Skilled and knowledgeable superintendent offering record of over 30 years of experience and accomplishment on diverse construction projects. An efficient coordinator between teams, vendors and design professionals. Problem-solver to keep projects on time an on budget. Able to tackle problems head-on while maintaining standards.
Responsible for the supervision, coordination, and control of field construction activities. Mainly on site, directly in charge of field crews. Safety, scheduling, implementing construction methods, and overseeing the quality of work are some key duties. Coordinate subcontractor and all trades on the project. Works with the project staff to ensure labor, equipment, and supply concerns are fully addressed during construction.
Victoria Place (2021 - Present): General Foreman / SCT Supt.
- Foundations / SOG
- Parking suspended decks / walls / columns
- Anemity deck interior and exterior finishes
-Assist in Building turnover
Halekulani Hotel Renovation (2020-2021), WF
- Self-perform demo/form/pour/misc. finishing
2019 - 2020
King's Village Demo (Kahaku Project)
- Site fence erection.
- Field coordination of abatement crews, demo contractor, traffic control, truck hauling, and site excavation.
- Began transition into Superintendent position.
2018-2019
Entrepreneur's Sandbox
- Field coordination of :
- Pile drilling
- Forming / pouring (Self perform)
- Structural reinforcement / Structural steel
- MEP
- Framing / Drywall
- Glazing
- Wood finishes / Doors and hardware (Self perform)
WAIEA (Late 2016-2018)
- Responsible for the completion of hardscape, villas, water features, finishes, and assisting in turnover.
- Assist supts on other projects in supplying them manpower (island wide)
Four Seasons Ko Olina (2015-2016)
- Responsible for completion of concrete work on property, pools, chapel, numerous structures on site, landscape, and turnover
- Worked directly with developer on added work
DCK Pacific Construction (1990-2015)
International Market Place (GF)
- Foundation formwork
- Perry handset suspended deck
- Perry Truss Flyer
- Doka wall form
- Precast planking
- Coordinated with subcontractors and vendors
Queen's Medical Center West Oahu Renovation ($32.5 million), (GF)
Renovation of five hospital floors.
-ER, Imaging, patient care, nurses' stations, and Clinical Services Center
- Site work.
- Field coordination of subs, vendors, and owner
Kaiser Permanente Chiller Replacement ($2.1 million) (GF)
- Misc. Demo and concrete work.
- Field coordination of subs, vendors, and owner.
Kaiser Permanente Malama Ohana Med/Surg ($2.8 million), (GF)
- Renovation of existing long-term rooms into med/surg patient rooms.
- Field coordination of subs, vendors, and owner.
Kaiser Dole Optical Lab Relocation ($600) (GF)
- Misc. Demo, concrete work, and finishes.
- Field coordination of subs, vendors, and owner.
Bank of Hawaii Central Processing Facility Upgrade ($3.5 million) (GF)
- Construction upgrades to add redunancy to the building power and A.C. systems
Queen's Medical Library Renovation ($6.9 million), (GF)
- Turn-key, design-build renovation of the Hawaii Medical Library for relocation of QDC Corporate Offices, Financial, Legal, HR, etc., and development of the parking lot on Vineyard Boulevard.
- Self-perform concrete and finishes.
-Field coordination of subs, vendors, and owner.
The Queen's Medical Center Electrical System Upgrade ($26 million), (GF)
- Construction of a four-story cast-in-place concrete structure to house four 2.5 MW diesel generators, new 3-feeder services entrance/primary switchgear, and new paralleling gear.
- PeriForm system
-Aluminum shoring and deck system.
- Field coordination of subs, vendors, and owner
The Grand Waikikian ($203.5 million) (CF/GF)
Construction of a new 39-story concrete tower with 355 timeshare units.
- 6 levels of parking, extensive water features, and associated infrastructure.
-Self-climbing coreforms.
-A-Frame Flying Forms
- Pre-Cast double-story panels, cornices, column installation.
Marriott Ko'Olina Phase I & Ia ($74.6 million), (WF)
- Construction for a 14-story hotel/timeshare with a health club and recreational facilities.
- A-Frame flying forms.
-Atlas column forms.
- Coordinated erection of smaller structures on property.
- Hardscape
Marriott Waikiki Beach Club ($29.8 million), (JC)
- Renovation of guest rooms and public spaces of the former Hawaiian Regent Hotel, a 33-story hotel tower.
-Misc. formwork
-Millwork
-Misc. finishes
Federal Detention Center, Honolulu, HI ($63.0 million), (JC)
- Twelve-story, reinforced concrete facility with inmate cells.
- Administrative and support offices
- Maintenance building
- Form fabricator
- Installation of prison facility frames, doors, and hardware.
- Welded steel frames, special isolation enclosures, and stainless steel screens.
Neiman Marcus at Ala Moana Center ($24.2 million), (JC)
- Three-story structural steel building (160,000 sf) with exterior EFS system, Monier tile roof, and high-end interior finishes
- Installation of miscellaneous finishes.
One Archer Lane, Honolulu, HI ($53.7 million), (JC)
- 41-story condominium with a 5-level parking structure
-Truss flying forms.
- Self-climbing wall form.
-Installed appliances.
First Hawaiian Center, Honolulu, HI ($103.0 million), (JC)
- Twenty-seven-story structural steel tower (418,000 sf) with five levels of underground parking
-EFCO wallform.
- Door and hardware.
- Misc. finishes
Princeville Resort, Kauai ($25 million), (CA/WF)
- Hotel renovation.
- Restoration of hotel damaged by Hurricane Iniki.
- Involved renovation of 252 guest rooms, lobby, ballrooms, and meeting rooms
- Millwork, doors, and hardware.
Honolulu Police Headquarters, Honolulu, HI ($45.0 million)
- Six-story, 400,000 sf Spanish colonial building, headquarters for more than 800 police officers and administrative staff. (Carpenter Apprentice)
-Self-perform formwork.
- Self-perform finishing.
- Millwork, cabinetry, doors, and hardware.