Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Job Title position. Ready to help team achieve company goals.
I have 10 years of experience in the refractory industry. I’ve put my hands on many different tasks from welding brick laying gunning casting finishing etc. when I’m on a job I’m serious and determined to do my job the best of my ability. Whether it’s demo installing cleaning QC, QA/QC I will try my best and set high standards for satisfactory amongst everyone.
During the 2023 FCC turnaround located at Valero Corpus Christi my job duties were:
- Locating and indicating areas in the Reactor & Regenerator that needed immediate attention for repairs during the shutdown.
- Following the work from demolition to installation making sure all steps, procedures per Valero were followed.
- Final inspection of work concluding the integrity of the material will do its job during process.
During the 2023 FCC outage located at EXXON Billings Montana my job duties were: - Locating and indicating areas in the Regenerator that needed immediate attention for repairs during the shutdown. Along with the new door sheet that needed to be removed and installed after the demo of the refractory installed liner. - Following the work from demolition to installation making sure all steps, procedures per Valero were followed. Including qualifications mixing procedures welding procedures gunning installation per EXXON MOBIL specifications - Final inspection of work concluding the integrity of the material will do its job during process.
-Following the dry out procedure for the temperature climbs and hold points to cool down.
During the 2023 FCCU turnaround my duties as an inspector were:
-Locating and indicating areas of immediate repairs during shit down of unit.
-Following work from demolition to installation processes in the Reactor, Regenerator, Scrubbers 3rd stage separator (Tertiary). Checking on square up shell prep, layout, welding procedures, installation of refractory liner.
-Being at the location of mixing and installment of liner observing good installation techniques mixing techniques.
-Qualifications for hand packers, nozzleman breaking qualification sample checking for voids, rebound entrapment lamination and other indications of improper installment, welders etc.
-Final inspection hammer test after 24 hour curing time to make sure the liner was installed properly.
My job duties on this new construction project of 2023 was to install IFB and install kaowool then installation modules.