Constructed and installed bridge components, ensuring structural integrity and compliance with safety standards.
Operated power tools and equipment, maintaining high levels of safety and efficiency on job sites.
Collaborated with team members to execute project plans, adapting to changing conditions as needed.
Assisted in the assembly of formwork for concrete placement, contributing to overall project timelines.
Inspected materials and workmanship for quality assurance, identifying issues before they escalated.
Provided training to new carpenters on safety protocols and best practices in bridge construction techniques.
Streamlined workflow processes, enhancing productivity and reducing downtime during construction phases.
Enhanced bridge safety by performing regular inspections and identifying potential hazards.
Consistently met deadlines by prioritizing tasks effectively and working efficiently under pressure.
Implemented proper traffic control measures to maintain safety during construction and repair operations.
Ensured timely completion of projects by coordinating with team members and managing work schedules efficiently.
Improved overall structural integrity by repairing damaged bridge components in a thorough manner.
Increased project efficiency by maintaining organization and cleanliness of job sites.
Constructed durable bridge frameworks using various materials, such as timber, steel, and concrete.
Type 2 and substructure repairs
Form new bridge decks
Form diaphragm
Form beam seats / set beams
Form footers
Form abutment / pier / wing walls
Form parapet walls
Form pilasters
Install dam / dam seals / slider plates
Install overhang jacks / deck overhang
EFCO installation
Simon panel / wood form assembly
Build overhang safety railing
Read blueprints / layout
Drive sheet piling
Drive H-pile
Construct cofferdams
Tie steel
Bridge Foreman/Carpenter
D.a Collins Construction
Allentown, PA
02.2018 - 09.2022
Supervised bridge construction projects, ensuring adherence to safety protocols and quality standards.
Coordinated workforce schedules to optimize productivity and resource allocation on-site.
Collaborated with project managers to develop detailed work plans aligned with project goals.
Monitored compliance with environmental regulations during construction activities, promoting sustainable practices.
Streamlined construction processes for more efficient project completion, ensuring timely delivery of bridge projects.
Demonstrated flexibility in adapting to unforeseen circumstances such as weather or material delays while efficiently reallocating resources accordingly.
Ensured compliance with safety regulations, leading to a significant decrease in on-site accidents and injuries.
Developed detailed work schedules that improved workflow efficiency and reduced downtime on job sites.
Utilized advanced surveying techniques for accurate measurements during site preparation and layout stages of bridge projects.
Led regular progress meetings with team members ensuring alignment on objectives, deadlines, and expectations.
Oversaw subcontractor coordination efforts which contributed to seamless integration within overall project timelines.
Prepared and submitted reports on job progress and safety conditions to upper management.
Documented construction and extraction workers' hours, wages and other pertinent information.
Led team meetings to discuss project progress, addressing challenges proactively.
Read and interpreted blueprints to follow specifications of projects.
Increased safety on job sites by diligently following industry best practices and OSHA guidelines during all carpentry tasks.
Documented/logged production quantities with corresponding cost codes
Followed bridge demo plan in a safe manner
Sounded bridges for type 2 repairs.
Worked directly off of barges and directed slurry control operation over river / active railroad.
Performed daily equipment safety checks
Hammered out / formed type 2 repairs
Sawcut bridge decks
Removed / Formed / poured existing parapet walls,pilasters, and overhang sidewalks
Removed / Formed / poured bridge decks and structural arches.
Design and build slurry control system
Utilized man lifts to install overhang jacks / build overhang / install safety rails.