Detail-oriented builder with expertise in client relationship management and construction management. Known for implementing effective solutions and enhancing project efficiency while adhering to safety standards.
Overview
2
2
years of professional experience
Work History
Custom Home Builder
Burton Homes
Wellsboro, Pennsylvania
03.2025 - 09.2026
Collaborated with clients to design custom home layouts and features.
Assisted in selection of quality materials for home building projects.
Regularly communicated with clients to provide project progress updates.
Implemented cost-effective construction solutions that streamlined project workflows.
Resolved issues on-site quickly to keep projects moving forward.
Provided technical advice and support when troubleshooting problems encountered during the build process.
Conducted regular site visits to inspect progress of construction projects.
Cultivated relationships with contractors, suppliers, and subcontractors, facilitating timely project completions.
Ensured that all safety regulations were adhered to during the building process.
Oversaw and guided crew members in task execution on-site, ensuring adherence to project timelines.
Prepared and planned worksites to help jobs run smoothly.
Assigned specific tasks to team members based on their skills and experience. Assigned specific tasks to employees based on skillset.
Facilitated daily operations to ensure the production team met project deadlines. Facilitated progress in daily site operations.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Recruited and hired workers, in addition to supervising and monitoring daily performance.
Monitored equipment operation during extraction process to detect problems.
Adjusted equipment to prepare for excavating and boring geological materials.
Operated equipment such as skid steer and excavator to assist with the build process.
Flooring Installer
Chris's Precision Flooring
Wellsboro, Pennsylvania
11.2024 - 03.2025
Installed various flooring materials including hardwood, laminate, and tile.
Prepared surfaces by cleaning and leveling floors prior to installation.
Collaborated with team members to ensure timely project completion.
Utilized hand tools and power tools for precise flooring installations.
Followed safety protocols to maintain a safe work environment.
Assisted in measuring and cutting flooring materials accurately.
Communicated effectively with clients to understand their flooring needs.
Maintained inventory of tools and materials for upcoming projects.
Installed carpet, tile, laminate, and hardwood flooring in residential and commercial settings.
Demonstrated excellent problem-solving skills when unexpected issues arose during job sites.
Measured and cut flooring materials to fit the dimensions of each room.
Removed old flooring materials such as carpets or tiles.
Worked with a variety of tools including saws, hammers, drills, screwdrivers.
Loaded and unloaded trucks with flooring supplies at various job sites.
Communicated effectively with clients regarding progress updates and potential issues.
Performed minor repairs to existing floors before installation process began.
Created custom cuts for around pipes or other objects in the room.
Reviewed blueprints and drawings to determine layout of floor planks or tiles accurately.
Applied adhesives to subfloors prior to laying down new flooring material.
Checked finished installations for accuracy and quality assurance purposes.
Followed safety protocols while operating power tools or hazardous materials.
Inspected rooms for any obstacles that could interfere with installation process.
Evaluated work areas before planning flooring layout for different projects.
Ensured proper alignment of boards during installation process.
Resolved customer complaints related to flooring installations promptly.
Formed smooth flooring foundations by installing plywood or Masonite over support structures.
Utilized proper techniques to protect surfaces from damage during flooring installations.
Applied waterproofing compounds and filled cracks with materials such as plaster, putty or grouting.
Maintained inventory list of items used on job sites to provide reordering details.
Prioritized tasks for each job after reading project blueprints and documents.