While working in construction I obtained my certification in forklift and aerial lift scissor lift etc. while working with multiple construction companies I've always had the opportunity to become a lead/Foreman of multiple projects with the ability to run my own crew and finish jobs ahead of time.
Overview
20
20
years of professional experience
Work History
Drywall Finisher
Daw Construction Group
Draper, UT
09.2019 - 09.2024
Applied tape to seal joints by embedding into sealing compound.
Served as a reliable team member, regularly collaborating with other finishers and construction professionals to achieve shared goals and meet deadlines.
Removed damaged drywall and wallpaper to prepare for new installations.
Measured and marked cutting lines on drywall for lengths, heights and penetrations.
Drywall Taper
Pete King Construction
Draper, UT
09.2019 - 09.2024
Contributed to team success through effective collaboration on large commercial projects involving multiple crews.
Cleaned up work areas upon completion of projects.
Reduced material waste by effectively utilizing tools to trim rough edges from drywall panels.
Maintained clean worksites by consistently removing debris and disposing of materials in accordance with regulations.
Drywall Foreman
Wasatch Drywall and Paint
Midvale, UT
05.2020 - 09.2021
Enhanced project efficiency by effectively managing drywall installation and repair tasks for commercial and residential projects.
Reduced material waste by implementing a strict inventory control system, resulting in cost savings for the company.
Collaborated closely with other trades professionals to ensure seamless integration of drywall systems within various construction projects.
Coordinated subcontractor schedules as necessary to minimize disruptions during ongoing installations or repair work in active facilities or homes.
Maintenance
Kier Property Management
Ogden, UT
10.2007 - 07.2010
Developed maintenance database, facilitating better tracking of repairs and maintenance history.
Reduced maintenance costs with the implementation of predictive maintenance strategies.
Optimized communication infrastructure with timely maintenance and upgrades.
Maintained maintenance request database to log job information.
Line Cook
Parker Areospace
Ogden, UT
03.2005 - 08.2006
Prepared multiple orders simultaneously during peak periods with high accuracy rate, maximizing customer satisfaction, and repeat business.
Collaborated with team members to maintain a clean and safe working environment, adhering to health and safety guidelines.
Set up and prepared cooking supplies and workstations during opening and closing to maximize productivity.
Adapted quickly to new recipes and techniques, demonstrating versatility and eagerness to learn from colleagues. Maintaining and cleaning equipment on a day-to-day basis. Breaking down equipment for deep cleaning reassembling equipment.