Summary
Overview
Work History
Education
Skills
Companies I've done projects for.
Timeline
Generic

Alberto Salinas Jr

McAllen,TX

Summary

Highly trained Pipefitter offering excellent skills in managing teams and running and cutting copper. Pursuing a similar position where a well-qualified individual with an understanding of assembling and installing pipe systems is highly sought. Accomplished Pipefitter with over 10 years running oil and gas lines. Bilingual Pipefitter with supervisory experience and background in Facility and Pipeline maintenance. Eager to apply pipefitting and repair skills to augment employer's services and market share. Dedicated Pipefitter with background in job coordination and worksite setup. Knowledgeable in safety processes, regulations and pipe selection. Offering successful career history comprising more than 10 years. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Experienced Pipefitter Foreman bringing proven expertise in understanding technical documentation and work orders to effectively plan jobs. Proactive in identifying and working around obstacles. Excellent trainer and team leader.

Overview

9
9
years of professional experience

Work History

Pipe General Foreman

Sundt Construction
Taylor, TX
09.2023 - Current

Supervise a team of 3 Pipe foreman and 24 pipefitters, ensuring the timely and efficient completion of complex tasks on large-scale industrial projects.

Successfully led the team through several challenging situations, including unexpected project delays, complex system installations, and resource shortages, maintaining high-quality standards under pressure. Which led us to be crew of the month for 5 times. Some key task that we did to lead us to being crew of the month were.

  • Coordinated with other departments and disciplines to ensure smooth operations Especially when several departments need the same crane.
  • Reviewed blueprints, drawings, plans prior to starting a project in order to ensure accuracy.
  • Managed and assigned tasks to pipe crews.

Managed the installation and troubleshooting of complex piping systems while resolving issues that arose during construction, such as unanticipated site conditions, design discrepancies, and supply chain delays.

Worked closely with engineers to find creative solutions to challenging piping configurations, ensuring both functionality and safety.

Conducted regular safety meetings and provided on-the-spot solutions to prevent accidents, especially in high-risk environments.

Demonstrated the ability to adapt quickly and find solutions when unforeseen obstacles arose, minimizing project downtime.

Trained team members to develop a strong problem-solving mindset, ensuring the team remains focused and effective during challenging tasks.

Superintendent

Tindol Construction
Beeville, TX
08.2023 - Current
  • Measured and marked pipes for cutting and threading.
  • Inspected worksites to survey for potential hazards or safety concerns.
  • Studied project specifications to plan sequence and schedule for pipe installations.
  • Examined pipelines using pressure gauges and hydrostatic testing.
  • Prepared and planned worksites to help jobs run smoothly.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Read and interpreted drawings and assessed construction against plans.
  • Inspected sites before and after construction projects.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Completed investigations into complaints, incidents and accidents at work sites.

Pipefitter Foreman

Fluor Corporation
Houston, TX
02.2023 - 05.2023
  • Maintained strong quality control standards to prevent costly rework.
  • Enforced safety and client-specific policies procedures on job sites to protect workers and general public.
  • Completed site reports, materials requisitions, RFIs and log books.
  • Observed safe work rules and utilized fall protection and PPE.
  • Measured and marked pipes for cutting and threading.
  • Managed movement of materials and equipment to different job sites.
  • Used welding and soldering equipment to join sheet metal components following blueprints and job specifications.
  • Identifying signs of potential problems with boilers and pressure vessels, such as tube leakage, scaling, pitting, metals discoloration and refractory failures.

Pipefitter Foreman

Yates Construction
08.2022 - 01.2023
  • Followed safe work practices, which included fall protection, personal protective equipment,
  • Performed tests to check quality of pipe and piping systems and made sure we sold those systems on time.
  • Threaded pipe from size 1/2" to 4" pipe using pipe threading Machine.
  • Fabricated and installed screw pipe, socket weld pipe, Butt weld pipe from 1 1/2" to 40". stainless steel Pipe, Carbon Steel Pipe, PTFE Lined Pipe from 1 1/2" to 12" pipe.
  • Coordinated movement of materials and equipment to different work areas with Forklift, Crane Operators.
  • Utilized welding equipment, Argon Bottles tools to safely complete predetermined operations .
  • Identified equipment and production non-compliance issues and notified GeneralForeman to facilitate resolution.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
  • Oversaw team of service professionals focused on Piping,Surveying,Boilermakers and Millwrights.
  • Managed efficient teams of up to 20 Pipefitters and Welders at a time.

Construction Foreman

Tindol Construction
07.2021 - 08.2022
  • Renewable Energy Division
  • Incharge of Errosion Control & maintain State Requirements.
  • Supervised field crews to maximize quality and work efficiency.
  • Coordinated materials to maintain steady flow and meet productivity objectives.
  • Coordinated with Survey to install SiltFences, straw wattles, and build entrances.
  • Inspected work for compliance with applicable regulations and job specifications.
  • Verified and submitted team timesheets.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Checked equipment to determine if maintenance was required.

Instrument Technician

Culberson Construction Inc
04.2021 - 07.2021
  • Used Leica and Nikon Total Stations AutoCAD to create detailed maps from raw field data.
  • Performed field calculations to complete assessments.
  • Coordinated survey crew activities and oversaw field operations.
  • Gathered, organized, and modeled data for reports and presentations.
  • Measured and marked Coordinate lines and elevations for pumps,vessels and key topographic features.
  • Assessed individual survey project needs and planned workflows.
  • Completed complex technical surveys for development of roadway, intersection and bridge construction plans.
  • Facilitated construction by mapping out utility installations and establishing reference points, grades, elevations and Coordinates.
  • Set up, adjusted, and operated surveving equipment, including electronic total station, data collector, and GPS equipment, in order to measure distances, elevations, and angles, Performed complex surveying calculations in order to analyze raw data
  • Prepare handheld notes and drawings.
  • Performed pre pour checkouts and post pour as builds and red line drawings.
  • Layout for foundations, sumps, and underground piping.
  • Establish grade, elevation, and projection for footers, pedestals, anchor bolts, and shims for steel erection.
  • Compiled site wide as built drawing
  • Plumb structural steel and compressor columns.

Construction Foreman

Tindol Construction
05.2018 - 03.2021
  • Oil&Gas Division
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed Facility and Pipeline projects according to schedule and quality demands.
  • Inspected sights to evaluate safety, operations and crew performance against objectives.
  • Calculated materials and labor required to complete jobs on-schedule and prepared estimates.
  • Operated HeavyEquipment on daily basis.
  • Sourced suppliers and purchased necessary materials for work.
  • Administered budget, tracked expenses and documented changes.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-day-day duties accurately and efficiently.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Worked flexible hours; night, weekend, and holiday shifts.
  • Performed duties in accordance with applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Proved successful working within tight deadlines and fast-paced atmosphere.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.

General Foreman

AEI Field Services
07.2017 - 04.2018
  • Completed final walkthroughs at job sites to close out projects.
  • Worked alongside team to accomplish work goals according to schedule.
  • Reviewed blueprints, Iso metric, P&ID drawings and specifications to fully understand project scope ahead of time.
  • Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Adhered to US Occupational Health and Safety Administration mandates requiring use of gloves and insulating blankets for installation of high-voltage equipment.
  • Utilized Earth Moving equipment to excavate, install and backfill drainage pipes.
  • Prepared welding equipment to perform advanced welding work.
  • Completed welding projects using gas tungsten arc, gas metal arc, flux-cored arc, plasma arc and shielded metal arc equipment.
  • Assembled structural forms such as boiler parts and pressure vessels.

Carpenter Leadman

Bechtel Construction Company
09.2016 - 07.2017
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
  • Specialized in foundations, framing and finish carpentry.
  • Safely operated electric cordless and hammer drills and cutting torches.
  • Assembled durable, high-quality structures by working with forming systems, hand tools and range of equipment.
  • Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
  • Aligned and squared frames and forms for installation.
  • Properly poured, set and cured concrete.
  • Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
  • Set and built form systems and set embeds.

Carpenter Concrete Finisher

Standard Construction Inc
07.2016 - 10.2016
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Set wood and other forming materials to prepare for concrete pours.
  • Mixed, spread and patched concrete to specifications.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.

Carpenter Concrete Finisher

Bomac
02.2016 - 07.2016
  • Set wood and other forming materials to prepare for concrete pours.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Created specific finishes on poured concrete.
  • Reviewed all project documentation and blueprints to prioritize and schedule job tasks.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Proved successful working within tight deadlines and fast-paced atmosphere.
  • Maintained energy and enthusiasm in fast-paced environment.

Education

Bachelor Of Kinesiology - Sport And Fitness Management

Texas A&M International University
Laredo, TX
08.2012

High School Diploma -

Roma High School
Roma, TX
06.2009

Bachelor Of Business Administration - Business

South Texas College
Mcallen, TX

Skills

  • Project Drawings
  • Materials ordering
  • Redline drawings
  • Fall Protection
  • Isometric Drawing
  • P&ID Walkthroughs
  • Line Designs
  • Hand and Power Tools
  • Safe Work Practices
  • Creative Solutions
  • Worksite Safety
  • Piping Specifications
  • Daily Facility Operations
  • Construction Management
  • Project Management
  • Machinery Operation
  • Maintaining Clean Work Areas
  • Pipe Measuring and Cutting
  • Piping Layout
  • Blueprints Analysis
  • Industrial Piping
  • Crew Safety Meetings
  • Pipe Fabrication
  • Performance Goals
  • Pipefitting
  • Blueprints and Specifications
  • Piping design expertise
  • Blueprint reading

Companies I've done projects for.

  • SAMSUNG
  • BHP
  • EXXON MOBILE
  • CHEVRON PHILLIPS
  • ENERGY TRANSFER
  • CINCO OIL&GAS
  • MP MATERIALS
  • DOW CHEMICAL
  • BOARDWALK
  • PIONEER

Timeline

Pipe General Foreman

Sundt Construction
09.2023 - Current

Superintendent

Tindol Construction
08.2023 - Current

Pipefitter Foreman

Fluor Corporation
02.2023 - 05.2023

Pipefitter Foreman

Yates Construction
08.2022 - 01.2023

Construction Foreman

Tindol Construction
07.2021 - 08.2022

Instrument Technician

Culberson Construction Inc
04.2021 - 07.2021

Construction Foreman

Tindol Construction
05.2018 - 03.2021

General Foreman

AEI Field Services
07.2017 - 04.2018

Carpenter Leadman

Bechtel Construction Company
09.2016 - 07.2017

Carpenter Concrete Finisher

Standard Construction Inc
07.2016 - 10.2016

Carpenter Concrete Finisher

Bomac
02.2016 - 07.2016

Bachelor Of Kinesiology - Sport And Fitness Management

Texas A&M International University

High School Diploma -

Roma High School

Bachelor Of Business Administration - Business

South Texas College
Alberto Salinas Jr