Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic

Arnaldo Trujillo

Fort Myers,FL

Summary

Foreman commercial electrical work for more than 5 years. Fire Alarm field supervisor Golisano Children's Hospital of Southwest Florida.

Overview

9
9
years of professional experience
5
5
Certification

Work History

Facilities Manager of Fiddler's Creek

Fiddlers Creek Foundation
Fort Myers, FL
06.2020 - Current
  • Maintained optimal cost controls by mad negotiating lower prices.
  • Synthesized current business intelligence data to produce reports and polished presentations, highlighting findings and recommending changes.
  • Evaluated consistency and importance of different business intelligence data against needs to determine optimal courses of action.
  • Set, enforced, and optimized internal policies to maintain efficiency and responsiveness to demands.
  • Kept site work safe and in line with budget, schedule, and applicable building codes.
  • Implemented changes requested by designers, owners, or inspectors to conform to specifications or updated demands.
  • Supervised 6 employees and scheduled shifts
  • Provided guidance to management regarding project bids for onsite improvements
  • Assessed operating conditions and adjust settings to maximize performance and equipment longevity
  • Monitored employee work tasks while installing, aligning, and balancing new equipment for projects
  • Kept track of equipment, inventories, and system upgrades in order to prepare and present detailed reports to upper management
  • Tested systems to enhance power flow and safely install new system components, fixtures, and motors
  • Analyzed and identified equipment failure root causes and initiated correction actions
  • Observed guidelines, specifications, and detailed instructions to meet strict operational and maintenance regulations
  • Procured pricing information from various vendors to support cost-effective purchasing
  • Established and documented protocols for preventive maintenance procedures, decreasing equipment issues, and reducing downtime by0%
  • Implemented scheduled maintenance, retooling production status sheets, and driving tasks to achieve scheduling effectiveness
  • Overhauled, installed, and repaired centrifugal compressors, pumps, valves, separators, and generators
  • Increased productivity by reducing downtime, budgeting effectively, allocating tasks and maintaining high standards of safety and work quality
  • Reviewed and studied schematic diagrams to properly plan and process assignments
  • Developed and implemented employee incentive programs to promote top performance
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality
  • Rolled out improved training programs for maintenance employees
  • Monitored safety compliance to maintain strict standards and protect team members from harm
  • Optimized supply levels to keep stock within ideal parameters for expected needs
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults
  • Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity
  • Organized ongoing maintenance schedules to boost system performance
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members
  • Hired and trained new workers to improve efficiency of department and cultivate productive work atmosphere.
  • Contributed to development, implementation, and execution of maintenance programs
  • Monitored systems to assure increase in power flow and integrated new system components, fixtures, and motors
  • Kept watchful eye on equipment inventories, optimizing work readiness, and aligning supplies with specifications for each job
  • Participated in team-building activities to enhance working relationships
  • Exceeded goals through effective task prioritization and great work ethic
  • Offered friendly and efficient service to customers, handled challenging situations with ease
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity

Foreman

Gulf Coast Power and Light
Lehigh Acres
09.2013 - 06.2020
  • Plan, organize, and direct work of job crew employees daily.
  • Manage up to 20 employees and 4 foremen and leadmen
  • Discipline and counsel employees as needed, as well as motivate employees regularly. Maintain familiarity with plans, specifications, and job contract scope.
  • Establish good relationships with clients and obtain acceptance and approval of completed work.
  • Provide technical assistance, i.e., interpretation of drawings, recommending construction methods and equipment, etc., as required.
  • 0rder materials and request manpower as needed and monitor, track, and approve employee work time as necessary.
  • Installed, tested, and modified circuit breakers, controls, fuses, lights, and motors.
  • Interpreted drawings, wiring diagrams, flow charts, and written descriptions of project requirements
  • Worked with various types of cableways, conduits, and other electrical raceways.
  • Updated service record files on equipment drawings and history.
  • Recorded respective measurements for each project
  • Maintained and tested fire alarm systems.
  • Consistently updated knowledge of safety requirements and policies.
  • Planned motor starter and control installations using codes and specs.
  • Demonstrated expertise using cable reels, stripping tools, voltage detectors, crimping tools, and wire and cable cutters.
  • Measured devices, including analyzers, amp meters, and volt-ohm meters.
  • Maximized resource utilization and achieved production targets by managing day-to-day usage of department resources
  • Handled all issues with relative ease by implementing best practices and applying critical thinking skills to find thebest solutions
  • Interacted with employees to demonstrate high standards and mitigate issues effectively
  • Oversaw employee attendance records, handled payroll and ordered new materials for sites
  • Evaluated production schedules and orders to arrange required materials and plan staffing needs
  • Evaluated incoming materials for quality and amounts ordered
  • Communicated daily with vendors to keep project fully operational
  • Established clear priorities and production quality standards
  • Meticulously tracked all parts and equipment used on each job site
  • Verified completed projects met approved time, quality, and cost estimates
  • Maintained zero site accidents
  • Checked equipment to determine if maintenance was required
  • Arranged beneficial deals with suppliers for materials to stay within budget limitations
  • Set and revise production schedules to meet changing demands
  • Interviewed, hired, and trained new workers
  • Reworked positions and workflow based on individual abilities and production targets
  • Oversaw routine maintenance programs and scheduled service to keep equipment functioning at peak levels
  • Oversaw employee attendance records, handled payroll and ordered new materials for sites
  • Attended on-site meetings with subcontractors and clients
  • Meticulously tracked parts and equipment used on each job site
  • Maintained zero site accidents and lost workdays for 7 years
  • Verified completed projects met approved time, quality, and cost estimates
  • Set and revise production schedules to meet changing demands
  • Interviewed, hired, and trained new workers
  • Oversaw employee attendance records, handled payroll and ordered new materials for sites

Education

HVAC Course - Heating, Air Conditioning, And Refrigeration Installation And Repair

Fort Myers Institute of Technology
3800 Michigan Avenue, Fort Myers Fl
08.2012

ICE Electrical Apprenticeship Program - Electrical Equipment Installation And Repair

IEC South West Florida
Naples Fl
06.2004

Associate of Science - Electrical Engineer

Marta Abreu University
Santa Clara ,Cuba
07.1998

Skills

  • Proficient in Microsoft Office Suite (Excel, Word, PowerPoint)
  • Ability to use technology such as smartphones, tablets, computers, web-based applications, and building automation systems
  • Strong customer focus
  • Complex issues management
  • Quality assurance
  • Understanding of client business requirements
  • Excellent interpersonal skills
  • Previous technical support experience
  • Works well team environment
  • Strong working knowledge National Electrical Code (NEC) and/or Life Safety Code (NFPA)
  • Working knowledge of construction, electrical work, and systems
  • Strong working knowledge of fire alarm systems

Certification

  • FASA/BASA
  • OSHA 10 since 2015
  • CDL CLASS A since 2008
  • OPERATOR CERTIFICATION FOR ANY TYPE OF LIFT
  • CPO - Operator of Aquatics Facilities, pool and spa

Additional Information

  • 2020 to Now Facilities Manager of Fiddler's Creek
  • 2013 -2020 working for Gulf Coast Power and Light like Field Supervisor
  • 2010 to 2013 Foreman Pl Electrical Contractor LLC
  • 2008 to 2010 Field supervisor Sinai construction
  • 2008 Michael J Looney Electrical Contractors
  • 2007 to 2008 Foreman AFC Electric
  • 2005 to 2007 Foreman Daystar electrical contractors
  • 2004 to 2005 Electrician Tier Electric
  • 2003 to 2004 Apprentice electrician for Collier Electric

Timeline

Facilities Manager of Fiddler's Creek

Fiddlers Creek Foundation
06.2020 - Current

Foreman

Gulf Coast Power and Light
09.2013 - 06.2020

HVAC Course - Heating, Air Conditioning, And Refrigeration Installation And Repair

Fort Myers Institute of Technology

ICE Electrical Apprenticeship Program - Electrical Equipment Installation And Repair

IEC South West Florida

Associate of Science - Electrical Engineer

Marta Abreu University
Arnaldo Trujillo