Summary
Overview
Work History
Education
Skills
Websites
Languages
Personal Information
Certification
Languages
References
Timeline
Generic

Andres Maestre

Kissimmee

Summary

Mechanical Engineer graduated from Universidad de Oriente - Anzoategui Campus with twelve (12) years of experience in gas/crude oil production fields managing matters related to internal corrosion, erosion for surface and underground equipments, including multiphase flow water/crude-oil/gas transmission pipe systems. I have worked on the development and implementation of methodologies for Integral Management of Corrosion and Mechanical Integrity using Risk-Based Analysis Techniques in order to Control internal and external corrosion, erosion, as well as optimize chemical treatments and select, install and optimize corrosion monitoring systems. My experience in production fields includes high and low water section fields, of high and low productivity. Corrosion Management Systems have been developed and implemented for Petrozuata - Venezuela (association of ConocoPhillips/PDVSA) and for HOCOL S.A. - Colombia. I have rendered advising services on internal Corrosion to consulting companies such as Tecnoconsult and Tivenca, in Venezuela. I have provided Technical consultant at internal corrosion and monitoring of the Protection indicators the Internal and External Corrosion to EMS – MEXICO in the Mechanical Integrity Project of the System 4 of PEMEX. I worked as Project Engineer and Mechanical Discipline Leader at INELECTRA S.A.C.A, for the projects "Basic Engineering and Detail for the buildings of the Industrial Complex Santa Inés - COMINSI" and the project “Expansion of the Refinery of Puerto La Cruz - RPLC Deep Conversion Project ". I worked as Project Engineer at CARABOBO INGENIERIA Y CONSTRUCCIÓN, S.A. (CIC, S.A.), participating in the development of the Basic and Detailed Engineering of the project “Centro de Procesamiento de Fluidos de 60MBD” of the Carabobo block belonging to the PETROCARABOBO (Subsidiary of PDVSA). In the last years, I worked in the construction area, acquiring knowledge in building remodeling, building maintenance and electrical works.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Electrician Foreman

Polk Power Solutions, Inc
Jacksonville
10.2024 - Current
  • Supervise & Cordinate project activities during the construction.
  • Perfom daily report of activities developed.
  • Perfom material list.
  • Daily communication with General Contractor or client.
  • Perform weekly schedule activities.
  • Following to schedule activities has been developed on time.
  • Perfom Layout according blueprints.

Electrician Helper

Polk Power Solutions
Orlando
10.2023 - 10.2024
  • Pulling wires, run circuits, jumpers, box installation, trim installations, fixtures installation.

Maintenance Foreman

Innovative Building Solutions
Daphne
01.2023 - 06.2023
  • Supervise & Cordinate maintenance activities.
  • Perform inspection report & daily report of activities developed.
  • Keep Communication with customers during task are perfomed.
  • Develop Scopes of works, material list.

Maintenance Technician

Innovative Building Solutions
Daphne
10.2021 - 12.2022
  • Responsible for developing and executing maintenance activities (Repairing & Installation) as Drywall installation & Repair, Basic plumbing & electric works, FRP installation, Door installation and repair, Canopy Installation, wood and metal frame, in commercail buildings, Fast food restaurants.

Metal Framer & Drywall Hanger

RJ WALLDRY SOLUTIONS INC
Tampa
04.2020 - 02.2021
  • Metal framer & Drywall Hanger during construction of 'Heron Luxury Aparments'.
  • Metal framer & Drywall Hanger during expansion of Tampa International Airport.

Metal Framer & Drywall Hanger

South of Florida, LLC
Tampa
01.2020 - 03.2020
  • Metal Framer & Drywall Hanger Installer during construction of Veterans Hospital 'James A. Haley'.

Metal Framer & Drywal Hanger Installer

DPR Construction
Tampa
06.2019 - 11.2019
  • Metal Framer & Drywall Hanger Installer during construction of aparments 'Renaissance at West River'.

Metal Framer - Drywall Hanger

SUNPOWER CONTRACTORS, INC
Tampa
02.2019 - 05.2019
  • Metal framer installer & Drywall hanger during construction the new Seminole Hard Rock Hotel & Casino.

Project Engineer - Mechanical

CARABOBO INGENIERÍA Y CONSTRUCCIÓN, S.A. (CICSA)
04.2014 - 06.2018
  • Assigned to Engineering & Construction (E&C) Department.
  • Responsible of the supervision and revision of the conceptual, Basic and Detail engineering of project 'Centro de Procesamiento de fluidos de 60 MBD' of the Carabobo block belonging PETROCARABOBO EM (PDVSA - REPSOL - INDOIL - ONGC VIDESH).
  • Participation at the development and revision of the Detailed Engineering of static equipments of Long-Term Delivery (Desalters, degassers, separators, heat exchangers, Heaters) to be installed at the Project 'Processing Fluid Center of 60 TBPD' of the Carabobo block belonging PETROCARABOBO EM (PDVSA - REPSOL - INDOIL - ONGC VIDESH).
  • Support to procurement Department in the technical evaluation of manufacturers and suppliers of mechanical equipment and pipelines.
  • Interdisciplinary works for the execution of activities to the development of the engineering, as well as, the realization of the scope of work and technical specifications for mechanical equipment.

Project Engineer

INELECTRA SACA
Venezuela
11.2010 - 04.2014
  • Assigned to Mechanical Engineering Department.
  • Responsible of development technical specifications, calculations and designs of compressed air system and HVAC System.
  • Responsible of the supervision of the Basic and Detail Engineering of the New and Existing tanks (Design, Modifications and Revamp) for the Project Expansion of the Refinery of Puerto la Cruz - Deep Conversion Project RPLC.
  • Development technical specifications, data sheets, scope of works for static and rotating equipments.

Corrosion Engineer

TechCorr USA, LLC
México
06.2009 - 02.2010
  • Assigned to Integrity and Corrosion Department of EMS - México (Energy Maintance Services - México) to perform the integrity evaluations of pipelines sections, as well as also give support to Internal and External Corrosion Coordinator in the review of the inspection and monitoring reports, improvements proposals to the systems of the pipelines belonging to System 4 of PEMEX.

Mechanical Integrity Engineer

CIMA TQ C.A.
12.2008 - 05.2009
  • Responsible for conducting the activities necessary for risk analysis of facilities (Static Equipment, Pipes) of PETROWARAO SA (subsidiary of PDVSA).
  • This includes data collection, Risk Based Analysis, Inspection Plans, mitigation plans, monitoring.

Corrosion Engineer

ATP Ingenieria ltd.
11.2007 - 11.2008
  • Assigned to Mechanical Integrity Department of HOCOL S.A.
  • Responsible for development of activities mechanical integrity, such as, inspections on tanks and coated pipe, fluid monitoring, development of inspection plans, Coordination for the implementation of inspection plans and activities for facilities HOCOL S.A. (TENAY STATION and ALTO MAGDALENA PIPELINE).
  • Participation in the development of the software of Mechanical Integrity to HOCOL SA.

Corrosion Engineer

CIMA TQ C.A.
05.2007 - 11.2007
  • Advising services to TECNOCONSULT and TIVENCA.
  • Consulting Engineering of Internal Corrosion, Material Selection, determination of working life, Corrosion Inhibitor Injection system and corrosion monitoring systems for PDVSA GAS ANACO - AGLA Project.

Assets Integrity Engineer

Petrozuata (Conoco Phillips - PDVSA)
Venezuela
02.2007 - 05.2007
  • Participation in the development and implementation of Corrosion Control Management System Based on Risk Analysis for the Production Field of PETROZUATA.
  • Participation in the development of Software of Corrosion Control Management System based on Risk Analysis (RBA) for the Production Field of PETROZUATA.

Mechanical Engineer

TIVENCA
Venezuela
10.2006 - 02.2007
  • Assigned to Assets Integrity Department of PETROZUATA.
  • Participation in the development of Corrosion Control Management System based on Risk Analysis (RBA) for the Production Field (wells, transfer and gathering pipelines).
  • Development of inspection, mitigation and monitoring plans for the corrosion control.

Mechanical Engineer Internship

Petrozuata (Conoco Phillips - PDVSA)
Venezuela
09.2005 - 06.2006
  • Assigned to Assets Integrity Department to participate in the development of Corrosion Control Management System based on Risk Analysis (RBA) at the production field of PETROZUATA.
  • Data compilation to evaluate corrosion problems, visit to field, reading and updating of PI&D.

Education

Mechanical Engineer -

Universidad de Oriente
Venezuela
01.2006

Skills

* P&ID / PFD readings

* Knowledge of Control and Corrosion monitoring

* Knowledge of API, ASME, NACE and PDVSA standards

* Interdisciplinary collaboration

* Data analysis

* Equipment maintenance

* Mechanical Integrity

* Design

* Static Equipment

* Knowledge of ECDA/ICDA NACE Application

*HVAC system design

* Technical specifications

* Risk assessment

Languages

Ingles, Intermedio

Personal Information

Title: Mechanical Engineer

Certification

* Course of Design of Storage Tanks API-650. MM Training August 2013

* Asme Code Section VIII, Div. 1. Design, Manufacture and Inspection of Pressure Vessels. CEACA. February 2012.

* Mechanical Design of Atmospheric Tanks using the TANK Software - Module II. Inelectra. November 2011.

* Water Treatment Workshop. Inelectra. June 2011

* Pumps Selection and Application Workshop. Part 1. Inelectra. July 2011.

* Course of Air Conditioning system. Caracas. March – April 2011

* Basic Course of Air Conditioning System. Inelectra. Puerto La Cruz. December 2010

* Course of CORROSION certified by the Venezuelan Association of Corrosion – East Region, November 2007.

* Course on API-579 code “Fitness for Service” by ASME – CEACA, Valencia – Venezuela, April 2007.

* Basic Course for Inspectors of Static Equipments by NTC, Puerto La Cruz – Venezuela, January 2007.

* Course on Basic Principles of Corrosion by PETROZUATA, San Diego de Cabrutica – Venezuela, June 2006.

* Course on Chemical Treatment in Oil Fields by Champions Technologies, San Diego de Cabrutica – Venezuela, June 2006.

* Participant in the International Congress on Corrosion – VECORR 2005, Puerto La Cruz – Venezuela, November 2005.

* Basic Corrosion Course by LUZ, Maracaibo – Venezuela, October 2005.

* Course on AutoCad 2005.

* PIPEPHASE

* HTRI

* TANK

* RBI System

* PV Elite

Languages

Spanish
Professional
English
Professional

References

References available upon request.

Timeline

Electrician Foreman

Polk Power Solutions, Inc
10.2024 - Current

Electrician Helper

Polk Power Solutions
10.2023 - 10.2024

Maintenance Foreman

Innovative Building Solutions
01.2023 - 06.2023

Maintenance Technician

Innovative Building Solutions
10.2021 - 12.2022

Metal Framer & Drywall Hanger

RJ WALLDRY SOLUTIONS INC
04.2020 - 02.2021

Metal Framer & Drywall Hanger

South of Florida, LLC
01.2020 - 03.2020

Metal Framer & Drywal Hanger Installer

DPR Construction
06.2019 - 11.2019

Metal Framer - Drywall Hanger

SUNPOWER CONTRACTORS, INC
02.2019 - 05.2019

Project Engineer - Mechanical

CARABOBO INGENIERÍA Y CONSTRUCCIÓN, S.A. (CICSA)
04.2014 - 06.2018

Project Engineer

INELECTRA SACA
11.2010 - 04.2014

Corrosion Engineer

TechCorr USA, LLC
06.2009 - 02.2010

Mechanical Integrity Engineer

CIMA TQ C.A.
12.2008 - 05.2009

Corrosion Engineer

ATP Ingenieria ltd.
11.2007 - 11.2008

Corrosion Engineer

CIMA TQ C.A.
05.2007 - 11.2007

Assets Integrity Engineer

Petrozuata (Conoco Phillips - PDVSA)
02.2007 - 05.2007

Mechanical Engineer

TIVENCA
10.2006 - 02.2007

Mechanical Engineer Internship

Petrozuata (Conoco Phillips - PDVSA)
09.2005 - 06.2006

Mechanical Engineer -

Universidad de Oriente
Andres Maestre