Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Armando Saldana

Palmdale,CA

Summary

Responsible Pipefitter with excellent project oversight, team management and blueprint interpretation skills coupled with bilingual English and Spanish. Achieves project milestones and adheres to deadlines and quality standards.

OSHA 30 certified, So Cal Gas Blue Card along with many more certifications.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Gas And Liquid Technician

Waste Connections Inc.
Castaic, CA
11.2023 - Current
  • Maintained a safe work environment by strictly adhering to established safety protocols and guidelines.
  • Fuse pipe, install pneumatic pumps and Lorenz pumps.
  • Maintain landfill sumps and wells.
  • Operate heavy equipment example excavators, articulating truck, forklift, loaders and more.
  • Operating in trash fase.
  • Reading liquid levels and sumps.
  • Maintained tank farm, temperature reading and curing hazardous liquid.
  • Data entry

Foreman

Arizona Pipeline
01.2020 - 08.2022
  • Verified completed projects met approved time, quality and cost estimates.
  • Operated heavy equipment on daily basis.
  • Laid out materials for efficient project work.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Interpreted blueprints to determine locations, quantities and sizes of materials required.
  • Fused pipelines with live gas
  • Installation of steal and plastic pipes
  • Driver

Education

High School Diploma -

Sylmar Charter High School
Sylmar, CA

Skills

  • Pipefitter
  • Pipe fusion
  • Steal pipe
  • Plastic pipe
  • Blue print and specifications
  • Equipment operator

Certification

  • OSHA 30
  • So Cal Gas Blue Card -ID number given upon request
  • CPR verification
  • CFR 192.281 plastic pipe joining mechanical
  • joint/sidewall/heat
  • CFR 192.627 fussing pipelines under pressure
  • CFR 192.459 examine buried pipeline when exposed
  • CFR 192.614 standby and inspection of damaged pipeline
  • CFR 192.319 installation of plastic and steal pipe in ditch and bore
  • CFR 192.321 install tracer wire
  • CFR 192.327 maintaining minimum/backfill
  • Poly Socket saddle
  • Butt Fusion 2’-4’
  • Electrofusion
  • Poly Squeeze 2’-8’
  • Poly Squeeze 1/2 -1”
  • Tap PE Fitting
  • AB Set
  • D-4/D-5
  • E-4/E-5
  • H-17045 Completion Machine
  • No 1 stopping Machine

Timeline

Gas And Liquid Technician

Waste Connections Inc.
11.2023 - Current

Foreman

Arizona Pipeline
01.2020 - 08.2022

High School Diploma -

Sylmar Charter High School
Armando Saldana