Adept Commercial Plumber with a proven track record at MacDonald-Miller Facility Solutions, showcasing expertise in plumbing code compliance and exceptional blueprint interpretation skills. Excelled in complex projects, including high-rise residential towers and commercial kitchens, by efficiently installing and roughing-in plumbing systems. Demonstrates strong problem-solving abilities and a commitment to quality outcomes.
1st project I installed trim for a finishe lab.
2nd project I Laid out and Installed waste, went and water systems for Lab. I did my first mechanical room on this job and various trim for fixtures at end of project.
3rd project I aided in finishing out rough-in for another lab.
I was on the Microsoft Project specifically Building N Commerical Kitchen. I laid out waste, vent, water systems. Installed waste vent, and water systems. Also trimed various fixtures.
1st project was a 9 story office space project. Laid out and rough-in waste, vent and domestic water for core bathrooms. Laid out and rough-in locker room bathroom in 1st level parking garage.
2nd project was a 5 story low income housing project. laid out entire lower belly for waste, vent, and domestic water. Installed main waste and vent on 1st floor. Rough-in waste vent and domestic water in units for project.
1st Project was a 40 story residential tower. I was on the deck periodically installing bangers and sleeves. Majority of my time was spent on waste and vent crew. laying out and roughing-in units and stacks all the up the tower.
2nd Project was office space where i laid out and rough-in waste vent, and domestic water in core bathrooms.