Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
Followed protocols and stayed organized to provide personal and teammate safety.
Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
Safely operated electric cordless and hammer drills and cutting torches.
Inspected buildings to identify repair needs.
Managed inventory of tools, supplies and equipment.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Repaired damaged doors, windows and other structures.
Increased workplace safety, conducted regular tool and equipment maintenance checks to prevent accidents.
Reduced material waste and costs by accurately measuring, cutting, and assembling building materials.
Collaborated with other construction workers to coordinate projects and streamline process.
Increased safety on job sites by diligently following industry best practices and OSHA guidelines during all carpentry tasks.
Inspected job sites to identify potential hazards and establish protection and safety standards.
Planned and executed work with proper tools and materials to maximize productivity.
Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
Dura Arts
Carpinter
11.2020 - 08.2024
Job overview
Operated forklifts and other heavy equipment.
Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
Followed protocols and stayed organized to provide personal and teammate safety.
Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
Safely operated electric cordless and hammer drills and cutting torches.
Inspected buildings to identify repair needs.
Managed inventory of tools, supplies and equipment.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Repaired damaged doors, windows and other structures.
Increased workplace safety, conducted regular tool and equipment maintenance checks to prevent accidents.
Reduced material waste and costs by accurately measuring, cutting, and assembling building materials.
Collaborated with other construction workers to coordinate projects and streamline process.
Increased safety on job sites by diligently following industry best practices and OSHA guidelines during all carpentry tasks.
Inspected job sites to identify potential hazards and establish protection and safety standards.
Planned and executed work with proper tools and materials to maximize productivity.
Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
Clark Pacific
Cement Mason
11.1997 - 11.2003
Job overview
Identified correct materials for surface finish such as power trowel or abrasive stone.
Applied contraction, construction, or isolation joints in appropriate areas and situations.
Repaired damaged items using different chemicals and tools.
Mixed cement for standard, volumetric, or pervious concrete.
Inspected concrete structures for complete fills, defects, or damage.
Monitored inventory of key tools and materials used at each project site to provide consistent availability.
Adhered to safety and reporting procedures.
Applied sealers or waterproofing to concrete as required by project.
Installed forms for shaping, insulating, or creating decorative effects in concrete.
Measured and marked areas for deploying concrete.
Troweled and finished concrete to create textured or decorative surfaces.
Handled repairs on concrete finishing equipment, keeping tools operational.
Prepared and placed concrete to create sidewalks, driveways, or patios.
Cut, chipped, or sawed concrete to create desired shapes.
Completed physically demanding tasks such as lifting up to Number pounds to move job materials.
Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
Routinely lifted and moved items weighing up to Number pounds.
Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
Measured precise amounts of concrete and verified levelness to improve quality of finished product.
Created specific finishes on poured concrete.
Wore correct clothing and protective equipment for jobs.
Mixed, spread, and patched concrete to specifications.
Shoveled materials such as dirt, gravel, and asphalt.
Demolished and repaired old concrete surfaces.
Maintained clean, safe worksite for team safety and to help keep projects on-track.
Set wood and other forming materials to prepare for concrete pours.
Operated equipment such as forklifts safely to efficiently complete site work.
Streamlined workflow processes by proactively identifying bottlenecks within the project timeline, leading to improved overall efficiency.
Constructed concrete beams, columns and panels.
Assisted truck operator by positioning discharge chute of truck or pump to direct concrete into correct areas.
Prepared surfaces with sponge-rubber float or burlap.
Filled roadways, driveways, sidewalks, bridges, homes and parking lots to meet project plan specifications.
Maximized durability of structures through the use of high-quality materials and proper curing procedures for optimal strength.
Inspected detail work for adequacy and spread concrete into corners and small areas of forms using hand tools.
Reduced material waste by utilizing precise measurements for mixing and applying cement.
Contributed to project success by coordinating with other construction professionals, such as architects and engineers, to ensure accurate execution of plans.
Completed Number jobs with quality and efficiency, resulting in excellent client feedback.
Inspected areas to address inconsistencies and patched holes with fresh concrete or epoxy compound.