Summary
Overview
Work History
Education
Skills
Timeline
Generic

Andres Moreno

Pharr,TX

Summary

* Hi im Andres Moreno. Im a journeyman electrician i have 16 years of electrical experience I started from wire pulling for Zachry as a apprentice in 2007 to 2008.

* Then from 2008 to 2012 where I learned as a level 3 helper till i became a level 4 helper to install ground grids set up test wells from C crimping to doing cat welding, and run temporary power lines for our distribution panels. In that time i also learned to read blueprints to run conduit and fabricate supports. and also learned setting pad mounted transformers and terminating them and also learned to run cable tray mount and wire instruments and lighting.

* In 2012 through 2013 as a journeyman electrician i worked for Zachry construction in the FPL cape canaveral power plant project running conduit and mounting instruments and lighting and installing on and off switches and installing cable tray.

* In 2013 though 2022 i worked for Bechtel construction as a journeyman in SPLNG Cheniere project in Sabine Pass Cameron Louisiana my job was reading blueprints run conduit and install supports and was terminating in the substations tailing in wires and terminating wires in switch gears and transformers and in the same project from 2015 to 2022 i moved over to temporary power where we provided power to the project installing power panels from installing lighting fixtures to troubleshooting components and ran wire and installed welding machines and any other machinery brought into the project and maintained the offices and inspected panels every 3 months and everything was in a safe and timing maner.

Overview

19
19
years of professional experience

Work History

Journeyman Electrician

InterstateS
Amarillo, Texas
08.2022 - Current
  • Conducted tests on electrical components, circuits, and systems to ensure compliance with safety standards.
  • Performed maintenance on existing electrical wiring and equipment.
  • Identified system malfunctions and performed repairs as needed.
  • Assisted journeyman electricians in troubleshooting complex problems.
  • Planned new installations by studying drawings, technical manuals, and other documents.
  • Used hand tools such as drills, saws, wire strippers, and crimpers to complete tasks.
  • Tested continuity of circuits using testing devices such as ohmmeters, voltmeters, ammeters.
  • Inspected completed installations for conformance to codes and regulations.
  • Connected wires to circuit breakers, transformers or other components to form circuits.
  • Maintained records of work performed for future reference purposes.
  • Instructed apprentices on proper installation techniques for various electrical components.
  • Read blueprints or schematic diagrams to determine the layout of a particular job site.
  • Ensured all safety procedures were followed while working with live wires.
  • Adhered to local building codes when installing new electrical systems.
  • Installed conduit systems, various lighting systems, and basic control systems.
  • Performed rough-in, termination, and underground work.
  • Traced and diagnosed electrical malfunctions using hand tools and test equipment.
  • Followed established safety practices when using tools and equipment.
  • Installed and maintained breaker panels for commercial and residential buildings.
  • Installed motor feeders and made standard motor connections.
  • Built controllers and panels to complete system installations.
  • Verified measurements and made accurate cuts to avoid wasting materials on job sites.

Journeyman Electrician

Bechtel Construction Company
Cameron, LA
10.2013 - 05.2022
  • Kept work areas clean, neat and free of hazards.
  • Performed rough-in, termination and underground work.
  • Traced and diagnosed electrical malfunctions using hand tools and test equipment.
  • Corrected issues and installed new fixtures, wiring, circuits and motors.
  • Dug trenches and created holes to pull conduit and install supports.
  • Troubleshot issues and developed effective solutions.
  • Installed and maintained breaker panels for commercial and residential buildings.
  • Completed semi-skilled and skilled work under supervision of fully qualified supervisors.
  • Examined and tested electrical systems to locate loose connections or other faults and make proactive repairs.
  • Built controllers and panels to complete system installations.
  • Raised quality control protocol, inspecting material for compliance.
  • Drove project up-time, diagnosing malfunctions and removing defective parts while completing repairs to restore equipment.
  • Followed established safety practices when using tools and equipment.

Journeyman Electrician

Zachry Construction Corporation
Cocoa Beach, FL
07.2012 - 08.2013
  • Kept work areas clean, neat and free of hazards.
  • Dug trenches and created holes to pull conduit and install supports.
  • Completed semi-skilled and skilled work under supervision of fully qualified supervisors.
  • Constructed and installed electrical wiring and electronic components and maintained equipment.
  • Verified measurements and made accurate cuts to avoid wasting materials on job sites.
  • Followed established safety practices when using tools and equipment.
  • Raised quality control protocol, inspecting material for compliance.

Electrician Helper Level 4

Becon Construction
Port Arthur, TX
06.2010 - 05.2012
  • Kept work areas clean, neat and free of hazards.
  • Maintained organization, cleanliness and safety in work areas.
  • Dug trenches and created holes to pull conduit and install supports.
  • Demonstrated self-reliance by meeting and exceeding workflow needs.
  • Installed electrical cables or wire fixtures.
  • Assessed wiring and equipment set up to prohibit risk of fire or electrical shock.
  • Controlled production lighting through skillful operation of lighting systems.

Electrician Helper Level 3

Becon Construction
Port Arthur, TX
04.2008 - 05.2010
  • Kept work areas clean, neat and free of hazards.
  • Maintained organization, cleanliness and safety in work areas.
  • Did underground ground grid installation
  • C crimping and cat wilding
  • Run temporary lines for temporary power
  • Install power banks For all crafts To have temporary power

Electrician Helper Level 4

Zachry Industrial
New Braunfels, TX
02.2007 - 02.2008
  • Set up equipment for wire pulls
  • Prep heads for big cable wire pulls
  • Pull wire

Education

High School Diploma -

P.S.J.A. North High School
Pharr, TX
05.2003

Skills

  • Repair Planning
  • Report Preparation
  • Malfunction Diagnostics
  • Electrical Safety
  • Scaffolding and Ladder Work
  • Attention to Detail
  • Lock Out-Tag Out Procedures
  • Blueprint Reading
  • Electrical Wiring and Fixtures
  • Grounding Installation
  • Hand and Power Tools
  • Power Cable Connection
  • Wire Insulation
  • Electrical Systems Testing
  • Layout Planning
  • Conduit and Pipe Laying
  • Diagnosis and Troubleshooting
  • Safety Awareness
  • High Voltage Termination
  • Transformer, Disconnect Switch and Ground Grid Testing
  • Circuits and Wiring
  • System Repair and Installation
  • High Voltage Breaker Testing and Commissioning
  • Equipment Maintenance

Timeline

Journeyman Electrician

InterstateS
08.2022 - Current

Journeyman Electrician

Bechtel Construction Company
10.2013 - 05.2022

Journeyman Electrician

Zachry Construction Corporation
07.2012 - 08.2013

Electrician Helper Level 4

Becon Construction
06.2010 - 05.2012

Electrician Helper Level 3

Becon Construction
04.2008 - 05.2010

Electrician Helper Level 4

Zachry Industrial
02.2007 - 02.2008

High School Diploma -

P.S.J.A. North High School
Andres Moreno