Journeyman Electrician (Underground Specialist)
BlueOval Battery Park Project
Marshall, Michigan
12.2023 - 06.2026
- Led the installation of underground infrastructure for high-voltage electrical systems in a large-scale manufacturing facility.
- Installed 3-inch and 4-inch PVC conduit using industrial primer and heavy-duty cement to ensure reliable electrical infrastructure.
- Assembled and secured duct banks with spacers before concrete pours.
- Installed and secured mule tape in over 10,000 feet of conduit to prepare routes for future distribution crews.
- Worked with Rigid conduit (GRC) for concrete stub-ups, performing on-site cutting and threading to facilitate efficient installation.