After 14 years in the energy industry, I've learned that teamwork, diligence, and communication are some of the most important qualities required in ensuring a quality product to the client.
Overview
14
14
years of professional experience
1
1
Certification
Work History
UTILITY, COATING, AND QA/QC INSPECTOR FOR WILLIAMS ENERGY
AUDI PRICE INSPECTION
06.2023 - Current
WORKING WITH THE CLIENT TO ENSURE SATISFACTION
OBSERVED COATING AND CONSTRUCTION CREWS
INSPECTED ALL MATERIALS AND PROJECT AS-BUILTS
GPS TECHNICIAN/INSPECTOR
ENTRUST SOLUTIONS
06.2022 - 06.2024
DATA IMPROVEMENT PROJECT IN DENVER COLORADO FOR BLACK HILLS ENERGY
JOB DUTIES INCLUDE MONITORING UTLITY LOCATORS AND COLLECTING GPS COORDINATES FOR LOCATION AND DEPTH OF UNDERGROUND UTILITIES, AND WORKING WITH BLACK HILL ENERGY EMPLOYEES TO ENSURE SATISFACTION AND ACCURACY
PARTY CHIEF
SGC ENGINEERING
04.2021 - 05.2022
C350 PROJECT IN CINCINNATI, OH
FOR DUKE ENERGY
JOB DUTIES INCLUDE ALL AS-BUILT DUTIES SUCH AS PIPE INSTALLATION AND DATA COLLECTION, BORE PROFILES, STAKING WORKSPACE, FABRICATION, TALLYING PIPE, PREFORMING REROUTES OF THE LINE, AND WORKING WITH CLIENT AND CONTRACTOR TO ENSURE CLIENT’S SATISFACTION
INSTRUMENT MAN
ENSITE USA
11.2020 - 02.2021
JOB DUTIES INCLUDE ALL AS-BUILT DUTIES SUCH AS R.O.W STAKING, TALLYING, PROFILING BORES, COLLECTING DATA ON MAINLINE AND TIE-INS FOR ENTERPRISES DUAL LAY LINE
SOLAR INSTALLER
BLATTNER ENERGY
06.2020 - 11.2020
COMPLETED SOLAR INSTALLATION ON TWO CREEKS SOLAR PROJECT FOR NEXTERA ENERGY
JOB DUTIES INCLUDE INSTALLATION OF SUPPORTS AND PANELS AND WORKING WITH OTHER CREWS IN WHATEVER WAS NEEDED
PARTY CHIEF
TMI SOLUTIONS LLC
09.2019 - 03.2020
EPIC Pipeline in Del Rio, TX
Performed topographic, staking, boundary surveys; Worked on all as-built duties including fabrication on valve sites and tie-ins
PARTY CHIEF
TRANSGLOBAL SERVICES
05.2019 - 09.2019
Performed all as built duties including Staking, tallying pipe, covering mainline and tie in construction crews on the Navigator Xpress
PARTY CHIEF
MOTT MACDONALD
04.2017 - 05.2019
04/17-01/18 Party Chief on the Leach Xpress in Moundsville, WV
Staked ROW and centerline as needed
As-built for road bores, reroutes, and tie in crews
Performed clean up surveys after completion
01/18-04/18 Party Chief on the Atlantic Coast Pipeline in Snowshoe, WV
Staking for construction
Building TWS boxes, adjusting them as needed
Cut line and flagged trees for line of sight for the clearing company
06/18-11/18 Party chief on the WBX pipeline in Elkins, WV
All as-built duties; Tie-ins, main line, wetland crossings and road bores
01/19-05/19 Party chief on LEAP Pipeline Many, LA and Abeline, TX
Preliminary staking (including conventional equipment), boundary surveys, and as built surveys
INSTRUMENT MAN
POOLE ENGINEERING & SURVEY
08.2016 - 04.2017
Local land surveying (GPS & Conventional)
Layout surveys for construction contractors
Searching and setting of Property Corners for land plats
Topographic surveys on properties for construction or selling purposes
PARTY CHIEF
SURVTECH SOLUTIONS
03.2016 - 08.2016
Construction surveys on removed, replaced, and installation of pipelines for Florida Gas Transmissions
Illustrated isometric drawings, read and interpreted alignment sheets, performed inventory of removed and installed pipe, preliminary surveys, and redlining on valve and meter stations
INSTRUMENT MAN
ENSITE USA
07.2015 - 11.2015
Construction on a CO2 line for Kinder Morgan
All construction duties from staking to main line and tie-ins
INSTRUMENT MAN
SHAFER, KLINE, & WARREN
03.2015 - 11.2015
03/15-07/15 Instrument Man on Rose Rock Pipeline in Fort Morgan, CO
Preliminary surveys (including boundary and topographic surveys)
07/15-11/15 Instrument Man in Oskaloosa, IA
Performed mainline and tie-in surveys
Also worked on fabrication, staking and tallying pipe for river bores and valve sites
INSTRUMENT MAN & RODMAN
UNIVERSAL PEGASUS INTERNATIONAL
06.2010 - 09.2013
06/10-02/11 Okeechobee, FL
Rodman & Instrument Man (GPS)
Ran GPS equipment Tie Ins survey for as built 36” for Florida Gas Transmissions C/L and ROW stake; Main Line; Fabrication
06/11-10/11: Laredo, TX
As-built survey on 6” and 8” St
Mary’s gathering systems Data collection on mainline, tie-ins and fabrication, Preliminary survey on well pads using Trimble R-8 GPS unit with TSC2 data collector
02/12-01/13: Illinois to Oklahoma
Instrument Man (GPS & Conventional) Preliminary Survey for Enbridge 36” Crude Oil P/L
Set control / located utilities / existing and proposed centerline survey with data collection
Boundary / Staked pipe yards and pump stations with topographic surveys
03/13-07/13: Gallatin, TN
Instrument Man (GPS) D.O.T take up and relay for Spectra Energy
Duties include all as-built duties including staking R.O.W & ditch line and tallying pipe
07/13-09/13: Instrument Man (GPS & Conventional) Lake Okeechobee, Florida Preliminary Survey for Florida Power & Light
We staked center line and performed boundary surveys
Senior Administrative Assistant at Coast to Coast Inspection Services/Acuren Inspection, Inc.Senior Administrative Assistant at Coast to Coast Inspection Services/Acuren Inspection, Inc.