Summary
Overview
Work History
Education
Skills
Certification
Instrumentsused
Prcregistrationnumber
References
Personal Information
Timeline
Generic
Andrew Gallardo

Andrew Gallardo

Beaumont,CA

Summary

Internationally experienced Geodetic engineer, expert in land surveying, with a strong background in leadership and management. Aims to pursue a career that will utilize skills and provide personal enhancement, providing high-level output and advancement for the company.

Overview

30
30
years of professional experience
1
1
Certification

Work History

Caregiver

AJSC Care LLC Caregiver to Go / Granny’s Care Inc.
2019.12 - 2024.08
  • Assisted clients with activities of daily living, promoting independence and quality of life.
  • Cleaned house, ran errands, managed laundry, and completed weekly grocery shopping.
  • Assisted with dressing guidance, grooming, meal preparation, and medication reminders.
  • Performed light housekeeping duties to maintain cleanliness standards while respecting the patient''s personal space.

Surveyor

Makati Development Corporation
2016.12 - 2019.09
  • Establishment of the property boundary using survey instruments before the start of the construction based from relocation survey
  • Establishment of horizontal and vertical control points within the project area
  • Establishment of construction grid lines for Vertical projects
  • Layout of the building footprint for Vertical Project
  • Perform survey computation, both manual and computerized
  • Conduct as built, settings and other layout survey; Lot monumenting for subdivisions
  • Perform other related tasks that may be assigned from time to time
  • Ensure the implementation of the quality plans and objectives of the project
  • Perform tasks in accordance with the processes defined in the company's standards
  • Performs other related tasks that may be assigned from time to time

Chief Surveyor

South Energyx Nigeria Limited
2012.10 - 2016.07
  • Establish and marks survey control stations, determine the precise location
  • Prepare and proposes survey designs and recommends new designs if revisions are necessary
  • Organize and confirms the daily routine of surveying work schedule
  • Operates survey instrument and devices
  • Train and evaluates the newly hired surveyor
  • Supervise the preparation and compilation of all data and documents
  • Records all measurements and other information obtained during survey activities
  • Lead Survey crew in conducting survey activities

Chief Surveyor

First Continental Properties Limited
2011.01 - 2012.08
  • Prepare and supervise the preparation and compilation of all data and documents related to survey activities
  • Records all the data collected during survey activities
  • Lead Survey team in conducting survey activities
  • Downloads data from total station to computer
  • Establish and marks survey control stations, determine the precise location
  • Monitor and corrects the survey conducted by the contractor
  • Prepare and proposes survey designs and recommends new plans as necessary
  • Organize and confirms the daily routine of surveying work schedule
  • Operates survey instrument and devices
  • Train and evaluates the newly hired surveyor

Land Surveyor

Engineering Office, Diwan Dubai SH. D/H (Engineers)
2007.07 - 2010.11
  • Topographic surveys
  • Lay-outs all outgoing projects
  • Checks for final measurements of hand-over projects
  • Transfers all topographic and built-works in AutoCad
  • Survey and layouts landscaping projects
  • Check and outlines all points using GPS machines

Land Surveyor

Al Habtoor -Leighton Group
2004.10 - 2007.07
  • Responsible of structural works
  • Handle architectural works
  • Supervises finished works

Land Surveyor

Samsung Engineering & Construction Co. Ltd.
2001.01 - 2004.01
  • Establishes True Bench Mark (TBM) and principal coordinates for carrying out all survey works
  • Set out and checks exact location of pile, and required elevation
  • Do underground piping, electrical conduits, manhole, catch basin, catch pit and tank
  • Sets final pavement concrete level
  • Computes coordinates and elevation with reference to the design of the approved drawing

Land Surveyor

Bina Soon Jianyan SDN,BHD
1999.01 - 2001.01
  • Layout of proper location of buildings column/post as per plan
  • Checking the alignment and elevation as per required tolerance
  • Vertical checking of the building inside and outside as per required tolerance
  • Setting out road center line, box culverts, tennis court and parking area
  • Make layout boundary line/property line of the project
  • Final Pegging of right of way at Federal Highway Shah Alam Kuala Lumpur
  • Marine survey of piles by triangulation

Land Surveyor

M.C. Balce Surveying Services
1997.01 - 1999.01
  • Research engineering information between various drawing used in carrying out survey works
  • Performs mathematical computations for carrying out survey works
  • Traverse computation in accordance with approved work procedures and instructions ensuring that field data is recorded correctly on the approved forms and that the necessary checks, reductions and calculations are performed

Cadet Engineer

Department of Engineering and Public Works
1995.01 - 1997.01
  • In charge of inspection of all municipal projects
  • Responsible for weekly and monthly accomplishment report on the status and development of every project submitted to the District Engineer
  • Inspects all construction materials delivered if conform to the specifications
  • Make sure that the approved plans and specification of implemented projects are strictly followed
  • Conducts monitoring and evaluates projects and re-estimates and prepare materials take-off for every project

Education

BACHELOR OF SCIENCE - CIVIL ENGINEERING

ADAMSON UNIVERSITY
Manila
01.1992

BACHELOR OF SCIENCE - ARCHITECTURE

FAR EASTERN UNIVERSITY
Manila
01.1988

Skills

  • Excellent interpersonal relationship
  • Flexible
  • Consistent
  • Good decision making
  • Efficient
  • Hardworking
  • Computer literate
  • Knowledgeable in AutoCad
  • Good experience in using Internet applications
  • Excellent in writing and speaking Filipino
  • Proficient in writing and speaking English
  • Electronic Total Station (PENTAX)
  • PCS-335, Electronic Total Station (LEICA) TC-60/800
  • Electronic Total Station (TOPCON)-GTS 201
  • Theodolite 9SOKKIA DT 5A TOPCON
  • Dumpy Level (PENTAX) AL240
  • NIKON DTM-502 Series Total Station
  • GPS Sokia
  • Leica

Certification

I, the undersigned, certify to the best of my knowledge and belief, that the information in this resume are true and correctly describes my qualifications, my experiences and myself. I understand that any willful misstatement described herein may lead to my disqualification or dismissal if employed.

Instrumentsused

  • Electronic Total Station (PENTAX)
  • PCS-335, Electronic Total Station (LEICA) TC-60/800: Leica Level NA2/NAK2
  • Electronic Total Station (TOPCON)-GTS 201, CTS2; GTS203; GTS 20D; GTS213
  • Theodolite 9SOKKIA DT 5A TOPCON
  • Dumpy Level (PENTAX) AL240, NIKON DTM-502 Series Total Station
  • GPS Sokia and Leica

Prcregistrationnumber

0004992

References

Available upon request.

Personal Information

Citizenship: Filipino

Timeline

Caregiver

AJSC Care LLC Caregiver to Go / Granny’s Care Inc.
2019.12 - 2024.08

Surveyor

Makati Development Corporation
2016.12 - 2019.09

Chief Surveyor

South Energyx Nigeria Limited
2012.10 - 2016.07

Chief Surveyor

First Continental Properties Limited
2011.01 - 2012.08

Land Surveyor

Engineering Office, Diwan Dubai SH. D/H (Engineers)
2007.07 - 2010.11

Land Surveyor

Al Habtoor -Leighton Group
2004.10 - 2007.07

Land Surveyor

Samsung Engineering & Construction Co. Ltd.
2001.01 - 2004.01

Land Surveyor

Bina Soon Jianyan SDN,BHD
1999.01 - 2001.01

Land Surveyor

M.C. Balce Surveying Services
1997.01 - 1999.01

Cadet Engineer

Department of Engineering and Public Works
1995.01 - 1997.01

BACHELOR OF SCIENCE - CIVIL ENGINEERING

ADAMSON UNIVERSITY

BACHELOR OF SCIENCE - ARCHITECTURE

FAR EASTERN UNIVERSITY
Andrew Gallardo