Goal-driven, dedicated to providing high-quality construction services to discerning clients. Offering first-rate construction management and field supervision expertise. Skillful in working with architects, inspectors, designers and subcontractors to accomplish high-quality project work.
Overview
15
15
years of professional experience
Work History
Sub Contractor
Batton Builds
02.2021 - Current
Pulled wire through conduits and through holes in walls and floors.
Organized materials and tools in to maintain clean and neat work areas.
Tested electrical systems and continuity of circuits in electrical wiring, equipment and fixtures using various testing devices.
Removed old sinks, toilets and pipes in preparation for installation of new fixtures.
Unclogged sinks and toilets for customers using tools and drain cleaners.
Filled plumbing fixtures and pipes with water or air to detect and locate leaks.
Installed hardwood, laminate and vinyl flooring for multiple residential and commercial clients.
Installed drywall for residential and commercial projects with consistent attention to quality and safety.
Sub Contractor
Duke Randall Country Side Restorations
01.2015 - 01.2021
Installed hardwood, laminate and vinyl flooring for multiple residential and commercial clients.
Utilized saws, nail guns and routers to safely complete flooring installation projects.
Swept, scraped, and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
Recorded respective measurements for each project.
Understood and used proper tools and equipment to install and maintain electrical systems.
Removed and replaced damaged drywall to complete repair and restoration projects.
Measured and marked cutting lines on drywall for lengths, heights and penetrations.
Removed old sinks, toilets and pipes in preparation for installation of new fixtures.
Unclogged sinks and toilets for customers using tools and drain cleaners.
Drilled and cut holes in walls and floors to accommodate passage of pipes.
Organized and moved materials from truck to job site to support project requirements.
Followed safety practices with tools and general behaviors to prevent accidents and safeguard equipment.
Prepared for new painting by removing previous materials with seam-cleaning, sandblasting, scraping, and sanding.
Installed lighting fixtures to improve lighting and increase energy efficiency.
Re-caulked and sealed windows doors and siding to prevent drafts and air leaks and minimize energy costs.
Installed cabinets and shelving units in homes and offices to provide additional space and organization.
Floor Installer
Interior Logic
01.2009 - 09.2014
Swept, scraped, and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
Removed existing flooring to prepare carpet, laminate and vinal floor surfaces for new flooring.
Maintained excellent communication, cleanliness, and safety standards on work sites and projects, boosting customer satisfaction ratings.
Spread adhesive cement over floor to prevent board joint wearing.
Stripped and refinished hard surface floors to maintain quality condition and appearance.
Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.
Cut and trimmed flooring to fit around obstacles and within tight spaces.
Utilized saws, nail guns and routers to safely complete flooring installation projects.
Installed floor coverings and edgings, using thresholds and carpet bindings to complete finish work.
Measured, cut, and installed tack-free strips along baseboards or walls.
Supplied accurate measurements and estimates for projects.
Worked with different adhesives to join foundation, flooring and wall materials.
Interim Project Manager / Field Technician – Structural Assemblies at Black Diamond Builds & RenovationsInterim Project Manager / Field Technician – Structural Assemblies at Black Diamond Builds & Renovations