Summary
Overview
Work History
Education
Skills
Timeline
Generic
Alicia Viridiana  Pérez Huerta

Alicia Viridiana Pérez Huerta

San Luis Potosí,SLP

Summary

14 years of experience within the automotive industry in supply chain developing different roles and responsibilities. Proactive, trustworthy and respectful person with a desire to take on new job tasks. Always looking for continuous improvement in the processes and exceed business and personal expectations.

Overview

13
13
years of professional experience

Work History

The Productivity Team (TPT) / GM

Material Planner & Indirect IE
San Luis Potosí , SLP
02.2022 - Current

• Space Compression. Plan, design and implement strategies to generate required space for new vehicles launch without the need to add building expansions.

• Successfully launch 2 new vehicle platforms

• Material’s PFEP development for new vehicle launches.

• Design and implement new facilities required to supply new components.

• Material’s cells / kits optimization. Entire cells reduction following Material Flow Diagram.

• Forecast and expenses estimation for new projects.

• Supplier / Contractor administration.

Schnellecke Logistcs

Indirect Industrial Engineer
San Luis Potosí , SLP
08.2021 - 02.2022

• Responsible for the planning of the JIT and JIS Direct Deliveries area.

• Time studies, route planning and continuous improvement

• Follow up on WOW system and Stagging System.

• Empty Equipment planning. Facilities design and implementation.

Dukke Consultants

Indirect Industrial Engineer
San Luis Potosí, SLP
11.2020 - 08.2021

• Annual Physical Inventory realization for Steel Company (31,325 PN).

• Mattsa process documentation for the implementation of a SWE.

• Plan, design, execute and coordinate warehouse relocation and expansion (19,125 PN).

Penske / GM

Project Coordinator
San Luis Potosí, SLP
05.2019 - 05.2020

• Coordinate new Project activities, ensure facilities in point of use and sequencing cells.

• Secure pull system for all new part numbers.

• Implementation of WMS System (7500 PN).

• Design and modification of layouts for part numbers in the warehouse.

• Planning, development and execution of GEM Project.

• Zero impacts to the client.

Penske / GM

Transmissions Planning Coordinator
San Luis Potosí, SLP
06.2017 - 05.2019

• Coordinate activities of planning supervisors in GF6&GF9 Transmission plants in the process of gears, prismatic, clean room, warehouse and finished product.

• Plan, design and execute facilities and warehouses for new model.

• Manpower calculation for new operations on JPH change projects on the production line and model changes.

• Coordinate and ensure Pre-production events

• Improvements in materials handling processes for resource optimization.

• Successful launch at the GF9 Transmission plant, handling 1230 PN.

• Process optimizations generating 52 people savings.

• Planning, development and execution of new transmission with 140 PN without impact to the client.

LINC

Transmissions Planning Coordinator
San Luis Potosí, SLP
11.2015 - 06.2017

• Planning, coordination and organization of the gear, prismatic and clean room area, manpower management, optimization and process improvement.

• PPS pull system implementation.

• Administration of 4 leaders as direct personnel.

LINC

New Project Engineer
San Luis Potosí, SLP
06.2014 - 11.2015

• New processes development, calculation of manpower for new operations, process improvements.

• Member of the international Project team in the development and implementation of the supply chain for costumer General Motors Colombia Col Motors.

LINC

Planning Supervisor
San Luis Potosí, SLP
10.2011 - 06.2014

• Management and design of warehouse and sequencing cells, time & movement studies, design supply routes, workload analysis, layout design.

• Pull systems EPS and PPS, elaboration of standard work documents, calculate min/max in warehouse and line.

• Manpower calculation for each operation, New processes planning, participation in Pre-production events, rebalancing of workloads, space and people optimization.

• Improvement in sequencing processes and kits, LMS implementation, NVA reduction and improvement in the different processes.

• Improvements in internal logistics process, obtaining savings in mobile equipment rental and optimization of personnel.

• Implementation and start of Trax in Body Shop, stamping and painting area.

Education

MBA -

UNID
SLP
02-2022

Skills

Microsoft Office

AutoCAD

Lean Manufacturing

English intermediate

SAP

Problem solving

Proactive

Responsible

Dedicated

Teamwork

Availability

Service attitude

Solutions-based approach

Attention to small details

Follow instructions

Timeline

The Productivity Team (TPT) / GM

Material Planner & Indirect IE
02.2022 - Current

Schnellecke Logistcs

Indirect Industrial Engineer
08.2021 - 02.2022

Dukke Consultants

Indirect Industrial Engineer
11.2020 - 08.2021

Penske / GM

Project Coordinator
05.2019 - 05.2020

Penske / GM

Transmissions Planning Coordinator
06.2017 - 05.2019

LINC

Transmissions Planning Coordinator
11.2015 - 06.2017

LINC

New Project Engineer
06.2014 - 11.2015

LINC

Planning Supervisor
10.2011 - 06.2014

MBA -

UNID
Alicia Viridiana Pérez Huerta