Organizing all Field Operation requirements, being the first hired Field Operations personnel in the LA market
Integrating and reviewing the building of Cell sites
The creation of standards for sites and employees
Configuration of routers and all ancillary equipment
Cisco 540 routers configurations and integration
DU Emulation using a Mavenir Unix-based emulator.
Switch Tech
T-Mobile
10.2017 - 07.2022
Operation, configurations, and maintenance of Nokia Routers 7750 7789, CSR 7210, and IXR-e
I also had to ensure that the IP addresses and VLANs matched the Ericsson equipment to bring the entire site back into operation
All equipment was our responsible battery backup, stationary generator, and all backhaul, including FDP ‘s and all servers.
GTA Contractor
03.2017 - 10.2017
Integration and commissioning of Sprint 2.5 GHz LTE eNODeB
Responsible for drive testing all sectors and verifying all sectors are operating correctly
Responsible for making all repairs to eNODeB before releasing to the customer, troubleshooting using Alcatel-Lucent NEM software, and integrating Nokia/ALU 7705 router.
Amatel
01.2016 - 06.2017
Installing new equipment and troubleshooting all components of the cell site
Projects include, but not limited to, installing DUS41’s, 5216
Troubleshooting fiber, power, and antennas
The assembling of Verizon Celsius remote sites, PIM testing, and VSWR testing.
Contractor/Ericsson/Sprint
10.2014 - 04.2016
RF Field Engineer Los Angeles Metro
Primary responsibilities include maintenance and repair of all equipment on the network, including microwave backhaul and fiber networks
Troubleshooting Lucent Enodeb LTE 800 MHz 1900MHz and NV 2.5GHz
Special Project: Lead on the acceptance of Sprint Vision (LTE) upgrades
I have managed a Tiger team to make all corrections on-site that were completed incorrectly on the initial build.
Motive Energy
03.2014 - 05.2014
DAS RF Design Engineer
Primary responsibilities include: Led in building walk testing of indoor Macro RF power penetrating the building
Preparation work for baseline power calculations and design on Ibwave.
Senior RF Field Technician III
METRO PCS/T-Mobile
01.2006 - 01.2014
Maintenance and integration of Ericson LTE EnodeB, Lucent 4.0B, and Legacy Nortel/Ericsson EVDO; conversion of routers from T1 interfaces to Optical Ethernet; installation and turn-up of Lucent and Ericsson EVDO; Trained in using Ericsson GUI and Ericsson MO Shell (Amos) for maintenance of Ericson.
Senior Switch Technician III
SPRINT PCS
01.1997 - 01.2006
Operation and maintenance of Lucent 5ESS ECP Executive Cellular Processors, Application Processors, Flexant Mobility Servers