Summary
Overview
Work History
Education
Skills
Timeline
Generic

Andres Nino

Alvin

Summary

Detail-oriented Scaffold Foreman familiar with scaffolding types, material management and scaffold building techniques. Accommodating and hardworking individual bringing 15+ years of hands-on experience erecting and dismantling scaffolds. Expertise in building. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Resourceful Site Supervisor tenacious about keeping operations on-schedule and on-budget. Successful at coordinating diverse resources and satisfying tough clients according to demanding timelines.

Overview

17
17
years of professional experience

Work History

Scaffold Foreman

Apache Industrial Services
Deer Park, TX
06.2016 - 11.2019
  • Inspected scaffold erections for condition and compliance with standards.
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Coordinated job schedules and bids to maximize work and revenue.
  • Managed team of 9 employees erecting scaffolds up to 120 feet.
  • Trained new employees on proper safety procedures for working on scaffolding.
  • Maintained safety and operational procedures for [Number] projects at heights of up to [Number] feet.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Directed projects according to schedule and quality demands.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Tracked supplies, employee hours and costs.

Welder

J W Hall LLC
Santa Fe, TX
07.2023 - Current
  • Welded in flat, horizontal, vertical, and overhead positions.
  • Inspected welds and checked critical measurements to meet specifications.
  • Fabricated shop parts directly from blueprints.
  • Removed and repaired unacceptable welds with air arc and grinder to meet quality guidelines.
  • Prepared welding equipment to perform advanced welding work.
  • Clamped, held, tack-welded, heat-bent and bolted component parts to achieve required configurations and positions.
  • Operated hoists, cranes, and power tools to dismantle equipment to find and remove defective parts.
  • Utilized blueprints and diagrams to compare finished products against design specifications.
  • Maintained safety by wearing protective equipment, staying alert and following procedures.
  • Cut, grinded and bent edges of materials to be joined for snug fit using power grinders and hand tools.
  • Welded metal components in vertical, overhead and flat positions.
  • Bolted, clamped and tack-welded parts to secure components prior to welding.

Scaffold Builder

Apache Industrial Services
Deer Park, TX
06.2014 - 08.2016
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
  • Worked around live machinery and ongoing operations to complete [Number] scaffolding projects on-time and under budget.
  • Maintained safety and operational procedures for 5 projects at heights of up to 135 feet.
  • Carried materials and equipment weighing up to 50 pounds onto job sites in various climates and weather conditions.
  • Trained over 8 newly hired employees on safest ways to erect and take down scaffolding.
  • Inspected scaffolding for safety and structural integrity before each use.
  • Trained new employees on proper safety procedures for working on scaffolding.
  • Operated forklifts and other heavy equipment.

Scaffold Builder

Brand/Safeway Industries
Pasadena, TX
08.2006 - 04.2012
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
  • Worked around live machinery and ongoing operations to complete [Number] scaffolding projects on-time and under budget.
  • Maintained safety and operational procedures for 15 projects at heights of up to 220 feet.
  • Carried materials and equipment weighing up to 80 pounds onto job sites in various climates and weather conditions.
  • Trained over 14 newly hired employees on safest ways to erect and take down scaffolding.
  • Inspected scaffolding for safety and structural integrity before each use.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Operated forklifts and other heavy equipment.

Education

GED -

Alvin High School
Alvin, TX

Associate of Applied Science -

Alvin Community College
Alvin, TX
05.2024

Skills

  • Equipment Loading
  • Managing Supplies
  • Scaffold Erection Procedures
  • Site Cleanup
  • Quality Control Guidelines
  • Managing Materials
  • Permitting Requirements
  • Safety Enforcement

Timeline

Welder

J W Hall LLC
07.2023 - Current

Scaffold Foreman

Apache Industrial Services
06.2016 - 11.2019

Scaffold Builder

Apache Industrial Services
06.2014 - 08.2016

Scaffold Builder

Brand/Safeway Industries
08.2006 - 04.2012

GED -

Alvin High School

Associate of Applied Science -

Alvin Community College
Andres Nino