Summary
Overview
Work History
Education
Skills
Timeline
ProjectManager

Andres Vera-moreno

Project Manager
Boynton Beach,FL

Summary

Focused and adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing multiple trades and employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance. Successful at directing change management initiatives requiring fast-paced execution. Accomplished in project management with proven success in construction industry. Offers strong analytical, planning and organizational skills to manage competing demands. Experience working with teams to accomplish short- and long-term project goals. Managed budgets and monitored project costs. Hardworking and passionate job seeker with strong organizational skills eager to secure a superintendent or assistant project manager position. Ready to help team achieve company goals. Focused on obtaining a General Contractors license .

Overview

6
6
years of professional experience
4
4
years of post-secondary education

Work History

Project Manager

Hart Homes
Fort Lauderdale , FL
02.2021 - 07.2022
  • Maintained relationships with material vendors to lower costs and diversify capabilities.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Developed and initiated projects, managed costs and monitored performance.
  • Updated operational methods and oversaw accounting procedures for improved efficiency.
  • Maintained clear communication with precise technical writing to document and inform critical processes.
  • Led project teams through design, construction and launch process.
  • Modified and directed project plans to meet organizational needs.
  • Provided detailed product orders based on project drawings and technical specifications.
  • Provided fiduciary oversight to remain within budget constraints, recommending project adjustments where necessary.
  • Facilitated communication between internal personnel, contractors and vendors for project cohesion.
  • Drove team success through shared vision and recognition of quality performance.
  • Identified plans and resources required to meet project goals and objectives.
  • Orchestrated projects within strict timeframes and budget constraints by solving complex problems and working closely with senior leaders.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Made decisions independently and collaboratively on plan changes -related challenges.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.

Laborer

A2MCarpet
Lake Worth, FL
01.2016 - 08.2020
  • Used measuring tools such as gauges and tape measure to identify conforming parts during production.
  • Maintained strong background in plumbing, carpentry, painting and plastering to assist with various construction projects.
  • Loaded, unloaded and moved material to and from storage and production areas.
  • Read and understood orders to accurately measure, cut and lay out needed materials.
  • Learned basic carpentry, painting and plastering.
  • Observed site safety rules to maximize protections for team members and equipment.
  • Updated logs and reported on job progress.
  • Utilized construction tools and machinery to effectively complete job site projects.
  • Performed general housekeeping and cleaning tasks.
  • Managed loading and unloading of routine shipments, maintaining organized and secure materials to minimize damage.
  • Recognized and reported potential project challenges and assisted with solutions.
  • Removed imperfections and applied chemical solutions to treat materials and achieve smooth finishes.
  • Maintained and repaired facilities, equipment and tools.
  • Reviewed blueprints and job specifications to plan completion and estimate project costs.
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
  • Prepared job sites by removing debris and setting up materials and tools.
  • Collected measurements and marked locations as part of project preparations.
  • Erected and removed temporary structures such as trench liners and scaffolding to meet team needs.
  • Constructed and broke down temporary retaining walls and scaffolding to support project needs.
  • Operated power equipment to move materials and promote job efficiency.
  • Worked alongside team to accomplish work goals according to schedule.
  • Monitored machines during operation to detect sounds of malfunction or excessive vibration and adjusted machines to eliminate problems.
  • Measured dimensions of finished pieces for conformance to specifications.

Education

Associate of Arts - Mechanical Engineering

Palm Beach State College
Lake Worth, FL
08.2018 - Current

Skills

    Advanced problem solving

undefined

Timeline

Project Manager

Hart Homes
02.2021 - 07.2022

Associate of Arts - Mechanical Engineering

Palm Beach State College
08.2018 - Current

Laborer

A2MCarpet
01.2016 - 08.2020
Andres Vera-moreno Project Manager