- Conducted site walks to gather necessary measurements and document existing issues.
- Assembled necessary equipment, materials, and safety gear prior to site deployment.
- Performed scheduled maintenance checks on tools and equipment used on job sites.
- Assess the job site for the JSA and the work to be performed. be performed.
- Execute daily tasks, housekeeping, report project progress, site problems, and labor status to supervisors.
- Identified cost saving opportunities.
- AT&T New Site Build installing ground ring Ice Bridge concrete pads, Helicals, H Frames for CIENA, Meters, Generators with natural gas, power, and fiber.
April 2013 - April 2022
Civil Foreman, SAC Wireless, Chicago, IL. 60661 (312) 895-4977
- AT&T Fiber to Cell trenching as much as 2,500 ft running and connecting 4-inch PVC conduits, installing innerduct for fiber optic.
- T-Mobile L600/L700
- Sprint 2.5 installations.
- US Cellular is decommissioning shelters, concrete pads, meters, cabinets, batteries, FIF racks, and grip strut.
- AT&T MCA power plant swaps installing -48VDC/-58VDC power plants, battery cabinets, installing new and used batteries, DC-12, and Raycaps alarming grounding.
- T-Mobile Anchor site installing HPL3 Cabinets, BBU cabinet, GPS, Ice Bridge, H Frames, COVPS and grounding