Dynamic Systems Engineer with a proven track record at Elite Ops, improving production efficiency by 30% through the application of 5S standards. Expert in IT infrastructure and project management, delivering innovative solutions while ensuring client satisfaction and operational continuity. Skilled in troubleshooting and hardware integration, driving results in complex environments.
With solid experience in systems engineering, proficient in designing and implementing robust IT infrastructures. Proven track record in optimizing system performance and ensuring seamless integration across multiple platforms. Expert in troubleshooting complex issues and enhancing system security.
Based in Utah, with extensive experience as an independent consultant, I have worked on key projects optimizing and designing critical infrastructure across various sectors:
My consulting services have focused on ensuring the proper installation of cable modems, achieving 100% efficiency in connectivity. I am an expert in applying international standards, N+1 redundant architectures, and quality assurance for critical infrastructure. I am results-driven, implementing innovative technical solutions that ensure operational continuity in complex environments.
In my role at Elite Ops Manufacturing, I significantly contributed to improving production infrastructure and quality by applying Japanese 5S organizational standards. This implementation not only streamlined processes but also achieved:
I oversee solar installers, technicians, and subcontractors on residential and commercial solar installation projects, ensuring 100% compliance with safety and quality standards. I conduct precise technical assessments to estimate materials, equipment, and personnel needs, resulting in a 25% reduction in planning errors and a 20% optimization in resource usage.
I ensure strict adherence to project deadlines, achieving 95% on-time project delivery without compromising quality. I coordinate effectively with teams to resolve challenges and unexpected issues in real time, maintaining operational continuity.
I actively participate in project planning, progress tracking, and post-installation evaluations, which has led to a 30% improvement in workflow efficiency and a 40% increase in customer referrals and repeat business due to high satisfaction levels.
Led the internal plant implementation of a Tier III compliant Data Center and six national hubs in coordination with Motorola, achieving 100% installation effectiveness and on-time delivery. Ensured infrastructure deployment followed IEEE 802.3 (structured cabling and data transmission) and IEEE 1100 (electrical protection) standards. Coordinated UPS and generator installations at headend and hub sites, ensuring full operational readiness and high system availability.