, weekly and monthly report on project activities
Execution of Electrical installation for Aquarium system
Pumps installation for water tanks i.e back wash tank, holding /polishing tank, salt water mixing tank, fresh water tank foam/waste water tank , protein skimmers tanks ,Gas train Bio media tanks, jelly fish tank and quarantine water tanks
Installation of LV and ELV for Aquarium system
PLC S7-1500 panel installation and signal control wiring
Field instrument Installation digital and analogs i.e level sensors ,PH ,DO dissolve oxygen sensor, ultrasonic sensor ORP sensors , pressure sensor ,PG , pneumatics system and Actuators
Continuity Test ,insulation resistance test and Loop test of an instrumentation
Installation of LED drivers , Metal Halide for Aquariums lighting, power outlets as per design installation arrangements for Exhibition projectors, quarantines Tanks ,large and small aquarium Tanks lighting installations
Raise of Inspection after completion of a task for approval
Carry out reliability Test on electrical system before commissioning
Prepared Red line marking for AS build drawing and submitted for approvals
Provides daily and weekly report summary for the Managements with attached pictures of site progress etc
Supports the subcontractor to carry the activities as per client requirements
Coordinate with QAQC Engineer to raise an inspection on completed installations
Location : phase1, Red ,Gold and Green Lines stations
Job Descriptions:
To ensure site execution of Electrical installation in accordance with clients requirements
Preparation of site offices Facilities small power and lighting
Materials Preparation for BOQ from the approved shop drawing
Materials selection in accordance to the approved material submittal from supplier’s catalogue
Review shop drawing to identify details and highlights errors from design by clouding the noticed points with clear information
Compare SLD,TTD and wiring diagram to ensure construction team works are perfect Client’s requirements
Propose of alternative cable routing in coordination with civil team in a situation where containments clashing with other services and submitted for final approvals
Managements of Manpower for specific Task
Supporting of the site team to accomplished all the Task during Electrical Installation
Equipment delivery with safe handling, Visual, inspections storage and Raised an IRE for constructions installations
Making a red line after completion of Electrical installation and submitted to QAQC dept
To prepare IRE ,Also for ASBUILT drawing
Accompany Client representative to the site when its necessary for site Inspection
Participating during Equipment Test & pre commissioning of Electrical equipment
Clearing of snags work and NCR whenever received from QA- QC departments and makes corrective procedure for close out
Prepared variation work and submitted to Management for claims
Activities summaries:
Electrical containments Installation as per Approved shop drawing e.g Cable tray ,Trunking
and GI Conduits for Tunnel ventilation system TVS
Mobilized for Electrical Equipment delivery to site final location e.g Distribution panel.VSD
cabinets, control cabinets, AHU Common boxes ,VC boxes, ZMADQ Card box and MSFDs
Jet fans, Axial TVF fans, AHU and MSFDs dampers of various sizes installation
Cable pulling supervision, dressings megger test, continuity test ,termination and cable feruling
Accompany client site coordinator and client representative to various location of our scope of
Work for inspections
Site coordination and resolved issues involved with other contractor on site for MEP clashing
Propose a new routing or wall opening when its required and submitted for client approvals
Prepared red line for final installation of containments and equipment installation
To submit IRE for approvals for As build drawing.
Electrical engineer
Fujita corporation Qatar
02.2014 - 12.2016
Grace serve engineering Qatar WLL
project: Metro Deport project RSTD
Responsibilities:
working as an Electrical Engineer to coordinate with our client representative monitor the
progress of work and guidance to ensure compliances and completion of task as per design
Prepared daily report of site activities and weekly progress report to the managements
Work Description
Adherence of HSE Safety Rules and Regulations by safety Inductions, approved work permit, Tool box Talk and work start briefing, certified scaffolds and ladders
Follow up the Issuance of site instruction to ensure the Scope of work completed without deviation
Carried out supervision, Inspection Testing of LV activities Installation, Totalizer panel, MDB, UPS, Field instrumentations, control and signal cable , LCP, structural cabling, Lighting fixtures and small power ,cable containments , Cable managements and feruling
Ensure that the process of work is in accordance with the method statements and Inspection Test plan
Control cabinets installation and MCC panels
Using of appropriate Tools for a specific task
Approved Shop drawing in accordance with Material submittals
Provide support and advice to the construction personnel in relation to the QMS
Execute design drawings at site, supervise and Monitor installations i.e
Piping installations
Cable Tray, Trucking and piping installation
Earthing and Bonding system, Lightning protection and Earthing of electrical services
Review / Preparation of power load schedule and selection of cables, Circuit breaker and fuses for system protections
Conduct material take-off as per design & prepares estimation reports Coordinates actual site progress
Supervise the personnel on tight schedule and Ensure satisfactory job delivery.
Electrical supervisor
Rabya qatar
qatar
07.2013 - 02.2014
Study of approved shop drawing
Carryout site survey and manpower plans for site Execution
Design review models for clash detection and alternate routings and arrangements client approval for rerouting
Working in line with International Codes and Local Standards BS,IEC, QCS , Kahramma Regulation
Do the technical correspondence to clients and also to the Supplier’s equipment manufacturer
Revise the submittal for a specific materials as per condition or equipment manufacturer design change and comments, Transformer, MV Panel, SMDB, MCC ,DB, Switches , Socket and lighting fixtures
Prepared and check drawings and materials take-off (Bill of Materials or Quantities) using standard or clients specification requirements
Preparation of materials list and support accessories material i.e UPVC, Cable Tray, Trunking, Piping , lighting fixtures and accessories
Electrical Maintenance supervisor
Nampak Nigerial PLC
lagos
01.2011 - 05.2013
Manufacturing of beverages packaging product and equipment refurbish also construction of new factory
Carry out Electrical construction on a production equipment like conveyor line and oven for Tin plate after printing
Installation of 11kv transformer and 11kv rmu and commissioning
Automation and instrumentation activities supervised
Support team of Electrical Technician to ensure task completed in timely manner
Overhaul of machineries during shut down period and brought them back to life
Preventive maintenance plan and daily routing inspection on each equipment to suggest possible system improvement in compliance with OEM specifications to mentioned few.
Electrical Maintenance supervisor
Slabmark - Sudit oil and Chemical
01.2006 - 01.2010
Supervised the team electrical maintenance personnel
Establish and maintain a good relationship among team and employer representative
Preparation of routine maintenance activities for the facilities equipment
Preparation of personnel timesheet and equipment timesheet
Preparation of maintenance daily reports activities and filled
Materials and spare quality control inspection before receipt from suppliers
Execute preventive, corrective and routine maintenance of the facilities equipment
Review quotation from contractor before final approval
Professional job handling technically in Electrical, Instrument including Mechanical activities with maintenance team
Plant maintenance of solvent extraction plant where all electric motor and lighting fixtures were flame proof
Power cable installation of XLPESWA Cable and termination
Different types of Boiler and maintenance e.g fluidized boiler, oil-atomizer boiler plant and diesel boiler plant
Edible oil plant refinery equipment installation of instrumentation, double and single acting valve actuator, diaphragm valve and positioner, air compressor and Vacuums pump system, agitator motors, oil presser
PLC panels installation with Scada system and HMI for new fractional plant
Pilot plant maintenance to support main refinery plants
Installation of Fractional plant for oil separation and filtration’s with state art equipment and instrumentation and controls
From start to commissioning
4
Education
Higher National Diploma - Electrical Engineering, Electrical Electronic &Telecommunication
The polytechnic
National Diploma - Electrical Electronics, Electrical Electronics
The polytechnic Ibadan
Electrical Installation and practice
National Board For Technical Education (NABTEB )
Government Technical College
Affiliations
Autocad 2Dand 3D
Certified IMS Internal Auditor (ISO 9001,2015 Lead Auditor)
Project management planning primavera p6.certificate
Nebosh IGC
IOSH Health & Safety
OSHA academy
H2S/BA
Basic Firefighting
First Aide and CPR
Electrical Automation System Engineer:
in Electrical panel Design,
Software/hardware programming, field instrumentation and control,
SCADA, HMI, PLCs, & VFD
Additional Information
Manage resources ,created project schedule and maintain department budgets
Prepare the required document and provide permits to work.
Ensure the team is executing the assigned job correctly, completely, and on time.
Ensure the team has the correct knowledge of the assets/installation by providing them with the necessary training and guidance on maintenance tasks.
Deal with the subcontractors, schedule their visit and supervise the work assigned to them.
Make reports on defects, issues, breakdowns, and damages.
Ensure spare parts levels, requirements, and availability.
Accomplish special team projects assigned by their Line Manager.
Assist in completing documents to be used for internal or external audits.
Comply with the company standards specifically related to personal hygiene, dress code, and behavior.
Comply with all HSE procedures, rules, and regulations from the client and from HSEQ Management System.
Report workplace accidents, incidents, near misses, or ill health events
Category Manager, Professional Services at Tengizchevroil LLP (Chevron JV in Kazakhstan)Category Manager, Professional Services at Tengizchevroil LLP (Chevron JV in Kazakhstan)
Associate - Budgeting & Group Finance Management Reporting at Qatar Energy - QP (Seconded by Price Water House Cooper - PWC Qatar (BIG 4 Audit Firm)Associate - Budgeting & Group Finance Management Reporting at Qatar Energy - QP (Seconded by Price Water House Cooper - PWC Qatar (BIG 4 Audit Firm)