Engineering professional with overall 22 years experience.
Experience in preventive /corrective Maintenance planing, Scheduling and execution of day to day activities.
Experience in major Turnarounds, Plant Shutdowns & commissioning
Maintenance Knowledge of stationary and Rotating equipments such as compressors, pumps, Motors and turbine.
Knowledge of standard industrial safety procedures such as LOTO, confined space entry, work permit, Elevated work,
Experience.
Strong problem solving skills and the ability to work independently or as part of a team.
- Undertakes troubleshooting of equipment failure or operational problems. Seek guidance for problems of more complex nature from Lead Technician /Maintenance Supervisor, Vendor/ OEM support.
- Carry out maintenance and improve the operational efficiency, reliability and availability of all static and rotating equipment of the main complex and remote well platforms.
- Performed preventive and corrective maintenance tasks in a safe, timely and efficient manner.
- Trouble shoots the equipment faults and recommends repair strategy.
Manage, Generate and Distribute the Work Orders needed for the daily workload.
- Generate Periodic Maintenance (PM) Work Orders for the up keep of the production equipment and facility.
- Communicated with customers to prevent supply shortage.
- Identified materials, equipment and services required to execute the planned jobs.
-Construction, Pre commissioning, commissioning activities (gas turbines, generators, power generators, switch board HV LV, protection relay, transformer, motors and pumps)
-Maintenance of all kinds (motors, MCC, UPS, Aero-refrigerant)
-Start motor 5.5K, 400v. Startup power plant GTG turbine gas (3*18MW) and RGC turbine compressor gas (5002).
-Maintenance electrical (corrective and preventive maintenance) troubleshooting
-Electrical isolation (A1. A2 high and medium voltage)
Foreman
-Electrical activities (gas turbines, generators, power generators, switch board
HV and LV, protection relay, transformer, motors and pumps).
- Startup power plant GTG turbine gas and Generators.
-Maintenance electrical (corrective and preventive maintenance) troubleshooting.
- Electrical isolation (H2B2 high and medium voltage).
- Organize staff.
- Plan and organize work.
- Good command of GMAO (the software used is COSWIN).
- Carry out electrical work safely and efficiently.
- Maintenance; troubleshooting.
Very good understanding of HSE golden rules
Troubleshooting and diagnosis
Proved expertise in troubleshooting and diagnosis
Work order generation
Root cause failure analysis
Inspect, repair systems for restoration to required performance
Construction, Pre commissioning, commissioning activities (gas turbines, generators, diesel generator
● May 2013 Attending Project meetings and yard survey for BARZAN Project (FAT) in Hyundai Heavy Industries Ulsan KOREA
● July 2010 Certificate of achievement Competency Management Assurance System (CMAS)
● July 2010 ST-SERV Training at siemens 5 days in Paris France.
● June 2009 Electrical isolation Training in AREVA T&D 5 days in Aix les bains
FRANCE.
● April 2009 ATEX hazardous Area training at LCIE 5 days in Fontenay aux roses FRANCE.
● High voltage electrical safety training at EMPOWER training services limited.
● April 2006 UPS Training course at GUTOR electronic 5 days in (WETTINGEN) SWITZERLAND.
● June 2007 Protection relays Training program in AREVA T&D Technical Institute 5 days in (Lattes) France.
● October 2006 MAXIMO basic training provided by MDSL MRO credited company at IN AMENAS ALGERIA.
● December 2007 Training course at BRUSH electrical machines LTD 4 days in (LOUGHBOROUGH) UK.
● October 2007 A10 EXCITATION SYSTEM Training course at BRUSH HMA B.V 4 days in RIDDERKERK HOLLAND.
● April 2004 Compressor part I and part II 4 days in SONELGAZ Ben aknoun Algiers, Algeria.
● June 2004 Electrical Incident Investigation in GTG turbine gas 4 days in SONELGAZ.