Authored clear and comprehensive technical notes and updates for each sub-team, facilitating effective communication and information sharing among project members
Acted as the main presenter for general meetings and outreach events within the department, effectively communicating the project's goals and achievements
Maintained and updated the project calendar and meeting schedule, ensuring organizational efficiency and coordination among team members
Testing Co-Lead
Liquid Rocketry @ Illinois
05.2023 - Current
Led and supervised a team of 15 engineering students in the construction and design of a rocket engine test stand
Collaborated closely with team members to ensure the safe and functional development of test stand lines and systems
Worked in conjunction with the engine and pump teams to align the test stand's design with their specific requirements
Addressed logistical concerns, including identifying suitable testing sites and securing sponsorships for the project's funding
NPWEE Student
NASA L'SPACE Program
05.2023 - 08.2023
Assisted in drafting and editing a NASA proposal outlining a novel method of radiation shielding for space suits
Acted as the primary aerospace engineering lead, overseeing the mechanical viability of all proposed systems
Conducted in-depth research on innovative methods for radiation shielding in the context of human space flight
Evaluated and assessed six NASA proposals as part of a panel led by the NASA Chief Technologist
Actively participated in weekly, two-hour workshops hosted by NASA engineers, focused on NASA proposal writing, review processes, and technical development
NASA MicroG-NExT Testing Lead
Illinois Space Society
08.2022 - 06.2023
Defined, designed, and implemented comprehensive testing procedures and measures for the student-developed Zip-tie EVA Utility System (ZEUS)
Presented and authored a successful Test Readiness Review (TRR) presentation to a diverse audience of 20 NASA engineers, NBL Divers, and Microgravity NExT leads
Authored and delivered a Testing Operation Plan, which was presented verbally to in-water NBL Diver
Led and meticulously organized comprehensive water testing sessions aimed at accurately simulating NASA NBL conditions
Intern
Adler Planetarium
03.2021 - 05.2021
Tested optical camera technology created by the Adler Planetarium
Diagnosed and resolved bugs in camera software through debugging and coding solutions
Ensured functionality and quality of optical camera systems through rigorous testing procedures
Analyzed collected data to identify trends in light emission within the Chicago area
Supervisor / Operational Assistant Manager Trainee at Fletcher Jones Automotive GroupSupervisor / Operational Assistant Manager Trainee at Fletcher Jones Automotive Group