A dedicated electrician with over 30 years experience in industrial electrical installations, repairs and maintenance. Commited to safety, quality and dedication to the job.
Overview
13
13
years of professional experience
Work History
Industrial Journeyman Electrician
Zachary Construction
09.2021 - 05.2024
Read blueprint and schematic drawings to determine work procedures
Installed, assemble, and terminated in MCC (Motor Control Center)
Routed and installed PVC in duct bank for MCC
Routed and installed rigid conduit for field motor control panels
Pulled and terminated all sizes of cable
Installed unistrut for hangers and cable tray.
Installed, maintained and repaired electrical wiring, controls and lighting systems.
Commercial Journeyman Electrician
Trio Electric
01.2019 - 11.2019
Read blueprint and schematic drawings to determine work procedures
Plan path and install EMT, MC cable, and unistrut for hangers
Install receptacles, switches, and lights
Pulled and terminate cable
Installed junction boxes and terminate wire that was routed to junction box.
Industrial Journeyman Electrician
PCL Construction
03.2018 - 12.2018
Read blueprint and schematic drawings to determine work procedures
Install unistrut for hangers and cable tray
Pulled and terminate cable
Terminated signal pair, 24 pair, shielded cable, etc.
Industrial Journeyman Electrician
Zachry Construction
11.2016 - 12.2017
Read blueprint and schematic drawings to determine work procedures
Installed, assemble, and terminated in MCC (Motor Control Center)
Routed and installed PVC in duct bank for MCC
Routed and installed rigid conduit for field motor control panels
Pulled and terminated all sizes of cable
Installed unistrut for hangers and cable tray.
Industrial Journeyman Electrician
Rabalais Electric
12.2015 - 10.2016
Read blueprint and schematic drawings to determine work procedures
Installed rigid and pulled cable in it
Installed and terminate receptacles, switches, and lights
Pulled and terminate cable for field motor control panels.
Industrial Journeyman Electrician
Coonrod Electric
04.2014 - 11.2015
Read blueprint and schematic drawings to determine work procedures
Installed, assemble, and terminated in MCC (Motor Control Center)
Routed and installed PVC in duct bank for MCC
Routed and installed rigid conduit for field motor control panels
Pulled and terminated all sizes of cable
Installed unistrut for hangers and cable tray.
Industrial Journeyman Electrician
MMR Constructors
12.2013 - 04.2014
Read blueprint and schematic drawings to determine work procedures
Installed and terminate receptacles, switches, and lights
Pulled and terminated all sizes of cable
Installed unistrut for hangers and cable tray.
Industrial Journeyman Electrician
Bay Ltd.
02.2012 - 09.2012
Read blueprint and schematic drawings to determine work procedures
Installed unistrut with Ramset for cable tray on Skids
Pulled ground cable and cadweld where needed.
Industrial Journeyman Electrician
Zachry Construction
03.2011 - 01.2012
Read blueprint and schematic drawings to determine work procedures
Installed Solar Panels And connect them together
Pulled cable.
Education
GED -
Brownsville High School
Brownsville, TX
Skills
6 yrs Experience as a Foreman
4 yrs Experience as a Leadsman
Read Blueprints, Schematic, Drawings and Wiring Diagrams
Install conduits such as EMT, Rigid, Aluminum, Robroy, and PVC
Install Unistrut for Hangers and Cable Tray
Pull and Terminate all Kinds and Sizes of Cable
Install, Maintain, and Repairing Electrical Systems such as Switch Gears, Motor Controls, Electrical Panels, CT Cabinets, Conveyor Systems, Lighting, Switches and Power Supplies
Test and Troubleshoot with Ohmmeter and Voltage Meter all Electrical Systems or Continuity of Circuits in Electrical Wiring, Components, Transformers, Motors, Panels, Fixtures and Equipment to ensure the safety of the system
Personal Information
Title: Journeyman Electrician
Languages
Spanish
Limited Working
Timeline
Industrial Journeyman Electrician
Zachary Construction
09.2021 - 05.2024
Commercial Journeyman Electrician
Trio Electric
01.2019 - 11.2019
Industrial Journeyman Electrician
PCL Construction
03.2018 - 12.2018
Industrial Journeyman Electrician
Zachry Construction
11.2016 - 12.2017
Industrial Journeyman Electrician
Rabalais Electric
12.2015 - 10.2016
Industrial Journeyman Electrician
Coonrod Electric
04.2014 - 11.2015
Industrial Journeyman Electrician
MMR Constructors
12.2013 - 04.2014
Industrial Journeyman Electrician
Bay Ltd.
02.2012 - 09.2012
Industrial Journeyman Electrician
Zachry Construction
03.2011 - 01.2012
GED -
Brownsville High School
Similar Profiles