Mechanical maintenance technician with a background in electrical and mechanical troubleshooting, preventive maintenance, and plant equipment repair. Maintains conveyors, motors, pumps, gearboxes, and control systems while documenting work orders, managing spare parts, and following safety procedures to support reliable production uptime.
Assisted packaging equipment maintenance at quality packaging facility.
Inspected conveyors, motors, and production lines for signs of wear.
Fixed mechanical issues on presses, pumps, and seals.
Followed safety rules during lockout and repair work.
Supported plant upkeep with plumbing, electrical, and facility fixes.
Tracked preventive maintenance tasks and service records.
Operated hand and power tools to complete repairs.
Responded quickly to emergency breakdowns during shift hours.
Electrical Engineer
3 Years 10 Months
Musan Trading and Projects Company (MTE) | PRETORIA, SOUTH AFRICA | 01.2013 - 11.2016
(MTE) MUSAN TRADING AND PROJECTS COMPANY .
STATUS : ELECTRICAL ENGINEER . (South Africa).
20013-2016.
Designed electrical systems for MTE project sites and trading installations.
Inspected equipment for compliance with safety and electrical standards.
PROJECT UNDERTAKING:
General maintenance and installation of industrial wring and domestic wring.
Involved in installation of (150MVA) Auto transformer, with (PHCN) company.
Involved in installation of circuit breakers, current and voltage transformer (CT) & (VT).
Design and construction of 0-30v DC power supply and digital timer unit point.
Involved in installation of (PLC) Programmable logic control, (MCC) Panels , Control panel.
Involved in installation, Supervision, and Maintenance of Capacitor bank panel, Stator panel, Cooling tower control center, and overhead Crane control panels (25tone, 3tone,4tone 10tone).
Design and construction of Automatic and Manual changing over of two supply, and 1000wat inverter.
INSTALLATION OF HEARTER BANKS AND MAITENACE
Installation and design of sewage control panel in Witbank Mpumalanga (South Africa) .
Maintenance of Generator in union budding (South Africa) .
Installation of (Centurion gate motor ) in South Africa presidential house union budding . (South Africa )
Maintenance and Install of Boiler Room in coronation service Witbank (South Africa) .
Maintenance of Tint tin pan , ovens Rational , oil hot pot, dishwasher machine, and all the kitchen equipment’s .
Installation of roller door and gates with remote control .
Installations of sub marring drain pump in South Africa water cooperation. (Hamaskra South Africa) .
Implementing the projects from the South Africa public works.
And more info in my profile photo.
Troubleshot faults in motors, lighting, and control circuits.
Supported technicians with installation methods, testing, and preventive maintenance.
Electrical Technician
3 Years
Aluminium Rolling Mill (A Deviation of Tower Aluminium PLC) Hot Rolling Mill Electrical Team | SANGO OTTA, OGUN STATE NIGERIA | 01.2010 - 01.2013
ALUMINIUM ROLLING MILL (A DEVITION OF TOWER ALUMINIUM PLC) HOT ROLLING MILL ELECTRICAL TEAM.
STATUS: ELECTRICAL TECHNICIAN . 2010-2013.
Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
Contributed innovative ideas and solutions to enhance team performance and outcomes.
Responsible for:
Engineering Supervision of Electrical design work by contractors on Stator panel projects. Refurbishing of capacitor bank, panel upgrading, modification of cooling tower control center, Installation of overhead Crain control panel (25 tone,3 tone,4 tone). Supervision of routine and periodic maintenance, cording of daily breakdown report , Identification, laying and termination of cables. Fault troubleshooting and analysis.
Inspected motors, panels, and cables on rolling mill equipment.
Repaired wiring, switches, and relay components during mill breakdowns.
Project Coordinator
1 Year
Ijoga Electrical Construction & Automation Engineering | Sango Otta, Ogun State | 01.2009 - 01.2010
IJOGA ELECTRICAL CONSTRUCTION & AUTOMATION ENGINEERING SANGO OTTA OGUN STATE NIGERIA.
PROJECT COORDINATOR. (NIGERIA) . 2009-2010.
Industrial Installation (Electrical).
Power and Control panel Installation.
Cable laying and construction of cable Roots ladder.
General Services.
Tracked material requests and procurement with site and office teams.
Monitored site activities and resolved coordination issues with supervisors.
Supported permit, safety, and compliance documentation for field work.
Electrical Technician
1 Year
Power Holding Company of Nigeria (PHCN) | Kumbotso | 01.2007 - 01.2008
TRANING AS (ELECTRICAL TECHNICIAN ) . 2007-2008.
Installation of a new (150MVA) Auto transformer step down
3300MVA to 132MVA to sub-regional station .
Maintenance and Installation of current transformer (CT).
Fault tracing and troubleshooting with line department, Control dept,
PC & M dept , Electrical dept.
Electrical Technician
1 Year
Electrical/Electronics Engineering Construction Company Ewekoro (Nigeria) (ABB) | Ewekoro | 01.2002 - 01.2003
(ABB) ELECTRICAL/ELECRONICS ENGINEERING CONSTRUCTION COMPANY EWEKORO ( NIGERIA). ELECTRICAL TECHNICIAN 2002-2003.
Inspected motors, panels, and cables on rolling mill equipment.
Diagnosed electrical faults in production machines and control circuits.
Repaired wiring, switches, and relay components during mill breakdowns.
Supported preventive maintenance on hot rolling mill electrical installations.
Installed new electrical wiring and equipment in accordance with local codes and regulations.
Repaired electrical equipment using hand and power tools and testing and diagnostic equipment.
Mechanical Maintenance Technician
3 Years 11 Months
COCA-COLA CONSOLIDATED | Indianapolis, Indiana | 12.2022 - Current
Performed preventive maintenance on mechanical systems and plant equipment.
Troubleshot production equipment, including SIDEL, KHS, and WESTROCK units.
Inspect and service electric motors.
Maintained on conveyors belts and pumps in syrup room.
Maintained accurate records of spare parts inventory levels for timely replenishment orders.
Completed weekly PM and planned PM tasks.
Created work orders and parts requirements.
Replaced belts, bearings, seals, and damaged machine components.
Documented work orders and maintenance actions in plant records.
Followed safety procedures during maintenance on Coca-Cola Consolidated equipment.
Supported technicians with troubleshooting techniques and repair methods.
Developed preventative maintenance plans for all equipment.
Troubleshot mechanical problems using schematic diagrams and technical manuals.
Ensured that safety protocols were followed at all times when performing maintenance tasks.
Performed regular mechanical maintenance on a variety of equipment and machinery, such as pumps, conveyors belts , and gearboxes.
Analyzed test results from diagnostic equipment to determine root cause of failure in machines.
Identified areas where improvements could be made in terms of efficiency or safety standards.
Maintained clear and safe workspace areas to meet OSHA standards.
Diagnosed problems with mechanical and electrical systems and equipment using advanced troubleshooting abilities.
Installed new systems, replacement parts, and components to maintain proper operation.
Read and interpreted equipment and work orders to properly perform required maintenance services.
Education
Associate of Science - U.S EQUIVALENCY,ASSOCIATE AND BACHELOR'S DEGREE
WES, CREDENTIAL EVALUATION AND AUTHENTICATION REPO | CREDENTIAL EVALUATION AND AUTHENTICATION REPORT | 03-2020
With State Hornours award Certificate From kano state governor.
(H.N.D) Higher National Diploma - Electrical and Electronics Engineering
The Polytechnic Ibadan | Oyo State, Nigeria | 01-2006
Completed
(SAIEE) South Africa Institute of Electrical Engineers
South Africa | 01-2004
Membership number (14134)
(N.D) National Diploma - Electrical and Electronics Engineering
The Polytechnic Ibadan | Oyo State, Nigeria | 01-2002
Completed
Senior School Certificate Examination (WAEC) And G.C.E Ordinary (SAIEE)
Idi-Emi High School | Abeokuta, Ogun State, Nigeria | 01-2000
Completed
Abeokuta Ogun State
Agodi Ibadan Oyo 2001
SAQA CERTIFICATE OF EVELUATION IN SOUTH AFRICA - Advance vocational/career oriented, Organizing field: Manufacturing, Engineering and Technology
South Africa
Programme requirements :Completion of coursework and examination , project. Also access to employment and further study.
RECOMMENDED RECOGNITION : based on structural comparison, excluding analysis of syllabi or assessment of learning outcomes.
Qualification(s) described above: Closest comparable South Africa qualification / qualification type
NQF level: Old New National Higher Diploma (A National Higher Diploma in the specific field is not registered on the NQF) 7 NLAP
Based on the outcome of such an assessment Comparability to a (BTech) degree may be considered. (South Africa).
Member of SAIEE with membership code 14134.
Skills
Detailed circuit diagram interpretation (Electrical and Mechanical)
Computer skills (Word
Excel
AutoCAD)
Monitoring
Resourceful
Enterprising
Reliable
Trustworthy
Project report writing
Traveling
Reading
Socializing
Sports
Preventive maintenance
Equipment troubleshooting
Conveyor systems
Motor diagnostics
Technical manuals
Pneumatic systems
Team collaboration
Effective communication
Time management
Mechanical troubleshooting
Schematic reading
Predictive maintenance
Machine repair
Bearing replacement
Troubleshooting strengths'
Training And Workshops
Awareness training on ISO
In-house training on PLC (Programmable Logic Control)
Introduction to AC Drive
Training on SCADA application
Seminal training workshop on installation of solar panel with inverter
NDE (National Directorate of Employment) federal secretariat - seminal workshop, Canada, Resume mentions Canada job expo seminal workshop at Johannesburg (South Africa).
SAIEE Engineers Seminar workshop, South Africa
Project
Industrial wiring and domestic wiring maintenance/installation, General maintenance and installation of industrial wiring and domestic wiring.
Installation of 150MVA auto transformer, Nigeria, Involved in installation of (150MVA) auto transformer with PHCN company.
Circuit breakers and transformer installation, Installation of circuit breakers, current and voltage transformer (CT & VT).
0-30V DC power supply and digital timer unit, Design and construction of 0-30v DC power supply and digital timer unit point.
PLC and MCC/control panel installation, Installation of PLC (Programmable Logic Control), MCC panels, control panel.
Capacitor bank, stator panel, cooling tower control center, overhead crane panels, Installation, supervision, and maintenance of capacitor bank panel, stator panel, cooling tower control center, and overhead crane control panels (25 tone, 3 tone, 4 tone, 10 tone).
Automatic/manual changeover and inverter installation, Design and construction of automatic and manual changing over of two supply, and 1000W inverter.
Sewage control panel installation and design, Witbank, Mpumalanga, South Africa, Installation and design of sewage control panel in Witbank Mpumalanga (South Africa).
Generator maintenance, South Africa, Maintenance of generator in union budding (South Africa).
Centurion gate motor installation, South Africa, Installation of Centurion gate motor in South Africa presidential house union budding.
Boiler room maintenance/installation, Witbank, South Africa, Maintenance and install of boiler room in coronation service Witbank (South Africa).
Kitchen equipment maintenance, South Africa, Maintenance of tint tin pan, ovens Rational, oil hot pot, dishwasher machine, and all kitchen equipment.
Roller door and gate installation, Installation of roller door and gates with remote control.
Sub-marring drain pump installation, South Africa, Installations of sub marring drain pump in South Africa water cooperation (Hamaskra South Africa).
South Africa public works projects implementation, South Africa, Implementing the projects from the South Africa public works.
Timeline
Mechanical Maintenance Technician
COCA-COLA CONSOLIDATED
12.2022 - CurrentRead More
Maintenance Technician
PROFESSINAL PARCKAGING SYSTEMS,INC
12.2017 - 03.2020Read More
Electrical Engineer
Musan Trading and Projects Company (MTE)
01.2013 - 11.2016Read More
Electrical Technician
Aluminium Rolling Mill (A Deviation of Tower Aluminium PLC) Hot Rolling Mill Electrical Team
01.2010 - 01.2013Read More
Project Coordinator
Ijoga Electrical Construction & Automation Engineering
01.2009 - 01.2010Read More
Electrical Technician
Power Holding Company of Nigeria (PHCN)
01.2007 - 01.2008Read More
Electrical Technician
Electrical/Electronics Engineering Construction Company Ewekoro (Nigeria) (ABB)
01.2002 - 01.2003Read More
WES, CREDENTIAL EVALUATION AND AUTHENTICATION REPO
Associate of Science from U.S EQUIVALENCY,ASSOCIATE AND BACHELOR'S DEGREE
Read More
The Polytechnic Ibadan
(H.N.D) Higher National Diploma from Electrical and Electronics Engineering
Read More
(SAIEE) South Africa Institute of Electrical Engineers
Read More
The Polytechnic Ibadan
(N.D) National Diploma from Electrical and Electronics Engineering
Read More
Idi-Emi High School
Senior School Certificate Examination (WAEC) And G.C.E Ordinary (SAIEE)
Read More
SAQA CERTIFICATE OF EVELUATION IN SOUTH AFRICA from Advance vocational/career oriented, Organizing field: Manufacturing, Engineering and Technology