Determined to leverage knowledge in engineering principles and concepts. Skilled in implementing manufacturing processes, developing production systems and analyzing product designs. Intelligent and dedicated to cost savings initiatives and process improvements.
High performance professional with extensive experience in the automotive industry. Skilled in reviewing technical specifications, creating manufacturing instructions, and tooling development. Strong analytical skills and committed to improving efficiency and effectiveness.
NANO T1120 125mm FTT Increase from 84% to 96%
Date Accomplished
01-May-2023
Last Updated Date
17-Aug-2023
Description
I developed a subroutine that help the tool to reduce the torque applied in the tool as a result we improve the metric of unscheduled change practically to zero. The project is control phase.
Tool life average before: 140 cycles per tool
Tool life average after: 180 cycles per tool (Expected to increase to 250 without affecting the FTT).
Conrod New Desing tool PIN bore
Date Accomplished
01-Jun-2022
Last Updated Date
17-Aug-2023
Description
With support of EWIE, we implemented a new tool design that prevent fissures at the negative insert. During 2022 conrod hardness change we were affected with fissures in almost all the cutters.
With this project reduce cost preventing damages to the durables
A fissured cutter causes diameter variation this improvement help to control this issue.
NANO Low Pressure Coolant System Project
Date Accomplished
01-Jan-2022
Last Updated Date
17-Aug-2023
Description
I work in this project due to the high impact in MTTR and MTBF, the project consist in change the main and secondary valves to an upgrade, we use an electro pneumatic repositioning valve.
Before the project we have constantly affectations of damaged valves and obstructed coolant return pipes. Constantly valves damaged and high JPH loosed.
Annual Savings: $ 20K USD
obstructed coolant return pipes events practically null.
This project has an high impact on the quality life to the technician.
JPH Improvement (3.57)
Date Accomplished
27-Apr-2019
Last Updated Date
06-Oct-2022
Description
3.57 JPH improvement Excessive time during scanning Data Matrix code 82% improvement reducing lost time
With this project we improve MTTR and MTBF reducing the reject, SCRAP and reworks.
I have beed playing amateur baseball in a local league at my city for 8 years, I play at three deferent positions: Left fielder, pitcher and second base. I enjoy doing great plays where I need to make an extra effort to catch a ball as an outfielder, I started pitching because in my team does not have many players so I have to learn how to throw a ball in a very reduce strike area. Also batting is really difficult so it is really challenging to make a great hit. In resume this is a team sport but it takes a lot of effort and skills to play your role as good as possible.