Summary
Overview
Work History
Education
Skills
Timeline
Generic

Andrew Beard

Anderson,IN

Summary

Innovative technology professional with several years of diverse experience. Skilled in enhancing systems and aligning technical solutions with business objectives. Proven success in leading projects from start to finish and contributing to organizational growth and success.

Overview

8
8
years of professional experience

Work History

Installation Supervisor

PTS Automation
03.2021 - 09.2025
  • Supervised the installation team installing Safety systems on industrial machines. Systems included PlC, HMI's , and safety rated devices. Light curtains, area scanners, locking and non locking door switches etc.
  • Fabricated and installed custom made machine guarding.
  • Supervised installation teams, ensuring compliance with safety protocols and project specifications.
  • Coordinated equipment assembly and testing, streamlining operational workflows for efficiency.
  • Trained staff on installation procedures, fostering a culture of continuous improvement and skill development.
  • Conducted quality assurance inspections to maintain high standards in installation projects.
  • Collaborated with engineering teams to resolve technical issues during installations, minimizing delays.
  • Managed inventory of tools and materials, optimizing resources for project readiness and cost-effectiveness.
  • Conducted surveys of installation locations and noted any issues.
  • Resolved client concerns quickly and professionally, resulting in repeat business and referrals from satisfied customers.
  • Reduced installation errors by conducting thorough site assessments prior to beginning projects.
  • Managed a team of technicians, providing guidance, support, and ongoing training to ensure their success.
  • Ensured safety compliance on all job sites, conducting regular inspections and addressing potential hazards promptly.
  • Utilized problem-solving skills proactively when faced with unforeseen challenges during installations.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Diagnosed and resolved technical issues related to PLC systems, ensuring minimal downtime.

Installation Technician Team Lead

PTS Automation
05.2019 - 03.2021
  • Installed automation systems according to technical specifications and design requirements.
  • Conducted troubleshooting and maintenance on various automated equipment.
  • Collaborated with engineering teams to optimize installation processes and improve efficiency.
  • Trained junior technicians on best practices for system installation and safety protocols.
  • Ensured compliance with industry regulations during installation procedures and site inspections.
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Actively participated in team meetings, contributing valuable input toward process improvements and increased productivity.
  • Diagnosed and troubleshot system faults, identifying equipment issues and resolutions.
  • Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Reduced service callbacks by ensuring accurate installations and proper equipment testing.

Installer

PTS Automation
08.2017 - 05.2019
  • Safety System integrator
  • Operated tools, equipment, and machinery according to safety standards.
  • Enhanced customer satisfaction by providing timely and accurate installations.
  • Collaborated with team members to ensure smooth workflow and successful project completion.
  • Maintained a safe work environment by strictly adhering to safety protocols and guidelines.
  • Completed troubleshooting of malfunctions and diagnosed issues.

Education

High School Diploma -

Anderson High School
Anderson, IN
05.2000

Skills

  • Schedule management
  • Customer service
  • Workload prioritization
  • Health and safety
  • Documentation control
  • Network configuration
  • Hardware installation
  • Field operations
  • Blueprint reading
  • MS office
  • Crew management
  • Equipment installation
  • Mechanical aptitude
  • Electrical
  • Teamwork and collaboration
  • Problem-solving abilities
  • Multitasking
  • Dependable and consistent
  • Task delegation

Timeline

Installation Supervisor

PTS Automation
03.2021 - 09.2025

Installation Technician Team Lead

PTS Automation
05.2019 - 03.2021

Installer

PTS Automation
08.2017 - 05.2019

High School Diploma -

Anderson High School