Dynamic Lead Process Engineer with extensive experience at Arion Blue LLC, excelling in process design and equipment sizing. Proven track record in API compliance and risk assessment, coupled with strong leadership and collaboration skills. Successfully executed complex projects, ensuring safety and efficiency in high-stakes environments.
PSV Revalidation Effort - Process Lead, Delegated assignments throughout Jr Engineering, and Field Data Collection teams in an effort to complete revalidation for over 1200 Client relief devices., Completed quality checks of collected field, and internal data., Completed Protected System identifications and quality checks., Generated field packages which defined all essential equipment/data needs to be gathered during Field Walkdown phase., Completed Safe Discharge (Dispersion) work in PHAST, as necessary., Provided weekly status reports to the Client detailing progress made, individual device status, expected completion dates, and man hour averages for individual task to be utilized as benchmarks for future estimates. Increase EDC Production By Direct Chlorination - Process Lead, Created Pro II simulation model to represent existing and ideal Process conditions with respect to an EDC production increase from 1450 to 2000 TPD., Completed device sizing, in HTRI, for 6 Air Cooled Heat Exchangers essential to the upgrade in production, to include all vendor correspondence in the early project (FEL1/FEL2) stages., Performed hydraulic calculations to determine any pipe sizing deficiencies associated with the desired production increase., Performed as a Process liaison for Civil, Electrical, and Mechanical disciplines to coordinate all updates needed in regards to the replacement of 6 Heat Exchangers., Provided project redline P&IDs to represent desired changes., Coordinated and led bi-weekly model reviews with Client., Provided +/- 20 Estimate for new equipment. Decontamination Study for Process & Fire Water Header - Process Engineer, Created PipeFLO model to represent current Process & Fire Water header conditions., Identified critical points in regards to low pressure readings in comparison to various Unit requirements., Completed sizing and selection documentation for Well Water pumps based on overall plant required usage rates., Proposed filter options for decontamination to eliminate build up., Completed a +/- 20% estimate for purchase and implementation of desired mitigation options. Vinyl Acetate / Ammonia Storage Low Temperature Exchanger Replacement - Process Engineer, Completed FEL 1-3 study, and +/- 20% estimate for the replacement of four Air Cooled Heat Exchangers in Client Low Temp Storage area., Utilized HTRI/HYSYS simulations to identify any potential bottlenecks associated with requested increase in design parameters., Completed sizing and selection documentation, and project P&ID redlines., Completed a +/- 20% estimate for purchase and implementation of desired mitigation options.