14 years of experience within the automotive industry in supply chain developing different roles and responsibilities. Proactive, trustworthy and respectful person with a desire to take on new job tasks. Always looking for continuous improvement in the processes and exceed business and personal expectations.
• Space Compression. Plan, design and implement strategies to generate required space for new vehicles launch without the need to add building expansions.
• Successfully launch 2 new vehicle platforms
• Material’s PFEP development for new vehicle launches.
• Design and implement new facilities required to supply new components.
• Material’s cells / kits optimization. Entire cells reduction following Material Flow Diagram.
• Forecast and expenses estimation for new projects.
• Supplier / Contractor administration.
• Responsible for the planning of the JIT and JIS Direct Deliveries area.
• Time studies, route planning and continuous improvement
• Follow up on WOW system and Stagging System.
• Empty Equipment planning. Facilities design and implementation.
• Annual Physical Inventory realization for Steel Company (31,325 PN).
• Mattsa process documentation for the implementation of a SWE.
• Plan, design, execute and coordinate warehouse relocation and expansion (19,125 PN).
• Coordinate new Project activities, ensure facilities in point of use and sequencing cells.
• Secure pull system for all new part numbers.
• Implementation of WMS System (7500 PN).
• Design and modification of layouts for part numbers in the warehouse.
• Planning, development and execution of GEM Project.
• Zero impacts to the client.
• Coordinate activities of planning supervisors in GF6&GF9 Transmission plants in the process of gears, prismatic, clean room, warehouse and finished product.
• Plan, design and execute facilities and warehouses for new model.
• Manpower calculation for new operations on JPH change projects on the production line and model changes.
• Coordinate and ensure Pre-production events
• Improvements in materials handling processes for resource optimization.
• Successful launch at the GF9 Transmission plant, handling 1230 PN.
• Process optimizations generating 52 people savings.
• Planning, development and execution of new transmission with 140 PN without impact to the client.
• Planning, coordination and organization of the gear, prismatic and clean room area, manpower management, optimization and process improvement.
• PPS pull system implementation.
• Administration of 4 leaders as direct personnel.
• New processes development, calculation of manpower for new operations, process improvements.
• Member of the international Project team in the development and implementation of the supply chain for costumer General Motors Colombia Col Motors.
• Management and design of warehouse and sequencing cells, time & movement studies, design supply routes, workload analysis, layout design.
• Pull systems EPS and PPS, elaboration of standard work documents, calculate min/max in warehouse and line.
• Manpower calculation for each operation, New processes planning, participation in Pre-production events, rebalancing of workloads, space and people optimization.
• Improvement in sequencing processes and kits, LMS implementation, NVA reduction and improvement in the different processes.
• Improvements in internal logistics process, obtaining savings in mobile equipment rental and optimization of personnel.
• Implementation and start of Trax in Body Shop, stamping and painting area.
Microsoft Office
AutoCAD
Lean Manufacturing
English intermediate
SAP
Problem solving
Proactive
Responsible
Dedicated
Teamwork
Availability
Service attitude
Solutions-based approach
Attention to small details
Follow instructions