Summary
Overview
Work History
Education
Skills
Timeline
Generic

Alfonso Jenkins

Barnwell,SC

Summary

Hardworking construction laborer with background in various construction projects including residential and commercial developments. Possess strong skills in manual labor, project coordination, and site preparation. Demonstrated ability to work efficiently under pressure and adapt to changing environments. Contributed to improving job site safety and completing projects on time by effectively collaborating with team members and following precise instructions.

Overview

27
27
years of professional experience

Work History

Builder's Laborer

Tri-pallet company
Barnwell, SC
08.2024 - Current
  • Provided support during demolition activities, including breaking down walls and tearing up floors.
  • Controlled traffic passing near, in or around work zones.
  • Worked collaboratively with other tradespeople onsite in order to complete tasks efficiently.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Used hand tools such as hammers, wrenches, saws and drills for various tasks related to building projects.
  • Participated in lifting operations when required, utilising correct manual handling techniques.
  • Used laser measuring tools to calculate lengths, widths, and heights.

Installer

Wades Repair
Barnwell, South Carolina
01.2008 - 08.2024
  • Followed building standards and codes during unit installations.
  • Ensured work area cleanliness and safety, preventing accidents and maintaining a professional environment.
  • Followed safety guidelines and wore protective gear when using power drills, circular saws, and other power tools.
  • Configured and tested installed systems, ensuring functionality meets customer and manufacturer specifications.
  • Filled out work orders, repair logs and maintenance plans to document work completed.
  • Removed systems and fixtures to prepare for replacements.
  • Conducted pre-installation site visits to measure, evaluate, and plan installations, reducing project delays.
  • Tested installed hardware and software to ensure proper functioning.

Installer

SRS Heating and cooling
Barnwell, SC
03.1998 - 11.2007
  • Maintained records of installations, repairs, maintenance and tests performed on computer systems.
  • Followed building standards and codes during unit installation

  • Removed systems and fixtures to prepare for replacements.
  • Followed blueprints, diagrams, and installation instructions accurately to complete tasks efficiently.
  • Adhered to local building codes and safety regulations in all installation activities.
  • Performed timely and reliable service in shops and outdoors in variable weather conditions.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.

Education

GED -

Barnwell High School
Barnwell, SC
06-2000

Skills

  • Team-oriented and dependable
  • Heavy lifting
  • Installation coordination
  • Multitasking and organization
  • Dependability and reliability
  • Power tool operation
  • Worksite safety

Timeline

Builder's Laborer

Tri-pallet company
08.2024 - Current

Installer

Wades Repair
01.2008 - 08.2024

Installer

SRS Heating and cooling
03.1998 - 11.2007

GED -

Barnwell High School
Alfonso Jenkins