Summary
Overview
Work History
Education
Skills
Education and Training
Languages
Timeline
Generic

Andrew George Benitez

Coral Springs,FL

Summary

Professional construction manager equipped to oversee projects from start to finish. Strong focus on team collaboration and achieving results, adapting seamlessly to changing needs. Skilled in project coordination, site safety, and resource management, ensuring timely and quality completion of tasks. Known for reliability, effective communication, and leadership in dynamic construction environments.

Overview

9
9
years of professional experience

Work History

Superintendent

M.J Simpson
05.2025 - Current
  • Managed project timelines and resource allocation for multiple construction initiatives.
  • Coordinated with subcontractors to maintain quality control and timely project completion.
  • Fostered strong communication between teams, promoting collaboration and problem-solving.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.

Assistant Construction Superintendent

Alonso and Associates
01.2023 - Current
  • Scheduled staff and subcontractors to maintain adequate coverage and complete jobs on time.
  • Conducted walk-throughs with clients to identify rework needs and answer client questions.
  • Defined project deliverables and monitored status of tasks.
  • Maintained logs of on-site operations and reported findings to supervisors.
  • Scheduled preventative maintenance and repairs on heavy machinery and equipment.
  • Kept work areas organized and clean.
  • Coordinated delivery schedules with vendors and suppliers.
  • Hired and delegated tasks to subcontractors to complete projects faster

Supervisor

Promar
01.2024 - 05.2025
  • Supervised daily operations, ensuring adherence to safety protocols and company standards.
  • Trained and mentored team members, enhancing skill sets and performance levels.
  • Streamlined workflow processes, leading to improved efficiency in task completion.
  • Resolved operational issues promptly, minimizing disruptions to productivity.
  • Implemented inventory management practices, optimizing stock levels and reducing waste.
  • Coordinated scheduling and resource allocation, enhancing team effectiveness and morale.

Custom Cabinet Maker

All Custom Wood Cabinetry
01.2017 - 01.2023
  • Finished cabinets by sanding, staining and installing.
  • Measured cabinet spaces and designed detailed layouts.
  • Operated sanders and laminating machines to adhere wood laminate to surfaces.
  • Adhered to production deadlines and reported delays to supervisors.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Assisted with installation of base, trim and crown moldings to achieve desired looks and quality of construction.
  • Fit cabinets and countertops within installation space with exceptional accuracy and attention to detail.
  • Operated boring machines to bore holes for insertion of screws and dowels.
  • Observed strict deadlines and adjusted plans according to changes in production schedules to maintain targets.
  • Studied blueprints and specifications to identify size and shape of patterns and implement required machine setups.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Maintained clean and organized workplace.
  • Inspected each product upon completion to evaluate overall quality, assign grades and remove unacceptable products.

Education

GED -

Marjory Stoneman Douglas High School
Parkland, FL
05.2012

Skills

  • Permit processing
  • Scheduling and oversight of subcontractors
  • Site safety coordinator
  • Effective documentation and reporting
  • Effective communication
  • Construction equipment
  • Construction project oversight
  • Safe job site set-up
  • Blueprint interpretation
  • Construction supervision
  • Relationship building

Education and Training

other

Languages

Spanish
Limited Working

Timeline

Superintendent

M.J Simpson
05.2025 - Current

Supervisor

Promar
01.2024 - 05.2025

Assistant Construction Superintendent

Alonso and Associates
01.2023 - Current

Custom Cabinet Maker

All Custom Wood Cabinetry
01.2017 - 01.2023

GED -

Marjory Stoneman Douglas High School
Andrew George Benitez