Summary
Overview
Work History
Education
Skills
Timeline
Generic

Alex Isaacs

Dillsboro,IN

Summary

Detail-oriented Framing Carpenter experienced in construction blueprint interpretation and wood framework assembly. Delivered high-quality workmanship through effective project coordination and adherence to safety compliance. Committed to continuous learning and adapting to new challenges in fast-paced environments.

Overview

11
11
years of professional experience

Work History

Framing Carpenter

JI construction
Dillsboro, Indiana
11.2017 - Current
  • Constructed wooden frameworks for residential and commercial buildings.
  • Collaborated with team members to ensure precise measurements and cuts.
  • Interpreted blueprints to execute framing tasks accurately.
  • Coordinated with subcontractors to align project timelines and goals.
  • Evaluated materials for quality before use in framing projects.
  • Laid out floor joists in accordance with approved plans.
  • Measured and cut lumber to required size for framing walls, floors, and roofs.
  • Attached sheathing materials to exterior walls of buildings with nails or screws.
  • Connected headers over windows and doorways in order to provide support for the structure's load bearing capacity.
  • Erected rafters, studs, and other structural components.
  • Fabricated trusses from engineered drawings and specifications.
  • Repaired damaged structures using appropriate methods such as hammering, sawing, drilling.
  • Installed window and door frames into interior walls.
  • Ensured that all safety regulations were adhered to while working at height.
  • Constructed formwork for concrete foundations using timber boards.
  • Assisted other tradespeople during the building process.
  • Assembled staircases according to code requirements.
  • Fitted insulation between studs of framed walls prior to covering them with drywall sheets.
  • Checked accuracy of measurements against blueprints before cutting materials accordingly.
  • Maintained a clean workspace by disposing off any waste material properly after completing tasks.
  • Inspected finished work for quality assurance purposes before signing off each stage of construction.
  • Applied weatherproofing treatments to exposed wood surfaces prior to painting or staining.
  • Fastened sub-flooring panels securely in place before installing floor coverings such as carpets or vinyl tiles.
  • Fitted, cut and installed wood trim.
  • Installed doors, frames and wood components following manufacturers' instructions.
  • Positioned and held timbers, lumber, or paneling in place for fastening or cutting.
  • Checked wood and other materials to assess for damaged or defective items before starting projects to accurately determine projects scales and quotes.
  • Applied caulk, sealants and other agents to installed surfaces.
  • Completed tear-down of existing construction to prepare for new construction.
  • Fastened timbers or lumber with glue, screws or pegs.
  • Selected and transported necessary tools and materials from storage to work site for carpentry tasks.
  • Mixed mortar, plaster, and grout according to standard formulas.
  • Worked independently on projects and tasks within carpentry team.
  • Installed windows, flooring, or trim using hand or power tools.
  • Consistently constructed square and level projects.
  • Removed damaged or defective parts or sections of structures and repaired or replaced using hand tools.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Anchored and braced forms and other structures in place using nails, bolts, anchor rods, steel cables, planks, wedges and timbers.
  • Verified trueness of construction using plumb and level.
  • Roughed in door and window frames or subflooring in structures undergoing construction or repair.
  • Covered subfloors with building paper and lay hardwood or parquet floors by nailing to subfloor or cementing to mastic base.

Car detailer

Whitewater Motor
West Harrison, Indiana
05.2016 - 11.2017
  • Cleaned and polished vehicles to enhance appearance and customer satisfaction.
  • Cleaned cars both externally and internally by hand or with use of automated equipment.
  • Cleaned and polished vehicles using wax, polishes, detergents, brushes, water hoses, vacuums and other specialized equipment.
  • Applied wax and sealants to protect vehicle surfaces from elements.
  • Applied waxes to protect paint finish from weather conditions and oxidation.
  • Inspected cars for damage, ensuring thorough detailing process.
  • Inspected vehicle to verify pristine appearance for customer.
  • Vacuumed vehicle interiors to remove loose dirt and debris.
  • Cleaned windows inside and out using glass cleaner solution.
  • Cleaned upholstery, rugs and other surfaces with cleaning agents to remove dirt and debris.
  • Sanitized interiors by spraying antibacterial agent onto hard surfaces such as door handles, steering wheel covers, gear shifts.
  • Removed tar spots, tree sap and bird droppings from exterior surfaces using special cleaning solutions.
  • Removed minor flaws in refinish using sanding and buffing.
  • Operated pressure washers and vacuum systems for effective cleaning.
  • Organized detailing supplies and maintained cleanliness of work area.
  • Collaborated with team members to streamline detailing workflows.
  • Managed time effectively to complete detailing tasks efficiently.
  • Washed wide range of vehicles each day.
  • Provided customers with information about their vehicle's condition prior to detailing work being completed.
  • Utilized special-purpose cleaners to foster lasting cleanliness of vehicles.

Painter's Helper

G And H Painting
Batesville, Indiana
08.2015 - 11.2016
  • Assisted skilled painters with surface preparation and paint application tasks.
  • Mixed paint colors according to specifications for various projects.
  • Supported painters by handling supplies and materials efficiently.
  • Followed instructions from lead painters to achieve desired finishes.
  • Cleaned work areas and disposed of materials following safety regulations.
  • Maintained tools and equipment for optimal performance and safety standards.
  • Adhered to safety protocols during all painting and maintenance tasks.
  • Organized and cleaned work area and tools.
  • Operated hand tools, saws, routers and sanding equipment to prepare materials and finish project surfaces.
  • Filled cracks and breaks in plaster surfaces with putty or epoxy compounds.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
  • Removed damaged materials and prepared surfaces for optimal installations.
  • Protected surfaces with masking tape and plastic sheeting to prevent damage.
  • Collaborated with team members to ensure timely project completion.
  • Transported supplies to work sites, removed from trucks and organized for crew use.
  • Monitored paint supplies, placing orders whenever needed and properly and safely disposed of old paint.
  • Identified and located required tools prior to starting each project.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Operated equipment with strong focus on safety and ground communication.

Education

East Central High School
St.leon , IN

Skills

  • Construction blueprint interpretation
  • Wood framework assembly
  • Floor framing
  • Wall framing
  • Roof framing
  • Joist installation
  • Beam placement
  • Window installation
  • Door installation
  • Truss assembly
  • Frame assembly
  • Material quality evaluation
  • Material estimation
  • Project coordination
  • Safety regulations compliance
  • Safety guidelines adherence
  • Project inspection
  • Job site inspection
  • Attention to detail
  • Power tool operation
  • Hand tool proficiency
  • Miter saw expertise
  • Lumber cutting
  • Woodworking techniques
  • Expert craftsmanship
  • Building repair
  • Frame finishing
  • Debris removal
  • Repairing
  • Production and processing
  • Mechanical tools
  • Team collaboration
  • Project coordination
  • Time management
  • Attention to detail
  • Problem solving
  • Communication skills
  • Frame finishing
  • Miter saw expertise
  • Design
  • Job site inspection
  • Hardware installation
  • Custom framing design
  • Material estimation
  • Frame assembly
  • Wood framing
  • Lumber cutting

Timeline

Framing Carpenter

JI construction
11.2017 - Current

Car detailer

Whitewater Motor
05.2016 - 11.2017

Painter's Helper

G And H Painting
08.2015 - 11.2016

East Central High School
Alex Isaacs