Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic

ASAD MASOOD

Lawrenceville,GA

Summary

Integrity engineer II with a comprehensive experience spanning diverse industries, mainly midstream energy infrastructure/ oil and gas. Looking to expand knowledge and experience in the oil and gas industry.

Maintaining a proven track record of establishing new operations and improving existing operations. Able to process engineering calculations and principles to determine risks and present solutions to mitigate them.

Track record of maintaining high standards of quality, productivity, and efficiency. Also possessing experience in project management including specialized techniques and best practices. Adept at leveraging technical and analytical background to align enterprise technology strategies and processes with key business objectives.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Pipeline Integrity Engineer

Southern Company Gas / Atlanta Gas Light
2023.02 - Current
  • Integrity Verification Program, Member of IVP Digs Management team
  • Coordinating transmission line digs closeout packaging with subcontractors and field engineers
  • Ensuring all components of previous and ongoing repair digs are accurate and up to date within Dig tracker M2M software
  • Verifying and assisting field engineers in correct asset data collection for MAOP, ECDA, ICDA, ILI digs
  • Regularly reviewing and QC of various direct assessment packages, ILI reports, DE vendor submittals, and daily pipeline inspection reports, contractor drawing, contractor requests for excavation and As-laid/As-built drawings
  • Making recommendations to improve digs PMO repository structure to improve accuracy and efficiency in records
  • Spotting inaccuracies in GIS data to implement improved system of field to office communication and data transfer
  • Overseeing DE vendors and third-party contractors on dig sites to ensure correct execution of repair work orders, communicating field issues to project managers to mitigate errors in job execution
  • Preparing transmission station and pipeline asset data for gas control risk assessment models
  • Making sure all documents for MAOP verification purposes are submitted to PFL and SFL repository.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Eliminated ineffective product line materials to resolve performance challenges and mitigate corrosion.
  • Participated in design reviews for new construction, analyzing planned piping, conduits and engineering models.
  • Held routine workshops with project management contractors to implement changes to improve as-built and DE report package clarity
  • Participating in technical pipeline workshops related to new and upcoming technologies

Engineer II

Campos EPC
2022.03 - Current
  • NiSource 2022 M&R MAOP Verification/Reconfirmation Project:

- Tasked with delivering a comprehensive MAOP verification package for NiSource owned M&R facilities in various states

- Coordinate site visits involving preliminary and detailed investigation of assets subject to scope of CFR 192 while upholding OSHA safety standards

- Structured an efficient and reliable field data collection process with GIS team to ensure accurate and current station details are recorded

- Preparing updated isometric drawings and coordinating with drafters to QC As-builts and Isometrics

- Thoroughly exercising TVC determination methods to highlight integrity gaps existing in active transmission stations

- Reviewing documentation consisting of WOs, JOs, Pressure tests, As-builts, contractor documents

- Completing drawings, inspection reports, repair sheets, and building KMZ files to support MAOP reconfirmation efforts

- Compiling and QC data for PODS data integration

  • ISO Review Project Transmission (NICOR/NiSource/NIPSCO)

- Reviewing isometric drawings to identify sense line applications and station safety standards

  • ILI Retrofit Project NIPSCO

- Field pipeline inspection to collect essential pipeline data used to determine upgrades for ILI inspections on 100 Mile transmission pipeline in Indiana

- Complete and submit DE reports and anomaly inspection reports

- Establishing and executing daily tasks for contractors to execute to complete digs in an efficient and timely manner

- Holding daily/weekly safety meetings with various parties to prevent accidents at worksite

- Making equipment recommendation for use in the field to mitigate costs and labor hours

- Regularly scaling knowledge of changing CFR and DOT regulations.

  • Illustrated potential obstacles when conducting site assessments for planned projects.
  • Confirmed line locations and staking requirements for worksite
  • Helped performed direct assessments using direct assessment tools

Project Engineer

Organic Oasis NP Farms
2020.05 - 2022.03
  • Designing hydroponics systems, using SolidWorks and Fusion 360, to improve productivity
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Coordinating project deliverables with efficient team of engineers, executives, and building contractors to achieve project objectives
  • Monitored metrics during project execution to maintain compliance with planned costs.
  • Making changes to functional features of submersible pumps, to achieve desired outputs using engineering principles
  • Conducted technical evaluations of engineering designs and test results.
  • Preparing feasibility curves and established close alignment to mitigate estimate inaccuracies during project cycles
  • Auditing contract and schedule of third parties for phase 2 of infrastructure and land development

Key Achievements:

- Modified energy efficient, submersible pump by customizing mechanical features of a 5.5 hp pump to irrigate over 30 acres with only 4KW of solar energy

- Found solutions to lower ground PH levels using preexisting means, staying on budget

- Designed an efficient irrigation system to minimize water usage and maximize crop nutrition using DIDAS software, significantly reducing required material costs while scaling productivity

- Designed insulated structures to combat the harsh regional climates using simulation software and lean building materials

- Effectively used negotiation skills to finalize building and procurement contracts to reduce construction costs by 20%.

Project Engineer

Powergen Development Group
2018.09 - 2020.04
  • Promoted to project engineer for reconstructing Hilton Midtown CHP plant
  • Designed efficient fuel cell systems to present latest green energy solutions to prospective and existing clients
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Analyzed and calculated efficiency curves for CHP units to ensure productivity and efficiency of projects
  • Revising project design with mechanical and civil departments to ensure maintenance friendly plant to minimize the labor hours and future O&M costs
  • Highlight key performance indicators to propose changes in design and material
  • Tasked with submittals, drawing proposal reviews and subcontractor coordination
  • Troubleshooted and maintained onsite issues with natural gas engines and heat recovery systems, cooling towers, chillers, hydrogen fuel cell systems
  • Delivered regular compliance reports to drive process improvement and corrective measures.
  • Coordinated planned project scope, power calculations using ETAP engineering software.

Education

Bachelor of Science - Mechanical Engineering

Valparaiso University
2018

Skills

  • Data Integrity
  • Engineering Principles
  • ASME Standards
  • PHMSA DOT
  • CFR 192, CFR 193
  • Pipeline Integrity
  • MAOP
  • ILI
  • Direct assessment
  • Indirect assessment
  • Documentation review
  • Project management
  • Field supervision
  • CHP
  • Natural Gas
  • Natural Gas engine O&M

Accomplishments

  • OSHA 10 HR
  • VISUAL INSPECTION/MEASUREMENT FOR ATMOSPHERIC CORROSION

Certification

  • OSHA 10 Hr
  • VISUAL INSPECTION/MEASUREMENT FOR ATMOSPHERIC CORROSION
  • AOC FOR NATURAL GAS
  • GAS OPERATOR QUALIFICATIONS

Timeline

Pipeline Integrity Engineer

Southern Company Gas / Atlanta Gas Light
2023.02 - Current

Engineer II

Campos EPC
2022.03 - Current

Project Engineer

Organic Oasis NP Farms
2020.05 - 2022.03

Project Engineer

Powergen Development Group
2018.09 - 2020.04

Bachelor of Science - Mechanical Engineering

Valparaiso University
  • OSHA 10 Hr
  • VISUAL INSPECTION/MEASUREMENT FOR ATMOSPHERIC CORROSION
  • AOC FOR NATURAL GAS
  • GAS OPERATOR QUALIFICATIONS
ASAD MASOOD