Summary
Overview
Work History
Education
Skills
Timeline
Generic

Andy Wilson

Canton,GA

Summary

Adaptable Project Superintendent knowledgeable in construction protocols and standards. Offering more than 8 years of supervising subcontractors and 18 years in the industry. Ensuring projects are completed within budget, on time and safely is of the utmost importance. Considered a top notch professional with exceptional composure. Instrumental in maintaining safe and practical installation of HVAC and Plumbing systems. Improving means and methods has been of the most important attributes of being a supervisor. Consistently achieved top 10% in performance metrics in years of supervising as a foreman and superintendent.

Overview

12
12
years of professional experience

Work History

Project Superintendant

McKenney's Inc.
07.2020 - 06.2024

Responsible for managing the installation of mechanical piping systems, sanitary and storm waste, domestic water distribution, medical gas systems and sheet metal/air duct systems with contract values ranging between $15-25 million.

  • Oversaw selection, procurement and allocation of building materials and equipment.
  • Compiled daily field report, detailing all key activities and outlining project progress for stakeholders
  • Managed General Foreman from multiple trades (Plumbing, Pipefitting and Sheet Metal) to ensure job duties and schedule expectations were being met
  • Coordinated power equipment use, training and maintenance to create safe working environment, limit accidents, and prevent damages.
  • Developed detailed project scopes, schedules, budgets, and performance metrics to guide successful completion of assigned projects.
  • Conducted walk-throughs with clients prior to project close, completing punchlists and answering all questions.
  • Managed sub-contractors (controls, concrete cutting, insulators) and ensured they followed schedule expectations, safety procedures and daily activity reporting
  • Attended weekly sub-coordination meetings with the GC and drove the installation sequence of all other subs on the project
  • Drove system-design standards and changes to ensure the best product was being installed for the end-user.
  • Maintained specification and code compliance by staying on top of change orders, spec update, building code requirements and customer/end-user requests



- Accepted additional positions mentoring and training upcoming foreman and superintendents.

  • Instructed classes which developed young and talented workers into stronger leaders
  • Managed a team of General Foreman which met weekly to help improve leadership qualities through mentorship and guidance

General Foreman

McKenneys
04.2018 - 06.2020

Responsible for the installation of mechanical piping systems.

  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Prepared daily/weekly work plans for all crews on-site
  • Attended weekly sub-coordination meetings with the General Contractor and other subcontractors.
  • Responsible for managing payroll for all crews.
  • Participated in weekly 3 Week and 12 Week Look-aheads in order to achieve and maintain rigorous schedules set forth by the GC and customer
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Managed start-up and commissioning and troubleshooting of HVAC and Process System equipment
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Completed final walkthrough at job sites to close out projects.

Projects completed:

  • CHOA Support 1 (Brookhaven, GA)
  • CHOA Support 2 (Brookhaven, GA)
  • Emory Musculoskeletal Institute (MSK) (Brookhaven, GA)
  • UGA Stem Research Laboratory (Athens, GA)

Crew Foreman

McKenney's Inc.
04.2016 - 03.2018

Responsible for the installation of mechanical piping systems

  • Lead Crew Foreman on hospital renovation projects such as emergency room expansions, mechanical room upgrades and the installation of MRI and CT scanners.

* These projects included but not limited to:

- Emory Midtown

- HCA Cartersville

- Wellstar Acworth

- Wellstar Avalon

- Southern Regional

- Wellstar Acworth

- Wellstar Kennesaw


  • Provided clear direction to crew members, setting goals, expectations, and performance benchmarks for each project phase.
  • Planned sequence of construction activities with all other trades
  • Managed payroll for crew members
  • Managed fabrication deliveries, material/parts procurement and drawing review/QC

Journeyman Pipefitter

McKenneys Inc
08.2014 - 03.2016

Responsible for the installation of mechanical piping systems

  • Lead welder/installer for the central utility plant at Baxter Pharmaceuticals.
  • Fabricated, assembled, installed and maintained piping systems.
  • Lead a small crew during the installation of high pressure steam, process-water systems and Heating Hot Water/Chilled Water systems
  • Lead welder/installer for the main Chilled Water system at Truist Park/Braves Stadium
  • Responsible for reporting daily activities, pretask plans and material management

Journeyman Pipefitter

RH Lapp
01.2012 - 03.2014

Responsible for the installation of mechanical piping system.

  • Fabricated, assembled, installed and maintained piping systems.
  • Completed complex projects on time through efficient time management and prioritization of tasks.
  • Mentored apprentices and lead a small crew during the renovation of several public school buildings.

Education

HVAC, Welding And Plumbing

Local 486 Apprenticeship Program
Baltimore, MD
05.2011

Bachelor of Science - Exercise Physiology

Frostburg State University
Frostburg, MD
05.2004

High School Diploma -

Allegany High Schooll
Cumberland, MD
06.2000

Skills

  • Subcontractor supervision
  • Construction supervision
  • Site Inspections
  • Effective written and verbal communication
  • Deadline Management
  • Budgetary controls
  • Project scope understanding
  • Material Procurement
  • Hand and power tools
  • Project safety
  • OSHA trained
  • Safety Procedures
  • Technical knowledge
  • Quality Control
  • Change order management
  • Blueprint Interpretation
  • Budget Control
  • Cost Estimation
  • Cost Control
  • Building Codes
  • Value Engineering
  • Crew safety meetings
  • Construction protocols and standards
  • Scope Definition
  • Documentation Management
  • OSHA Compliance
  • Inspection Coordination
  • Safety Compliance
  • Job Planning
  • Plan Modifications and Takeoffs
  • Knowledgeable in construction safety
  • Equipment Operation
  • Cost Tracking

Timeline

Project Superintendant

McKenney's Inc.
07.2020 - 06.2024

General Foreman

McKenneys
04.2018 - 06.2020

Crew Foreman

McKenney's Inc.
04.2016 - 03.2018

Journeyman Pipefitter

McKenneys Inc
08.2014 - 03.2016

Journeyman Pipefitter

RH Lapp
01.2012 - 03.2014

HVAC, Welding And Plumbing

Local 486 Apprenticeship Program

Bachelor of Science - Exercise Physiology

Frostburg State University

High School Diploma -

Allegany High Schooll
Andy Wilson