Physically capable Technician, Operator with the coordination and manual dexterity to complete jobs. A highly trained employee with a background in Boilermaker and Safety Technician. Seeking a new position as a "WireLine Operator" where expert organizational and decision making skills will be best utilized.
Motivated to learn new trades and skills. Interested in growing a career and fostering leadership capabilities. As a WireLine Operator I will take my job really serious. As a WireLine Operator I will be responsible for monitoring and assessing hazardous and unsafe situations and developing measures to assure personal safety.
- Installed and removed valves, gaskets, blind flanges
- Install and remove exchanger components
-Install blinds on head nozzle and shell nozzle
- Remove channel head from exchanger with correct tools
- Remove bundle from exchanger with extractor
- Take exchanger components get checked and looked at and see what needs to get fixed
- Install bundle back into exchanger with extractor
- Install floating head back into exchanger and torqued
- Install channel head back into exchanger and torqued
- Remove blinds from head nozzle and shell nozzle
- Torque with clickers wrenches
- Install and remove RV's valves
- Completed work for projects special request and changes quickly and effectively
- Ensured machinery and equipment was maintained by performing repairs
- Followed company procedures to maintain work environment in neat and orderly condition
- Provided outstanding customers service
- Conducted hydro water testing
- Not scared of height - Installed and removed valves, gaskets, blind flanges
- Install and remove exchanger components
-Install blinds on head nozzle and shell nozzle
- Remove channel head from exchanger with correct tools
- Remove bundle from exchanger with extractor
- Take exchanger components get checked and looked at and see what needs to get fixed
- Install bundle back into exchanger with extractor
- Install floating head back into exchanger and torqued
- Install channel head back into exchanger and torqued
- Remove blinds from head nozzle and shell nozzle
- Torque with clickers wrenches
- Inspected job sites and completed in-depth report outlining safety concerns and corrective recommendation
-Monitored safety and assessed risk level and mitigation strategies at industrial worksites and on construction jobs
- Directed recordkeeping and paperwork preparation in line with OSHA requirement
- Updated contract, project and crew leaders with daily status reports on observations and incidents
- Conduct regular audits to validate onsite safety procedures and processes for consistency and efficacy
- Provide leadership and guidance on safety issues
- Provide and communicate various safety reports
- Maintain and update proper documentation [Permits,JSA,safety training records ]
- Completed work for projects special request and changes quickly and effectively
- Ensured machinery and equipment was maintained by performing repairs
- Followed company procedures to maintain work environment in neat and orderly condition
- Provided outstanding customers service
- Conducted hydro water testing
- Not scared of height
- Installed and removed valves, gaskets, blind flanges
- Install and remove exchanger components
-Install blinds on head nozzle and shell nozzle
- Remove channel head from exchanger with correct tools
- Remove bundle from exchanger with extractor
- Take exchanger components get checked and looked at and see what needs to get fixed
- Install bundle back into exchanger with extractor
- Install floating head back into exchanger and torqued
- Install channel head back into exchanger and torqued
- Remove blinds from head nozzle and shell nozzle
- Torque with clickers wrenches
- Inspected job sites and completed in-depth report outlining safety concerns and corrective recommendation
- Directed recordkeeping and paperwork preparation in line with OSHA requirement
- Updated contract, project and crew leaders with daily status reports on observations and incidents
- Conduct regular audits to validate onsite safety procedures and processes for consistency and efficacy
- Provide leadership and guidance on safety issues
- Provide and communicate various safety reports
- Maintain and update proper documentation [Permits,JSA,safety training records ]
- Supported Technicians In equipment maintenance and repair
- Monitor gauges , dials on various indications to ensure machine is working properly
- Organized work to meet demanding production goals
- Perform complex mechanical alignment and calibration of the equipment to qualify standards
- Performed basic machine set up
- Main positive relationship with customer
- Not scared of heights
- Go look at job task
- Get permit for job
- Torque with clicker wrenches
- Torque with hydraulic torque wrenches
- Stud tensioning
- Bolt measuring[ultrasonic]
- Hydraulic nut splitting
- Installed and removed valves, gaskets, blind flanges
- Install and remove exchanger components
-Install blinds on head nozzle and shell nozzle
- Remove channel head from exchanger with correct tools
- Remove bundle from exchanger with extractor
- Take exchanger components get checked and looked at and see what needs to get fixed
- Install bundle back into exchanger with extractor
- Install floating head back into exchanger and torqued
- Install channel head back into exchanger and torqued
- Remove blinds from head nozzle and shell nozzle
- Torque with clickers wrenches
- Installed and removed valves, gaskets, blind flanges
- Install and remove exchanger components
-Install blinds on head nozzle and shell nozzle
- Remove channel head from exchanger with correct tools
- Remove bundle from exchanger with extractor
- Take exchanger components get checked and looked at and see what needs to get fixed
- Install bundle back into exchanger with extractor
- Install floating head back into exchanger and torqued
- Install channel head back into exchanger and torqued
- Remove blinds from head nozzle and shell nozzle
- Torque with clickers wrenches