Improved pipefitting efficiency by assisting my fitter with measurements, finding coordinates, pipe preparation, fit/bolt up pipe spools and valves, having a clear understanding of isos, locating and bringing material to work area, assisting welder with set up, jeep pipe to find damaged or defect areas, hydro test, piggyback, nitrogen purge, rig, bull rig, use torch and beveling machine
Supported seamless construction projects by preparing and organizing tools and materials for pipe fitters and welders.
Enhanced safety measures by following proper procedures when handling hazardous materials during pipe installations.
Contributed to timely project completion through efficient cutting, threading, and hammering of pipes as per specifications.
Boilermaker
JVIC
Norco, LA
09.2023 - 10.2023
Enhanced boiler efficiency by performing regular maintenance and repairs on equipment.
Reduced downtime for critical boilers by implementing effective preventative maintenance plans.